RHINO 2409 Operator's Manual page 61

Loader
Hide thumbs Also See for RHINO 2409:
Table of Contents

Advertisement

LOADER BOOM ASSEMBLY
Inspect condition of each arm section weldment
Ensure all pins are in place.
Ensure all bolts and screws are properly
installed.
Check condition of
points.
Ensure each hydraulic cylinder is installed and
retained correctly. Ensure the proper size pins
are used to retain the cylinders in place and are
secured properly. OPS-L-0005_B
HYDRAULIC LINE INSPECTION
Check
for
hydraulic
cylinders and fittings. IMPORTANT: DO NOT
use your hands to check for oil leaks. Use a
piece of heavy paper or cardboard to check for
hydraulic oil leaks.
Inspect the condition of the valve weldment.
Ensure fitting is properly connected
Inspect condition of bushings. OPS-L-0018_B
BUCKET INSPECTION
Ensure all pins are in place.
Ensure each hydraulic cylinder is installed and
retained correctly. Ensure the proper size pins
are used to retain the cylinders in place and are
secured properly.
Inspect the condition of the bucket lug
weldments.
Inspect condition of bushings.
OPS-L-0007_B
2409 01/11
© 2011 Alamo Group Inc.
OPERATION
bushings at boom pivot
leaks
along
hoses,
Operation Section 4-15
Hydraulic Hoses
Bucket Pins

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents

Save PDF