TYAN THUNDER 2 ATX Manual page 66

Table of Contents

Advertisement

Chapter 5
Checkpoint Code
Locked key checking is over. Checking for a memory size mismatch with
84h
CMOS RAM data next.
The memory size check is done. Displaying a soft error and checking for a
85h
password or bypassing WINBIOS Setup next.
The password was checked. Performing any required programming before
86h
WINBIOS Setup next.
The programming before WINBIOS Setup has completed. Uncompressing
87h
the WINBIOS Setup code and executing the AMIBIOS Setup or
WINBIOS Setup utility next.
Returned from WINBIOS Setup and cleared the screen. Performing any
88h
necessary programming after WINBIOS Setup next.
The programming after WINBIOS Setup has completed. Displaying the
89h
power on screen message next.
The first screen message has been displayed. The <WAIT...> message is
8Bh
displayed. Performing the PS/2 mouse check and extended BIOS data
area allocation check next.
8Ch
Programming the WINBIOS Setup options next.
The WINBIOS Setup options are programmed. Resetting the hard disk
8Dh
controller next.
The hard disk controller has been reset. Configuring the floppy drive
8Fh
controller next.
The floppy drive controller has been configured. Configuring the hard disk
91h
drive controller next.
Initializing the bus option ROMs from C800 next. See page 71 for
95h
additional information.
96h
Initializing before passing control to the adaptor ROM at C800.
Initialization before the C800 adaptor ROM gains control has completed.
97h
The adaptor ROM check is next.
The adaptor ROM had control and has now returned control to BIOS
98h
POST. Performing any required processing after the option ROM returned
control.
Any initialization required after the option ROM test has completed.
99h
Configuring the timer data area and printer base address next.
Set the timer and printer base addresses. Setting the RS-232 base address
9Ah
next.
Returned after setting the RS-232 base address. Performing any required
9Bh
initialization before the Coprocessor test next.
Required initialization before the Coprocessor test is over. Initializing the
9Ch
Coprocessor next.
Coprocessor initialized. Performing any required initialization after the
9Dh
Coprocessor test next.
Initialization after the Coprocessor test is complete. Checking the extended
9Eh
keyboard, keyboard ID, and Num Lock key next. Issuing the keyboard ID
command next.
Description
66

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thunder 2 s1696dlua

Table of Contents