ULTRA FLAME DIRECT VENT GAS STOVE
Gas Piping
•
Move the ULTRA FLAME to the desired position.
•
Mark the location for the gas inlet pipe and the
location where the vent pipes will go through the
wall. Remove the appliance.
•
Route a 3/8" minimum NPT iron pipe gas line to the
desired location.
•
Install a shutoff valve to the gas line. Tighten
securely using a pipe joint compound.
•
Check the gas line piping for leaks. Use a soap and
water solution.
CAUTION: Do not use open flame to check leaks.
Electrical Connections
If you wish to make a direct electrical connection to the blower without using the six-foot cord supplied, route a
120 volt, 60 Hz electrical power supply line to the same location. Remove the power cord and connect the
120V line as per the following procedure:
•
Unscrew the speed control unit and pull a few inches away from the junction box
•
Unscrew the two marr connectors attached to the cord (P) and the cord ground
•
Remove the cord and route the supply line through the same holes
•
Make the electrical connection with the same wires the cord was attached to
•
Screw the ground wire to the junction box (G)
•
Screw the speed control unit back in place
CONNECT THE POWER LINE TO THE SAME
WIRES THE CORD WAS CONNECTED TO (P)
If you prefer to use the six-foot cord supplied, just connect it to a 120V outlet.
P
G
P
JUNCTION BOX
SPEED CONTROL
16