4-3. Positioning Jumper Links (230/400V 3-Phase Models)
230 Volts
400 Volts
!
Disconnect and lockout/tagout
input power before connecting
input conductors from unit.
Follow established procedures
regarding the installation and
removal
of
lockout/tagout
devices.
Check input voltage available at site.
1
Jumper Link Label
Check label − only one is on unit.
2
Jumper Links
Move jumper links to match input volt-
age.
Close and secure access door.
Follow established lockout/tagout
procedures to put unit in service.
956142845_5_14_A
OM-251958 Page 13
Need help?
Do you have a question about the MigMatic 380 and is the answer not in the manual?