Download Print this page
Daikin FWEDA Use & Installation Manual
Daikin FWEDA Use & Installation Manual

Daikin FWEDA Use & Installation Manual

Fcu control board

Advertisement

Quick Links

FWEDA – FCU CONTROL BOARD
Use & Installation quick guide
EN
www.daikinapplied.eu

Advertisement

loading
Need help?

Need help?

Do you have a question about the FWEDA and is the answer not in the manual?

Questions and answers

Summary of Contents for Daikin FWEDA

  • Page 1 FWEDA – FCU CONTROL BOARD Use & Installation quick guide www.daikinapplied.eu...
  • Page 2 Safety Information and General Warnings Improper installation, operation, or maintenance of this device may result in property damage, serious injury, or installation. Warnings Electrical Hazard result in electric shock, injury or death. licensed electrician or HVAC technician. Improper installation could damage the unit or connected systems. Wear protective equipment and use insulated tools to avoid electrical hazards.
  • Page 3: Content Of The Box

    Content of the box  Control Board  Fixing bracket  Screws: → for FWF-D/FWC-D/FWE-D/F FCU models → for FWV/FWZ/FWL/FWR/FWM/FWS/FWB/FWP/FWN/FWD/FWH/FWI FCU models  Quick guide Technical Data Supply voltage 230 Vac - 50/60 Hz Transport temperature -10°C / + 60°C 500 mA Max power consumption 60 mA...
  • Page 4 Analog Inputs Common Water sensor #1 (cold/heat water for 2 pipes, cold water for 4 pipes) Water sensor (hot water) #2 (4 Pipes) Supply temperature Room temperature Common Analog AO1/AO2 common Outputs Fan modulation (0-10V) Proportional water valve modulation (0-10V – 2 pipe) Proportional hot water valve modulation (0-10V –...
  • Page 5: Installation

    Dimensions Figure 1 – Power Control Board dimensions Installation Important: technician for installation. Read the Manual Before starting the installation, read all instructions carefully and make sure you have the necessary tools. Choose the Location diagrams of your model available in the Installation and Operation Manual. In general, always install the PCB on the opposite side of the water connection (heat exchanger).
  • Page 6 The system language The full brightness of the display The date and time otherwise it can be done in a guided way through the same user interface, following the instructions on the screen. Download the Daikin Shinka Manager Mobile App coil units).
  • Page 7 Touch/Sense models, multiple zones in case of Shinka Zone). Each Zone can consist of 1 or more fan coils (on which the FWEDA control board is already installed and wired). unit’s parameters (2/4 pipe, fan-motor type, presence of valves etc.).