ACR Electronics GLOBALWATCH UAIS Manual page 12

Hide thumbs Also See for GLOBALWATCH UAIS:
Table of Contents

Advertisement

Step-by-Step Installation Procedure:
Mount the GlobalWatch
surveillance and maneuvering.
Use the VHF adapter cable together with the VHF plug and TNC plug to
connect the VHF and GPS antenna cables as well as the antennas.
The sensors, ECDIS, PC, pilot case, long range devices and auxiliary displays can be
connected to the GlobalWatch
connection box. The device is driven by a 24V DC 7A supply, which is connected to
the power terminal at the connection box. The AIS should be connected to an
emergency power source. A battery capacity calculation together with GMDSS-
equipment is needed! Please refer to Appendix 9.1 for examples of battery capacity
calculations.
After performing these steps, the GlobalWatch
The GlobalWatch
ground.
Now configure the required initial system parameters according to Chapter 4 "Starting
the GlobalWatch
TM
GlobalWatch
Ground
Note: The ACR connection box includes a fuse of 6,3A. If it is not used, then the Unit has to
be protected against high current by an external slow blow fuse of 6,3A!
TM
GlobalWatch
UAIS Installation Manual
TM
UAIS close to ships operator workstation for traffic
TM
UAIS has a ground terminal which has to be connected to ship
TM
UAIS" on page 20.
Connection Diagram
UAIS
GPS/VHF Interface Cable
TM
UAIS cabinet by the AIS cable respectively the
TM
UAIS automatically starts operation.
Combined Antenna GPS/VHF
Cable Integrated Splitter
AIS Cable
7
GPS
Connection Box
Fuse
Y1-03-0177A
VHF
Version 1.0

Advertisement

Table of Contents
loading

Table of Contents