Lauda UC 65 Operation Manual

Ultracool chillers

Advertisement

OPERATION MANUAL
Ultracool chillers
UC 2, UC 4, UC 8, UC 14, UC 24, UC 50, UC 65, UC 80, UC 100
DMI-0217-12
24/11/2022
Read this manual prior to performing any task!

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UC 65 and is the answer not in the manual?

Questions and answers

Summarization of Contents

WARNINGS
General Safety and Operational Precautions
Important safety and operational precautions for using the chiller.
INTRODUCTION
General Notes and Recommendations
General information and recommendations for chiller operation and maintenance.
Safety Regulations
Mandatory safety rules and procedures for handling, operation, and maintenance.
UNPACKING
Reception and Inspection
Procedures for checking the unit and accessories upon delivery for damage.
Transportation Guidelines
Guidelines for safely moving and transporting the Ultracool unit.
Site Requirements
Requirements for the installation location, including surface and environmental conditions.
ULTRACOOL UNIT DESCRIPTION
Setup of UC 2 and UC 4 Models
Instructions for setting up the UC 2 and UC 4 models, including component identification.
Setup of UC 8 to UC 65 Models
Instructions for setting up the UC 8 to UC 65 models, including component identification.
Setup of UC 80 and UC 100 Models
Instructions for setting up the UC 80 and UC 100 models, including component identification.
Identification Labels
Details on labels and markings found on the Ultracool unit for identification.
Water Connection
Guidelines and requirements for connecting the water circuit to the chiller.
Electrical Connection for UC 2 and UC 4
Procedures for the electrical connection of UC 2 and UC 4 models.
Electrical Connection for UC 8 to UC 100
Procedures for the electrical connection of UC 8 to UC 100 models.
Additional Electrical Connections
Information on special terminals for remote operation and alarm signals.
STARTUP
Operating Conditions
Defines the permissible inlet water and ambient air temperatures for operation.
Chiller Startup Procedure
Step-by-step guide for starting up the Ultracool chiller unit.
CHILLER CONTROLS
Control and Monitoring Elements
Overview of the components used for controlling and monitoring the chiller's status.
UC Controller Functions
Detailed explanation of the controller buttons and their functions.
Chiller Operation
Instructions on how to operate the chiller remotely and set parameters.
Preheating Function
Details on the automated preheating system to maintain water temperature.
Ethernet Configuration
Steps to configure the chiller's IP address for remote access via Ethernet.
LAUDA.LIVE Cloud Service
Information on connecting the chiller to the LAUDA.LIVE cloud service.
MAINTENANCE
Basic Maintenance Tasks
Routine weekly, monthly, and yearly maintenance tasks for the chiller.
TROUBLESHOOTING
Saving Log File for Alarm Diagnosis
Procedure to save operational logs to aid in diagnosing alarm issues.
Alarms and Warnings List
List of common faults, causes, solutions, and restart procedures.
TECHNICAL FEATURES
Technical Features Overview
Detailed specifications and performance data for the Ultracool unit models.
Energy Efficiency Information
Data on energy performance and efficiency ratings as per Ecodesign directive.
LOG BOOK
Log Book Template
A template for recording maintenance, service, and operational events.
ANNEXES
Water Quality Specifications
Specifications for water quality required to protect the chiller's internal components.

Table of Contents

Save PDF