Shared disk requirements

NOTE:
Do not allow more than one node access the shared storage devices at the same time until Cluster
service is installed on at least one node and that node is online. This can be accomplished through
selective storage presentation, SAN zoning, or having only one node online at all times.
All shared disks, including the Quorum disk, must be accessible from all nodes. When testing
connectivity between the nodes and the LUN, only one node should be given access to the LUN
at a time.
All shared disks must be configured as basic (not dynamic).
All partitions on the disks must be formatted as NTFS.

Cluster installation

During the installation process, nodes are shut down and rebooted. These steps guarantee that the
data on disks that are attached to the shared storage bus is not lost or corrupted. This can happen
when multiple nodes try to simultaneously write to the same disk that is not yet protected by the cluster
software.
Use
Table 15
Table 15 Power sequencing for cluster installation
Step
Setting up net-
works
Setting up
shared disks (in-
cluding the Qur-
om disk)
Verifying disk
configuration
Configuring the
first node
Configuring addi-
tional nodes
Post-installation
To configure the Cluster service on the storage system, an account must have administrative permissions
on each node.
to determine which nodes and storage devices should be presented during each step.
Additional
Node 1
Nodes
On
On
On
Off
Off
On
On
Off
On
On
On
On
Storage
Comments
Verify that all storage devices on the
Not
shared bus are not presented; Power on
Presented
all nodes.
Shut down all nodes. Present the shared
Presented
storage, then power on the first node.
Shut down first node, power on next
Presented
node. Repeat this process for all cluster
nodes.
Shut down all nodes; power on the first
Presented
node.
Power on the next node after the first
Presented
node is successfully configured. Com-
plete this process for all cluster nodes.