Direct Vent Kit For Basement Installation - Drolet SIT 0.820.633 Instruction Manual

Drolet direct vent gas stove instruction manual
Table of Contents

Advertisement

ULTRA FLAME DIRECT VENT GAS STOVE

Direct Vent Kit for Basement Installation

1. Move the stove to its position;
2. Install
temporary
section (4) to visualize where
the opening to be done thru the
wall. Center of the opening
should be at about 23 ½ "above
the base of the stove;
Note: Horizontal run should have a
slope of ¼ in per foot.
3. Make
a
10-1/2"
opening in the wall, 23-1/2"
inches in order to introduce the
radiation shield thru the wall;
4. Cut the radiation shield to
length if necessary and install
as shown. Secure with four #10
1" wood screws;
5. Install the vent terminal (13)
with 2 ½ screws (12). You may
want to remove the vent casing
for
easy
access
manipulation,
Keep
place the wall plate;
6. Insert the 8 in. pipe into the round
opening of the interior black wall
plate (7). Fix the insulation pad (9)
around the 8 in. pipe with the
aluminum tape;
7. Keeping the insulation joint of the 8
in. pipe down, insert it into the vent
terminal wall plate;
8. Secure the 8 in. pipe to vent terminal
wall plate with the metal screw;
9. Fix finally the vent terminal wall plate
with six 2 ½ in screws (12).
10. Insert the 5 in. flexible pipe (3) into
the 8 in. pipe and fix it to the vent
terminal
casing.
temperature
silicone
locking band to secure it in pace;
NOTE: All joints must be sealed with
RTV
silicone,
315°C.
temperature resistance.
an
8
in.
x
10-1/2"
and
only
in
10-1/2" X 10-1/2"
OPENING
Use
high
and
one
(600°F)
Basement Installation
CUT TO LENGTH
12

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sit 0.820.634Ultra flame

Table of Contents