Download Print this page
Asus PA329C Service Manual
Hide thumbs Also See for PA329C:

Advertisement

Quick Links

Monitor Service Manual
Model: PA329C
Version no.: 0
Release date: 2024/11/22
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the PA329C and is the answer not in the manual?

Questions and answers

Summary of Contents for Asus PA329C

  • Page 1 Monitor Service Manual Model: PA329C Version no.: 0 Release date: 2024/11/22...
  • Page 2 ASUS will only be responsible for or indemnify you for loss, damages or claims based in contract, tort or infringement under this Warranty Statement. This limit also applies to ASUS’ suppliers and its reseller. It is the maximum for which ASUS, its suppliers, and your reseller are collectively responsible.
  • Page 3 Table of Contents 1. Safety Precautions ......................4 2. Exploded View ......................... 5 3. Disassembly SOP ......................6 3. Assembly SOP ......................12 3. Trouble Shooting ......................18...
  • Page 4 1. Safety Precautions FOR PRODUCTS CONTAINING LASER: DANGER- Invisible laser radiation when open. AVOID DIRECT EXPOSURE TO BEAM. CAUTION- Use of controls or adjustments or performance of procedures other than those specified herein may result in hazardous radiation exposure. CAUTION- The use of optical instruments with this product will increase eye hazard. TO ENSURE THE CONTINUED RELIABILITY OF THIS PRODUCT, USE ONLY ORIGINAL MANUFACTURER'S REPLACEMENT PARTS, WHICH ARE LISTED WITH THEIR PART NUMBERS IN THE PARTS LIST SECTION OF THIS SERVICE MANUAL...
  • Page 5 2. Exploded View Item Description Q'ty Item Description Q'ty PANEL KEY BOARD #SCRW TP-B FPH M2*4L BEZEL B-ZN ASSY SHIELDING MYLAR LAMP REAR CASE SCRW FPHM4*10L #SCRW TP-S FPH MYLAR USB M3*6(6/1.3) BZN POWER BOARD MYLAR BTM MAIN BOARD STAND ASSY SCRW TAP FLAT+EXT EMI BOARD M4*6L ZN-W...
  • Page 6 Disassembly SOP Preparation before disassemble 1. Clean the room for disassemble 2. Identify the area for monitor 3. Check the position that the monitors be placed and the quantity of the monitor; prepare the area for material flow; according to the actual condition plan the disassemble layout 4.
  • Page 7 4. Unlock 4 screws on Torque : Rear Case. 8~10 Screw: #SCRW Kg-cm FPHM4*10L(7.7/1.6)B- ZNNY) 5. Disassemble bezel and Rear Case according to the red arrows. 6. Turn over the monitor 7. Separate Rear Case from panel holders. 8. Disassemble Key Board wire.
  • Page 8 1. Disassemble USB shielding and USB Board. Torque : 2. Unlock screws from USB Board. 8~10 Screw:#SCRW PH Kg-cm INT/TOO M3*9TP-S C-ZN 3. Disassemble USB cable from USB Screw- Board. driver Board 4. Remove USB Shielding. 5. Disassemble USB BD Board from USB Shielding.
  • Page 9 1. Disassemble Shielding. 2. Remove tapes and Mylar from Shielding. 3. Disassemble tape & Mylar from Shielding. 4. Disassemble FFC from Panel and horn and lamp wire. 5. Remove Shielding from panel. 6. Disassemble LVDS Cable from Panel.
  • Page 10 1. Disassemble Bezel from Panel. 2. Disassemble tape. 3. Disassemble lamp wire from panel. 1. Unlock screws*9 on LED Driver Power Board Shielding Board Torque : Screw:#SCRW PH 8~10 INT/TOO M3*9TP-S C- Main Board Kg-cm Board 2. Unlock screws*1 for ground screw.
  • Page 11 4. Disassemble wire from Board. Disassemble Key Board 1. Disassemble tape from Key Board. 2. Unlock 3 screws from Key Board. Screw:#SCRW TP-B FPH Torque : M2*4L B-ZN Screw- 2.0±0.5 driver Kg-cm Key Board Disassemble Key Board from Rear Key Board Case.
  • Page 12 3. Assembly SOP Preparation before assemble 1. Clean the room for work 2. Identify the area for material 3. Prepare the implement, equipment and materials as bellow: 1) Working table 2) Screw-driver 3) Glove 4) Cleaning cloth 5) ESD protection After unplugging the power cord, the power Board still have power energe.
  • Page 13 4. Assemble all boards LED Driver Power Board to Shielding. Board 5. Lock 9 pcs 4 boards screws. Main Board Torque : 8~10 Screw:#SCRW PH Board Kg-cm INT/TOO M3*9TP-S C- 6. Lock 1 pcs DP screws. Torque : Screw P/N: 5.0±0.5 Kg- #SCRW TP-S FPH M3*6(6/1.3) BZN...
  • Page 14 3. Lock 1pcs screw to fix USB Board on the Main Shielding Screw:#SCRW PH Torque : 8~10 INT/TOO M3*9TP-S C- Kg-cm Take panel and insert wire: 1. Insert lamp wire to panel. 2. Stick Sponge to panel (Red Mark) 3. Stick 4 pcs tape to panel (Blue Mark) Assemble Bezel and Stick tape...
  • Page 15 tapes to Shielding. 4. Insert lamp wire and Speaker wire to Board. 5. Insert LVDS Cable to Panel then fix by 1 tape. 1. Stick 1 pcs Mylar to Shielding. 2. Stick TAPE AL MYLAR to Shielding and panel...
  • Page 16 Assemble CTRL BD to Rear Case Torque : 1. Insert Key Board wire 2.0±0.5 Kg- to Key Board. 2. Assemble Key Board Key Board to Rear Case then lock 3 screws. Screw:#SCRW TP-B FPH M2*4L B-ZN Key Board Screw- driver 3.
  • Page 17 Assemble Rear Case and lock screws 1. Insert Key Board wire to Main Board. 2. Assemble Rear Case. 3. Lock 4 pcs screws to fix Rear Case. Screw: #SCRW Torque : 8~10 Screw- FPHM4*10L(7.7/1.6)B- Kg-cm driver ZNNY) 4. Lock 3 pcs screws on Rear Case.
  • Page 18 3. Trouble Shooting...