Working With Boot Disk Partitions; Switch-Based Zoning; Cabling Options For Single-Channel Hbas; Single Server, Two Single-Channel Hbas, One Switch, Straight-Cable Storage - HP Integrity BL890c - i2 Server Software Manual

Fibre channel host bus adapters software guide for windows
Hide thumbs Also See for Integrity BL890c - i2 Server:
Table of Contents

Advertisement

Working with boot disk partitions

Before creating a boot disk, you must start with a clean, unpartitioned virtual disk.
Create a LUN that is at least 32 GB for W2K3 and 46 Gb for W2K8.
When booting from a RAID array that has other virtual disks attached to other servers, be aware
that when setting up booting for the new server, the installation program may display a list of
partitions visible for loading the operating system. The display contains a disk for every controller
port accessible by the HBA.
HP recommends that only one instance of the boot LUN be visible to the server during the initial
installation. The installation may fail if multiple instances of the boot LUN are available to the
server.

Switch-based zoning

You must be familiar with switch-based zoning. For specific information about zoning for your
environment, see your switch's installation guide.

Cabling options for single-channel HBAs

SAN boot is supported in the zoned single-channel HBA configurations, as shown in
Figure
6.
Figure 1 Single server, two single-channel HBAs, one switch, straight-cable storage configuration
.
16
Boot from SAN
Figure 1
through

Advertisement

Table of Contents
loading

This manual is also suitable for:

Integrity rx2800 - i2Bl860c

Table of Contents