Table of Contents

Advertisement

Quick Links

A B B M E A S U R E M E N T & A N A LY T I C S | O P E R AT I N G I N S T R U C T I O N
UviTec
Analyzer
UV254
Introduction
UviTec
The UniTec UV254 M3000 is a continuous UV 254nm
UV254 Analyzer M3000
organic testing monitor which utilizes ABB's Ortho-
Beam technology, shown in the following
illustration.
The UniTec UV254 M3000's innovative Ortho-Beam
technology is designed to take sensor readings at
90-degree angles to each other through two
different path lengths through a rectangular quartz
flow cell. The two sensor readings give the amount
of light able to pass through two different path
lengths of test water. From these two
measurements alone, the UV transmittance (UVT) or
UV absorbance (UVA) of the test water is calculated
without continuous need for calibration with
DI water.
Measurement made easy
Introduction
Further information is available from:
www.abb.com/measurement,
or by scanning this code:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UviTec UV254 and is the answer not in the manual?

Questions and answers

Summary of Contents for ABB UviTec UV254

  • Page 1 — UviTec The UniTec UV254 M3000 is a continuous UV 254nm Further information is available from: UV254 Analyzer M3000 organic testing monitor which utilizes ABB’s Ortho- www.abb.com/measurement, Beam technology, shown in the following or by scanning this code: illustration. The UniTec UV254 M3000’s innovative Ortho-Beam...
  • Page 2 UviTec UV254 Analyzer – M3000 v 2.1 – ABB Ltd 1150 Champlain Court Whitby ON L1N 6K9 Canada (905) 665-6888 info@realtechwater.com ABB Ltd...
  • Page 3: Table Of Contents

    UviTec UV254 Analyzer – M3000 v 2.1 Contents Overview ___________________________________________________________________________ 5 Safety and Warranty Registration ________________________________________________________ 6 Safety Instructions _______________________________________________________________ 6 Warranty Registration _____________________________________________________________ 6 Technical Specifications _______________________________________________________________ 7 Installation __________________________________________________________________________ 8 Site Assessment _________________________________________________________________ 8 Unpacking and Inspection _________________________________________________________ 9 Assembly _____________________________________________________________________ 10 5.3.1...
  • Page 4 Parts and Accessories _______________________________________________________________ 41 Cabinet Dimensions and Clearance _____________________________________________________ 42 List of Tables Table 1: UviTec UV254 M3000 Specifications ____________________________________________________ 7 Table 2: Installation site assessment checklist and recommendations _________________________________ 8 Table 3: Items and quantity list for unpacking ____________________________________________________ 9...
  • Page 5 UviTec UV254 Analyzer – M3000 v 2.1 Figure 5.5: Lower clamp ____________________________________________________________________ 10 Figure 5.6: Tighten clamp ___________________________________________________________________ 10 Figure 5.7: Orient ribbon cable _______________________________________________________________ 11 Figure 5.8: Snap receptacle into place; secure clamps ____________________________________________ 11 Figure 5.9: Attach cable to control board _______________________________________________________ 11 Figure 5.10: Cabinet mounting _______________________________________________________________ 12...
  • Page 6: Overview

    UviTec UV254 Analyzer – M3000 v 2.1 Overview Thank you for purchasing from ABB Ltd The UviTec UV254 M3000 is a continuous UV 254nm organic testing monitor which utilizes ABB’s Ortho-Beam technology, shown in the following illustration. The UviTec UV254 M3000’s innovative Ortho-Beam technology...
  • Page 7: Safety And Warranty Registration

    To activate your standard two-year warranty for your product, the end user of the product is responsible for filling out the warranty registration information for their company. Failure to do so could void the warranty. See the warranty section for full details on ABB’s two-year warranty program. Please register online at: www.realtechwater.com/product-registration.
  • Page 8: Technical Specifications

    UviTec UV254 Analyzer – M3000 v 2.1 Technical Specifications The UviTec UV254 M3000’s Ortho-Beam technology provides affordability, increased accuracy, and reduced maintenance. Table 1: UviTec UV254 M3000 Specifications CHARACTERISTIC TECHNICAL DATA RANGE 10-100% UVT 0.0025-1 UVA ACCURACY ± 0.5% FS RESOLUTION 0.1% UVT 0.001 UVA...
  • Page 9: Installation

    Prior to installation, the site should be assessed to collect all relevant information that may affect the installation or operation of the system. ABB has provided a checklist that can be used to ensure any installation or operational problems can be addressed, resulting in the most efficient and effective installation and startup of the system.
  • Page 10: Unpacking And Inspection

    UviTec UV254 Analyzer – M3000 v 2.1 CHECK air bubbles, large suspended solids etc.) If necessary, use a needle valve to lower flow and maintain less than 20 Pressurized system able to PSI in analyzer. Splice connection from the side of the pressurized pipe, to supply 300-1000 ml/min flow? avoid air bubbles from top and sediment on bottom.
  • Page 11: Assembly

    UviTec UV254 Analyzer – M3000 v 2.1 Assembly Installing the Rotating Arm 5.3.1 1. Position the flat side of the motor shaft so it is facing out as shown in Figure 5.1. 2. Place the rotating arm on the motor shaft as shown in Figure 5.2, pushing down as far as possible.
  • Page 12: Installing The Ribbon Cable

    UviTec UV254 Analyzer – M3000 v 2.1 Installing the Ribbon Cable 5.3.3 Note: Ensure not to pinch the ribbon cable when installing as this can create a weak spot in the cable and reduce the life of the cable. 1. Position the flex ribbon connector to the rotating arm as shown in Figure 5.7.
  • Page 13: Mounting

    UviTec UV254 Analyzer – M3000 v 2.1 Mounting The monitor should be attached to the wall at all four of the mounting holes provided (top left and right; bottom left and right in Figure 5.10). Use screws and washers that are sturdy enough to support the cabinet weight of approximately 20 lbs.
  • Page 14: Figure 5.13: Plumbing Ports

    UviTec UV254 Analyzer – M3000 v 2.1 There are two push-in fittings on the side of the cabinet labeled IN and OUT as shown in Figure 5.13. 1. Connect ¼” OD flex tubing from the process to the IN-push connector on the monitor.
  • Page 15: Turbidity And Filtration

    Because of this, ABB’s M Series monitors include an optional 550 nm turbidity compensation measurement. Since 550 nm light is not significantly sensitive to organic...
  • Page 16: Electrical Connections

    UviTec UV254 Analyzer – M3000 v 2.1 Electrical Connections The 24 VDC power is supplied to the UviTec UV254 M3000 by means of a DC power adapter that is plugged into a wall outlet of 100-240 VAC 50/60 Hz. The two 24 VDC wires from the adapter are run through the connector in the bottom of the monitor.
  • Page 17: Start-Up

    See Section 9, Menu Structure. IMPORTANT: In areas of high humidity, the UviTec UV254 M3000 door must remain closed for a minimum of three hours to allow for the dehumidifier to dry the air inside the enclosure. (Refer to Section 13).
  • Page 18: Zeroing (Calibration)

    UviTec UV254 Analyzer – M3000 v 2.1 Zeroing (Calibration) The monitor must be calibrated before accurate UVT/ UVA data can be read. Two methods for calibration can be used: • Zero monitor to DI or RO water reference of 100% UVT •...
  • Page 19: Using Known Water Method

    UviTec UV254 Analyzer – M3000 v 2.1 Using Known Water Method Carry out these steps: 1. Press the Zero button on the monitor. The Calibration menu appears. 2. Scroll down to ‘Custom Zero’ using the down arrow button. Press Enter.
  • Page 20: Menu Structure

    UviTec UV254 Analyzer – M3000 v 2.1 Menu Structure MENU ITEM DESCRIPTION AVERAGING On: 1 Off: 0 Average Press ‘Enter’ then up/down to select running average for last 10 readings (Default = 0: Off) UVT/UVA MODE 0 : UVT 1 : UVA 2 : Crltn.
  • Page 21 UviTec UV254 Analyzer – M3000 v 2.1 MENU ITEM DESCRIPTION CLEANING SYSTEM Press ‘Enter’ then up/down to select 0 or 1 to turn on automatic cleaning system if Enable Clean supplied (Default = 0) Press ‘Enter’ then up/down to select 0 or 1 to reset fluid alarms after refilling fluid...
  • Page 22 UviTec UV254 Analyzer – M3000 v 2.1 MENU ITEM DESCRIPTION DATALOG FREQUENCY 0: No Data Log 1: 10 seconds 2: 1 minute 3: 10 minutes 4: 1 hour Select Press ‘Enter’ then up/down 1 - 4 to select logging frequency (Default = 1: 10 seconds)
  • Page 23 UviTec UV254 Analyzer – M3000 v 2.1 MENU ITEM DESCRIPTION Lamp Low Press ‘Enter’ then up/down to select low lamp output alarm (Default = 1) Lamp High Press ‘Enter’ then up/down to select high lamp output alarm (Default = 1) Cleaning Press ‘Enter’...
  • Page 24: 10 4-20 Ma Setup

    UviTec UV254 Analyzer – M3000 v 2.1 10 4-20 mA Setup The UviTec UV254 M3000 is equipped with a 4-20 mA output capability. The 4-20 mA can be set to produce a user selectable UVT or UVA value for the low (4 mA) and a separate value for high (20 mA) up to 110% UVT.
  • Page 25: 11 Rs-232 Data Logging

    UviTec UV254 Analyzer – M3000 v 2.1 11 RS-232 Data Logging The UviTec UV254 M3000 has the capability to data log various performance variables on a local computer via an RS-232 interface. The data log frequency as well as the specific data to be logged is configurable.
  • Page 26: Table 6: Data Logging - Ascii String Description For Analyzer With Dual Feed

    UviTec UV254 Analyzer – M3000 v 2.1 If your system has a Dual Feed accessory (and optional turbidity compensation is still in effect), the ASCII string would be slightly different. UVT is replaced by UVT 1 and 2, which correspond to Stream 1 and 2, and % Removal.
  • Page 27: 12 Slope Correlation Method

    UviTec UV254 Analyzer – M3000 v 2.1 12 Slope Correlation Method The following method can be used to correlate the UV254 data to the parameter of choice such as TOC, COD, etc. Note that for many applications the absorbance reading of the M3000 can correlate very well with standard water quality parameters.
  • Page 28: 13 Dehumidifier For Humidity Control

    UviTec UV254 Analyzer – M3000 v 2.1 13 Dehumidifier for Humidity Control The UviTec UV254 M3000 includes a dehumidifier to control the humidity inside the monitor. Standing upright in a holder at the bottom left corner of the monitor as pictured in Figure 13.1, the dehumidifier maintains low...
  • Page 29: 14 Maintenance

    Table 7: Maintenance tasks and frequency FREQUENCY TASK Weekly Visual inspection (display faults, etc.) Validate M3000 reading with a UviTec UV254 P200 Meter grab sample or equivalent. Recalibrate if Monthly necessary. 12-18 Months Replace UV Lamp and Ribbon Cable 14.1...
  • Page 30: Cleaning Fluid

    Removes oil and grease 14.2 Cleaning Quartz Flow Cell The optimal cleaning method for the UviTec UV254 M3000 is an automatic scheduled clean with the UviTec Clean System I. Without the UviTec Clean System I, the process is similar to the calibration methods for the UviTec UV254 M3000.
  • Page 31: In-Situ Quartz Flow Cell Cleaning Method

    UviTec UV254 Analyzer – M3000 v 2.1 In-situ Quartz Flow Cell Cleaning Method 14.2.1 1. Shut off the water supply to the monitor if not already done. 2. Disconnect the ¼” supply tubing at inlet connection on the monitor. 3. Fill the supplied wash bottle with cleaning fluid and connect the ¼”...
  • Page 32: Manual Quartz Flow Cell Cleaning Method And Quartz Flow Cell Removal

    UviTec UV254 Analyzer – M3000 v 2.1 Manual Quartz Flow Cell Cleaning Method and Quartz Flow Cell Removal 14.2.2 1. Shut off the power to the monitor and close the water supply. 2. Place a container under the port connections to collect any water that may drain from the monitor.
  • Page 33: Replacing The Uv Lamp

    18 months or so for preventative maintenance. It is recommended that the blue-ribbon cable be replaced also at this time. Contact ABB Ltd or your supplier for a replacement lamp. To replace the UV lamp, follow these steps: 1.
  • Page 34: Figure 14.10: Replace Flow Cell And Lower Clamp

    UviTec UV254 Analyzer – M3000 v 2.1 10. Replace the rotating arm assembly back onto the motor shaft and tighten the set screw on the flat of the motor shaft. 11. Replace the blue-ribbon cable. 12. Replace the flow cell being careful the flow cell is properly aligned before lowering the toggle clamp, as shown in Figure 14.10.
  • Page 35: Ribbon Cable Replacement

    3. Close the wing clips to secure the new cable. Note: A spare cable is included with every new UviTec UV254 M3000 monitor and is attached to the inside of the cabinet door. To order more cables please contact ABB. ABB Ltd...
  • Page 36: 15 Dual Feed

    15.1.2 This allows the operator to specify how much time in minutes the UviTec UV254 M3000 should wait after switching between influent-effluent and effluent-influent before continuing UVT or UVA testing. During idle time the UVT or UVA value is held constant at the last good UVT or UVA value for the current water stream.
  • Page 37: Dual Feed Cleaning

    When used with the UviTec Clean automatic chemical cleaning system, the cleaning system must be connected on the Stream 1. The UviTec UV254 M3000 will make sure that the cleaning cycle will only be initiated during the Stream 1 testing phase of the dual feed cycle and will delay any scheduled Stream 1- Stream 2 switch until the cleaning cycle is completed.
  • Page 38: 16 Troubleshooting Guide

    May need to replace display board. Note: Each M Series unit built at the ABB factory is calibrated individually to the components and the finished construction of the unit. Information for the calibration of a unit is stored on the main circuit board. Therefore, swapping boards means the calibration for a given unit is no longer correct as it based on the precise relationships between the components.
  • Page 39: Alarms And Warnings

    In this case it may be possible to ignore or turn off the humidity alarm. The lamp may need to be replaced if the lamp use is close to or more than 12,000 hours/18 months. Contact ABB for Lamp output is too low to provide replacement.
  • Page 40: Secondary Data

    UviTec UV254 Analyzer – M3000 v 2.1 ALARM PROBLEM / CONDITION SOLUTION Internal temperature of the It may be necessary to relocate the analyzer to a cooler analyzer is approaching maximum Temperature location or if it is outside it could require shading from the recommended operating sun.
  • Page 41: Lamp Numbers

    UviTec UV254 Analyzer – M3000 v 2.1 Lamp Numbers 16.3.1 Lamp numbers are not affected by sample water absorbance as they are a direct reading of the lamp output. CONDITION VALUE ISSUE / ACTION Values fluctuate more than 20 points after monitor has warmed Fluctuating Problem with lamp or lamp sensor.
  • Page 42: 17 Parts And Accessories

    UviTec UV254 Analyzer – M3000 v 2.1 17 Parts and Accessories PART PRODUCT NAME DESCRIPTION PART NUMBER UV Lamp UV Lamp for online monitors UVT-060020 Dehumidifier Rechargeable dehumidifier for online monitors UVT-079110 Calibration Bottle 1L Calibration Bottle for M Series Analyzers...
  • Page 43: 18 Cabinet Dimensions And Clearance

    UviTec UV254 Analyzer – M3000 v 2.1 18 Cabinet Dimensions and Clearance The front, side, and back views of the cabinet are shown below to the nearest 1/8 inch. The back view gives the dimensions relevant for spacing of screws to mount the cabinet. Allow a clearance of 6 inches around the cabinet for unit connection.
  • Page 44 We reserve the right to make technical changes or modify the contents of this document without prior notice. With regard to purchase orders, the agreed particulars shall prevail. ABB does not accept any responsibility whatsoever for potential errors or possible lack of information in this document.

This manual is also suitable for:

Uvitec uv254 m3000

Table of Contents