Maintenance - Briggs & Stratton 100 AMP AUTOMATIC TRANSFER SWITCH Installation And Operator's Manual

Amp automatic transfer switch with service disconnect and symphony ii power management system
Table of Contents

Advertisement

Available languages

Available languages

Maintenance

The transfer switch is designed to be maintenance free under
normal usage. However, inspection and maintenance checks
should be made on a regular basis. Maintenance will consist
mainly of keeping the transfer switch clean.
Visual inspections should be done at least three times each
year. Access to the transfer switch and optional remote
modules must not be obstructed. Keep 3 feet (92 cm)
clearance around transfer switch. Check for an accumulation
of dirt, moisture and/or corrosion on and around the
enclosure, loose parts/hardware, cracks and/or discoloration
to insulation, and damaged or discolored components.
Exercise the transfer switch and Symphony II system at
least once every three months as described in Testing the
Automatic Transfer Switch and in Testing the Symphony II
Power Management System unless a power outage occurs
and the entire home generator system has gone through
an automatic sequence. Allow generator to run for at least
10 minutes during exercise cycle.
Contact a licensed electrical professional to inspect and
clean the inside of the enclosure and other components of
your home generator system at least once a year.
20
When Calling for Assistance
You must have the Model Number and Serial Number from
each transfer switch or remote module ID label at hand if it is
necessary to contact a local service center regarding service
or repair. Obtain this information from the unit ID labels
located on or inside device. For convenience, record the
information on the inside front cover of this manual.
To contact Briggs & Stratton call 800-743-4115, between
8:00 AM and 5:00 PM CT.
Installation Inspection
Before placing the system into service, inspect the entire
installation carefully.
Complete the "Installation Checklist" supplied with the
generator as you make the inspection. Ensure all items have
been filled-in and all signatures have been obtained. Instruct
the owner to mail the white copy to the address shown on
the checklist.
BRIGGSandSTRATTON.COM

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

200 amp automatic transfer switch100200

Table of Contents