Donaldson PowerCore CP Series Installation, Operation And Maintenance Manual

Mist collectors

Advertisement

INSTALLATION, OPERATION AND
MAINTENANCE MANUAL
PowerCore
Mist Collectors
®
Series CPV
Publication 1A65198027 - 3022J
0218
MASTER LANGUAGE - ENGLISH

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PowerCore CP Series and is the answer not in the manual?

Questions and answers

Summarization of Contents

Installation
Mounting over aperture
Steps for correctly positioning and sealing the collector on an opening.
Compressed air requirements
Specifies the necessary clean, dry, oil-free compressed air supply.
EEx controls
Special control systems for potentially explosive atmospheres.
Explosion protection
Measures and requirements for explosion safety in the installation.
Antistatic earthing
Importance and procedure for connecting the earthing post to prevent static build-up.
Commissioning
Installation check list
Checklist to verify correct installation before operation.
Start-up sequence
Step-by-step procedure for starting the equipment after installation.
Shut-down sequence
Procedure for safely stopping the equipment and clearing deposits.
Operation
Principle of operation
Explains how the collector functions during filtering and cleaning cycles.
Cleaning operation
Details on the intermittent cleaning process using compressed air.
Maintenance
Routine inspection
Regular checks to maintain optimum performance and identify potential issues.
Servicing schedule
Guidelines for weekly and monthly checks and maintenance tasks.
Valve diaphragm replacement
Step-by-step procedure for replacing the diaphragm in the valve.
Filter pack replacement
Instructions for safely removing and installing new filter packs.
Fan assembly removal/replacement
Procedures for removing and reinstalling the fan assembly.

Table of Contents