3 Installation

3.1

Installation Requirements

General Requirements
Please note that international conventions, regulations, instructions and guidelines have to be
adhered to when installing the GlobalWatch
The following points must be observed before installation can commence:
-
Permission by the local authority to install such a device must be granted.
-
Trained service personnel must undertake the installation.
-
The GlobalWatch
-
The VHF and GPS Antennas must be installed in a suitable position, where excellent
reception conditions apply (refer to Chapter 3.10 Installation of VHF antenna – page
17)
-
All available interfaces must be installed.
-
The vessels power supply must suffice, and the GMDSS power supply has to be
used.
-
Installation of the pilot plug in conning position (close to the pilot working place).

3.2 Installation Overview

Survey
AIS is considered part of the ship's radio station and is surveyed together with radio
installation. Surveys on SOLAS Convention ships should be carried out in accordance with
the rules laid down in IMO Res. A 746(18) "Survey Guidelines under the harmonised system
of survey and certification" (R) 8, and "Protocol of 1988 relating to the International
Convention for the Safety of Life at Sea, 1974."
TM
The GlobalWatch
TM
GlobalWatch
UAIS Installation Manual
TM
UAIS must be fitted in a suitable place on the bridge.
UAIS consists of one unit, which integrates all necessary modules.
TM
UAIS.