Page 1
When the DTIJ is started " " the communication indicator " " will remain flashing. DTIJ Model Interface Code Interface Type DTU WBS1-V001 ① Wi-Fi Router connection 2.1 APP download and installation Android platform, please scan QR code to download APP and install it.
Page 2
2.2 User registration & login (1) Open the APP and click the "Register" button on the home page to enter the Register " page. (2) After filling in the necessary information on the " Register" page, check the "User agreement and Privacy Policy", click the "Get Verification Code"...
Page 3
2.3 Add DTU & Inverter (1) Click the "+" sign in the upper right corner of the "Equipment List" page to enter the "Add Collector" page. (2) After filling in the necessary information on the "Add DTIY' page, click the "Save" button to finish adding the collector.
Page 4
2.4 Networking parameter setting (1) On the "Device List" page, click the picture on the left side of the DTU to enter the "DTU details" page, click the "Wi-Fi" button, enter the correct Wi-Fi name and password, and click the "0K" button to complete the Wi-Fi parameter configuration.
Page 5
(2) Click the "Network Test" button on the "Collector Details" page. When the DTU Wi-Fi parameters are configured correctly and successfully connected to the Internet, you will receive a prompt of "Network Test Successful".
Page 6
2.5 Observation & configuration of inverter (1) On the "device list" page, expand the DTU, click the photo of the inverter, and it will jump to the "Status" page of the corresponding inverter. Users can switch to other pages through the buttons at the bottom of the page to observe more detailed inverter information.
Need help?
Do you have a question about the DTU WBS1-V001 and is the answer not in the manual?
Questions and answers