Install Guide
CC300 CC500 CC700 Command Connector
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the CC500 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Introduction
What's in the box
Lists all components included with the Verkada Command Connector for setup.
Overview
Provides a visual and descriptive overview of the Verkada Command Connector's features and ports.
Server Rack Mounting Guidance
Details specific guidance and hardware for securely mounting the Command Connector in server racks.
Installation
Outer Mount Rail Installation
Step-by-step instructions for installing the outer mount rail onto server rack posts.
Front Cover Removal and Installation
Procedure for safely removing and reattaching the front cover of the Command Connector.
Inner Mount Rail Installation
Instructions for attaching the inner mount rail to the Command Connector unit.
Connector Mounting
Steps for aligning and sliding the Command Connector into the installed server rack rails.
HDD Replacement
Detailed guide on how to replace the Hard Disk Drives (HDD) in the Command Connector.
Appendix
Compliance Information
Details FCC compliance statements and operational guidelines for the device.
Support Contact
Provides contact information for Verkada technical support and assistance.