Chappee 1.65 FF HTE Installers And Users Instructions

Chappee 1.65 FF HTE Installers And Users Instructions

Wall-mounted condensing boilers

Advertisement

1 1 1 1 1 .45 FF HTE
.45 FF HTE
.45 FF HTE
.45 FF HTE
.45 FF HTE
1 1 1 1 1 .55 FF HTE
.55 FF HTE
.55 FF HTE
.55 FF HTE
.55 FF HTE
1 1 1 1 1 .65 FF HTE
.65 FF HTE
.65 FF HTE
.65 FF HTE
.65 FF HTE
Wall-mounted
condensing boilers
Installer's and User's Instructions
2

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 1.65 FF HTE and is the answer not in the manual?

Questions and answers

Summarization of Contents

Instructions Pertaining to the User
1. Instructions Prior to Installation
This boiler is designed to heat water at a lower than boiling temperature at atmospheric pressure.
2. Instructions Prior to Commissioning
Initial lighting of the boiler must be carried out by a licensed technician. Ensure the following operations are carried out:
3. Commissioning of the Boiler
To correctly light the burner proceed as follows: 1) provide power supply to the boiler; 2) open the gas cock; 3) follow the directions given below...
4. Filling the Boiler
Important: Regularly check that the pressure displayed by the pressure gauge is 1 to 1.5 bar, with boiler not operating.
5. Turning Off the Boiler
To shut down the boiler switch off the electrical supply to the appliance.
6. Prolonged Standstill of the System. Frost Protection
We recommend you avoid draining the whole system as water replacements engender purposeless and harmful limestone deposits...
7. Servicing Instructions
To maintain efficient and safe operation of your boiler have it checked by a Qualified Service Engineer at the end of every operating period.
Instructions Pertaining to the Installer
8. General Information
The following remarks and instructions are addressed to Service Engineers to help them carry out a faultless installation.
9. Instructions Prior to Installation
This boiler is designed to heat water at a lower than boiling temperature at atmospheric pressure.
10. Boiler Installation
Decide upon the boiler location, then tape the template on the wall. Connect the pipework to the gas and water inlets...
11. Boiler Size
Boiler size
12. Installation of Flue and Air Ducts
We guarantee ease and flexibility of installation for a gas-fired forced draft boiler thanks to the fittings and fixtures supplied.
13. Connecting the Mains Supply
Electrical safety of the appliance is only guaranteed by correct grounding, in compliance with the applicable laws and regulations.
14. Gas Valve Adjustment
Carry out the following operations in the given sequence: 1) Calibration of the maximum heat output. Check that the CO₂ measured on the flue...
15. Setting the Boiler Parameters
The boiler parameters may only be modified by professionally qualified staff proceeding as follows:
16. Control and Operation Devices
The boiler has been designed in full compliance with European reference standards and is equipped with the following
17. Positioning of the Ignition and Flame Sensing Electrode
Positioning of the ignition and flame sensing electrode
18. Check of Combustion Parameters
To measure combustion performance and hygiene levels of combustion products, the forced draught boiler models are equipped with two test points...
19. Activating the Chimney-Sweeper Function
To facilitate measurement of the combustion efficiency and improve the cleanliness of the production products, the flue-sweeper function can be activated...
20. Annual Service
To ensure the boiler operates at peak efficiency, the following checks must be performed every year:
21. Boiler Schematic
Boiler schematic
22. Illustrated Wiring Diagram
Illustrated wiring diagram
23. Technical Data
Technical data