All names, trademarks, product names and other designations used in this manual may be legally pro- tected even if not indicated as such (e.g. as a trademark). KOSTAL Solar Electric GmbH assumes no li- ability for their free usage. The illustrations and texts have been compiled with great care. However, the possibility of errors cannot be ruled out.
Page 5
External battery control via Modbus (TCP) ................257 14.3 External battery control via digital inputs ................259 Backup mode ........................261 15.1 Backup mode with the KOSTAL BackUp Switch ..............262 15.2 Backup mode with an automatic backup box..............264 15.3 Limitations in backup mode....................266 System monitoring ......................
Page 6
Accessories ........................296 20.1 Activating battery connection....................297 20.2 DC overvoltage protection ....................298 20.3 KOSTAL BackUp Switch – manual switch ................299 Warranty and service ......................301 Appendix..........................302 22.1 EU Declaration of Conformity....................303 22.2 Open Source licence ......................304 22.3...
List of events (error messages) that may occur in the inverter Further information ■ List of compatible partners: An overview of products from external partners that can be combined with products from KOSTAL Solar Electric GmbH to create optional up- grades. Regulations ■...
Additional components, replacement parts and accessories may only be used if they have been approved by KOSTAL Solar Electric GmbH for this product type. You can find all of the information about the product on our website in the Download area: www.kostal-solar-electric.com/download/...
QR code with the following information: Serial number, article number, hardware/software status, master key The QR code can be used to perform initial commissioning of the inverter via the KOSTAL Solar App. ■ Details of the activated power in the inverter.
Page 32
3. Device and system description Inverter with KOSTAL ENECTOR wallbox If the inverter and a KOSTAL ENECTOR wallbox are fitted in the system environment, a KOSTAL Smart Energy Meter (KSEM) must be used as the energy meter. The KSEM is a three-phase energy meter but is run on only one phase when combined with the PLENTICORE MP G3.
The following product upgrades are available and can be obtained in the KOSTAL Solar Webshop using PLENTICOIN: The product upgrades can then be activated using the KOSTAL Solar App, the inverter dis- play or the inverter Webserver by going to Additional options and entering the activation code.
The following product upgrades are available and can be obtained in the KOSTAL Solar Webshop using PLENTICOIN: The product upgrades can then be activated using the KOSTAL Solar App, the inverter dis- play or the inverter Webserver by going to Additional options and entering the activation code.
Page 43
■ Feeding surplus energy into the public grid INFO AC power sources can be, for example, KOSTAL inverters, other inverters, combined heat and power (CHP) units, small wind turbines or other energy sources in the house grid. To store this energy in a connected battery, the Storage of surplus AC energy from local generation function must be activated in the Webserver in Service menu >...
To do this, the battery activation code can be purchased from the online KOSTAL Solar shop. ■ You will find a list of approved KOSTAL Solar Electric battery storage systems on our website in the download area for the product. ■...
■ WLAN bridge If there are several KOSTAL inverters in a system, the inverter can be used as a WLAN bridge to the existing WLAN router. Additional inverters, energy meters or battery stor- age can be connected to this inverter using LAN cables to establish the connection to the local home network and the Internet.
Failure detection is automatically activated and the failure message is forwarded to the KOSTAL Solar Portal. ■ Simple and easy to replace if it fails You will find a list of approved KOSTAL Solar Electric accessories on our website in the download area for the product.
For this purpose, a manual or automatic backup box must be installed in the house grid at the grid connection point. As a manual variant, KOSTAL provides the KOSTAL BackUp Switch (three-phase) and the KOSTAL BackUp Switch MP (single-phase), which disconnects the public grid from the house grid in backup mode.
3. Device and system description 3.8.19 KOSTAL Solar Terminal The KOSTAL Solar Terminal is the central gateway for you as a user. You can find the KOSTAL Solar Terminal on our website or at this link: https://terminal.kostal-solar-electric.com. KOSTAL Solar Terminal The KOSTAL Solar Terminal is a central hub for various applications. To use them, you have to register once.
Data transfer to KOSTAL Solar Portal must be activated in the inverter. ■ The inverter must not be assigned to any other PV system in the KOSTAL Solar Portal. ■ The inverter must be assigned to your PV system in the KOSTAL Solar Portal.
Just enter the system details and individual customer details and receive a recommendation for a suitable KOSTAL solar inverter for the planned solar system. All KOSTAL solar invert- ers are considered for this. In addition, the customer's electricity consumption is considered and the potential self-consumption and self-sufficiency quotas are displayed using standard load profiles.
Page 61
To set up and use the app, you will need access to the KOSTAL Solar Terminal and the KOSTAL Solar Portal and to have an inverter set up there. To log in to the app, use the same login details as for the KOSTAL Solar Terminal.
Risk of death due to electrical shock and discharge! ■ De-energise device and secure against being switched on again. INFO Only energy meters which have been approved for the inverter by KOSTAL Solar Electric may be used. You will find an up-to-date list of approved energy meters in the download area for the product on our website.
(e.g. smart meter) better suited to you. If a ripple control receiver is already connected to another KOSTAL inverter in your house network, you can use the control signals of this ripple control receiver. In order to do this, receipt of broadcast control signals must be activated in the Webserver by going to Service menu >...
Switch) for three-phase grids and a single-phase variant (KOSTAL BackUp Switch MP) for single-phase grids. If the PLENTICORE MP G3 is run in a three-phase grid with the KOSTAL BackUp Switch (three-phase variant), ensure that the inverter and all key consumer devices are connec- ted on the same phase.
Page 95
BackUp Switch System overview The KOSTAL BackUp Switch is connected differently depending on the country and the en- ergy supplier. Ask your energy supplier which type of connection you require. Left: Neutral point setup required. Separation of the neutral conductor from the public grid with the KOSTAL BackUp Switch in backup mode.
Page 96
✔ The KOSTAL BackUp Switch signal cable is connected. Use of the KOSTAL BackUp Switch is selected when the inverter is initially installed, or it can be selected via the Webserver by going to Service menu – General > Operating mode >...
RJ45 connections. If the Ethernet cable is connected to a router, the inverter is integrated into the local net- work and can be contacted by all computers or KOSTAL inverters incorporated into the same network.
If you want to connect the inverter to the home network via WLAN, it is important to have a sufficiently strong signal quality at the installation site. The inverter can also be used as a WLAN bridge for other devices (e.g. KOSTAL Smart En- ergy Meter, battery storage unit).
Please note the following: ■ Battery use must be released in the inverter. ■ Only battery storage systems (manufacturers) which have been approved by KOSTAL Solar Electric GmbH may be connected to the inverter. INFO A list of approved battery storage systems...
U to ensure the optimal MPPmin MPPmax layout for the solar modules and the highest yield possible. KOSTAL Solar Plan should be used as a planning tool for this. ■ Check that the modules are planned and connected correctly.
7. Initial commissioning 7. Initial commissioning 7.1 Initial commissioning ....................... 123 7.1.1 Initial commissioning via KOSTAL Solar App and the setup wizard....125 7.1.2 Initial commissioning via web browser.............. 131 7.1.3 Initial commissioning via display ............... 135 7.2 Configuring settings in the Webserver ................138 7.3 Handover to the operator....................
7. Initial commissioning 7.1 Initial commissioning The KOSTAL Solar App, the Webserver or the inverter’s display can be used for initial commissioning. The required activation codes are requested during initial commissioning. Activation codes should be purchased before commissioning from wholesalers, our KOSTAL Solar Webshop or directly from the KOSTAL Solar App.
Page 124
Initial commissioning via KOSTAL Solar App and setup wizard A smartphone is required to input the data. Initial commissioning is performed via the setup wizard in the KOSTAL Solar App. The application is only available to installers. For this purpose, Pro mode must be activated in the KOSTAL Solar App.
7. Initial commissioning 7.1.1 Initial commissioning via KOSTAL Solar App and the setup wizard To carry out the installation via the KOSTAL Solar App and the setup wizard, the following preconditions must be met. ■ The KOSTAL Solar App must be installed on the smartphone.
Page 126
7. Initial commissioning If you have not yet logged in to the KOSTAL Solar Terminal, you will be automatically prompted to log in. When you log in, your data will be automatically stored in the KOSTAL Solar App, including the service code, if you have been set up as a fitter.
Page 127
➔ The inverter serial number is displayed. Click on Next. If you haven't yet logged into the KOSTAL Solar Terminal, enter your access details to do so. ➔ The product upgrades available for your inverter are then displayed for you.
Page 128
The smartphone is now connected to the inverter WLAN access point. Now scan the QR code from the inverter type plate and press Next. Press Next. If your installer service code cannot be automatically called up via the KOSTAL Solar Terminal, enter it here and press Next. ✔...
Page 129
Under operating mode, select which components should be taken into consideration during the initial setup (PV generators, installed energy meter, connected battery, a KOSTAL BackUp Switch or an automatic backup box). The following items are then taken into consideration during the initial installation.
Page 133
Under operating mode, select which components should be taken into consideration during the initial setup (PV generators, installed energy meter, connected battery, a KOSTAL BackUp Switch or an automatic backup box). The following items are then taken into consideration during the initial installation.
Under operating mode, select which components should be taken into consideration during the initial setup (PV generators, installed energy meter, connected battery, a KOSTAL BackUp Switch or an automatic backup box). Select the items using the arrow keys and confirm with ENTER.
Page 136
The extra options currently released are shown under Released options. Select Release option and confirm with ENTER. Enter the code you previously purchased from the KOSTAL Solar Webshop. At the end, confirm the input with √. Press the right arrow key to go to the next installation item.
Get the installer to configure inverter settings. ■ Get the energy supply company to configure the mandatory settings for grid feed-in. ■ Log in to the KOSTAL Solar Portal, if not already done. ■ Allocate a password for the plant owner. ■...
Overview of options currently released in the inverter INFO The activation code can be purchased from the KOSTAL Solar Webshop. You can access the shop via the KOSTAL Solar Terminal or by using this link: shop.kostal-solar-electric.com Service menu The installer or an experienced user can use the inverter's service menu to implement set- tings on the inverter.
Page 174
INFO In a device network comprising multiple KOSTAL inverters, the data is merged in the portal. Correct and complete visualisation takes place exclusively in the KOSTAL Solar Portal and in the KOSTAL Solar App and not in the individual inverter.
Page 182
In that case, a LAN connection no longer needs to be set up. If there are several KOSTAL inverters in a system, the inverter can be used as a WLAN bridge to the existing WLAN router. Additional inverters, energy meters or battery storage can be connected to this inverter using LAN cables to establish the connection to the local home network and the Internet.
Page 185
Little-endian and big-endian can be chosen for the byte or- der. NOTE! KOSTAL devices and most partner applications use the default setting "little-endian". In some cases it may be necessary to change the byte order to "big-en- dian".
Page 190
Indicates when the inverter last successfully transferred data to the solar portal (provided the function is active). Activate log data export If Use portal has been activated and the KOSTAL Solar with FTP push Portal has been selected, the log data can be transferred to an external FTP server and saved.
The settings in this menu can only be configured after logging in as the installer. INFO You will find a list of approved energy meters and their purpose in the download area for the product on our website at https://www.kostal-solar-electric.com. Parameter Explanation Energy meter Selection of connected energy meter.
Page 201
Not activated: No backup function has been selected. Manual changeover: A manual KOSTAL BackUp Switch has been fitted in the house installation which can be used for the backup func- tion if there is a power failure. Automatic changeover:...
Page 213
Explanation Release new extra option Enter an activation code, e.g. to connect a battery. NOTE! The activation code can be purchased from the online KOSTAL Solar shop. The following link will take you to the shop: shop.kostal-solar-electric.com Released options Overview of options currently released in the inverter...
Page 214
9. User interface and menus You will find a list of approved KOSTAL Solar Electric accessories on our website in the download area for the product. Device restart Run restart can be used to restart the inverter. A confirmation prompt appears asking you if you really want to restart the device.
To set up and use the app, you will need access to the KOSTAL Solar Terminal and the KOSTAL Solar Portal and to have an inverter set up there. To log in to the app, use the same login details as for the KOSTAL Solar Terminal.
Data transfer to KOSTAL Solar Portal must be activated in the inverter. ■ The inverter must not be assigned to any other PV system in the KOSTAL Solar Portal. ■ The inverter must be assigned to your PV system in the KOSTAL Solar Portal.
WLAN access point for communication with a computer Inverter as a WLAN bridge If there are several KOSTAL inverters in a system, the master inverter can be used as a WLAN bridge to the existing WLAN router in the local network. Other available slave devices are connected to the master inverter via LAN cable.
Active power control is enabled. 13.3.2 Activate receipt of control signals for active power control If a ripple control receiver is already connected to another KOSTAL solar inverter in your house network, you can use the control signals of this ripple control receiver.
Page 262
15.1 Backup mode with the KOSTAL BackUp Switch The KOSTAL BackUp Switch is a manual switch from KOSTAL. The steps described here relate specifically to this type. If another backup box has been fitted, consult the manufacturer's instructions to find out how it is operated.
Page 263
Procedure using the KOSTAL Backup Switch when the grid returns The KOSTAL Smart Energy Meter measures the grid parameters for the public grid at the grid connection point. As soon as the grid is available again, the KOSTAL Smart Energy Meter forwards this information to the inverter.
Page 265
Procedure using an automatic backup box when the grid returns The KOSTAL Smart Energy Meter measures the grid parameters for the public grid at the grid connection point. As soon as the grid is available again, the KOSTAL Smart Energy Meter forwards this information to the inverter.
Page 271
It may take as much as 20 minutes following activation (dependent upon the portal) until the data export is visible on the solar portal KOSTAL Solar Portal. The KOSTAL Solar Portal is preset as the standard solar portal. On the inverter control panel, select the Settings/Information menu.
Page 272
Webserver or the inverter menu. INFO If there are multiple inverters in a system, data transfer to the KOSTAL Solar Portal must be set up separately for each inverter and, if necessary, for the KOSTAL Smart Energy Meter.
19. Technical information 19.1 Technical data Subject to technical changes. Errors excepted. You can find current information at www.kostal-solar-electric.com. Power class PLENTICORE MP G3 Unit Inverter name PLENTICORE MP S G3 PLENTICORE MP M G3 Power class Basic power Optional power extension level 1 Optional power extension level 2 Basic power / optional power upgrade level: Power in the power level depends on country of use.
19. Technical information PLENTICORE MP G3 Unit Start time with manual KOSTAL BackUp <5 Switch Start time with automatic backup box <30 Operating hours in backup mode 5000 Efficiency PLENTICORE MP G3 Unit Max. efficiency 97.7 98.0 European efficiency 96.5 96.6 96.7...
Page 293
Warranty (Smart Warranty): Activate your free warranty (Smart Warranty) now in the KOSTAL Solar online shop (shop.kostal- solar-electric.com). For the Smart Warranty Plus, you must also register your device in our KOSTAL Solar Portal. This does not affect your statutory warranty. You will find more information about the service and warranty conditions in the download area for your product.
For the inverter, it is possible to release the third PV input (DC3) as a connection for battery storage. To do this, you can purchase a battery activation code from our KOSTAL Solar Webshop and enter this in the inverter. You can then use the third PV input to connect a battery.
Page 298
Failure detection is automatically activated and the failure message is forwarded to the KOSTAL Solar Portal. ■ Simple and easy to replace if it fails You will find a list of approved KOSTAL Solar Electric accessories on our website in the download area for the product.
Page 299
Switch) for three-phase grids and a single-phase variant (KOSTAL BackUp Switch MP) for single-phase grids. If the PLENTICORE MP G3 is run in a three-phase grid with the KOSTAL BackUp Switch (three-phase variant), ensure that the inverter and all key consumer devices are connec- ted on the same phase.
22. Appendix 22.1 EU Declaration of Conformity KOSTAL Solar Electric GmbH hereby declares that the devices described in this document complies with the basic requirements and other relevant conditions of the directives listed below. ■ Directive 2014/53/EU (RED Radio Equipment and Telecommunications Terminal Equipment) Provision of radio equipment ■...
Need help?
Do you have a question about the SOLAR ELECTRIC PLENTICORE MP G3 and is the answer not in the manual?
Questions and answers