WARNING:
the rack and warn you if there is any excessive motion or tipping.
Repeat the installation steps to install the remaining casters.
10.
Using a wrench, raise the rack by turning the caster jack screws clockwise, a little at a time, until the
11.
rack is high enough to slide the pallet out from under the rack.
IMPORTANT:
the jack screw on all casters the same number of turns to extend the casters by the same
amount. Continue turning the jack screws until you reach the appropriate height.
Slide the pallet out from underneath the rack and set aside.
12.
Lower the rack by turning the caster jack screws counterclockwise until the rack is as close to the
13.
floor as possible but still high enough to clear any obstacles in the path to its final position.

Moving the seismic rack

WARNING:
Have at least two people move the rack on a level floor. If the floor is uneven, use at least
four people.
When pushing the rack, push on the rack frame only. Do not push or pull on the doors.
Do not push on the sides of the rack. Push from the front or rear of the rack only.
Verify that the area where you intend to install the rack and the path to the area are clean
and that the floor surface is smooth.
To move the seismic rack:
Verify that the eight leveling feet are set to the maximum height. The leveling feet are shipped from
1.
the factory in the fully raised position but can be adjusted using a 5/16-inch Allen wrench.
Roll the rack into position according to the floor plan drawings. For more information, see the
2.
documentation that ships with the rack.
Using an adjustable wrench, lower the rack by turning the caster jack screws counterclockwise until
3.
the rack rests on the floor.

Removing the casters

Using a wrench, lower the rack by turning the caster jack screws counterclockwise.
1.
Remove the mounting bolts.
2.
Remove the caster support and the mounting plate.
3.
Remove the backing plate from behind the rack frame. Push on the mounting plate through the hole
4.
at the front of the frame to dislodge the backing plate, if necessary.

HP BLc7000 Enclosure Seismic Kit

Install the components of the HP BLc7000 Enclosure Seismic Kit in the following order:
Install the rack mount bracket ("Installing the rack mount bracket" on page 8).
1.
Install the cable management system ("Installing the cable management system" on page 9).
2.
Install the enclosure into the rack ("Installing an HP BladeSystem c-Class enclosure" on page 10).
3.
Do not raise the rack more than necessary. Have someone watch as you raise
Do not turn the jack screw on one caster more than four turns clockwise. Turn
To prevent personal injury and damage to the rack:
Rack options 7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bladesystem c7000

Table of Contents