Site Preparation and Maintenance Records
•
•
•
Site Preparation Checklist
Planning the location and layout of your equipment rack or cabinet is essential for successful switch operation,
ventilation, and accessibility.
The table lists the site planning tasks. We recommend that you complete the tasks before you install the switch.
Your completion of each task ensures a successful switch installation.
Planning Activity
Space evaluation:
Space and layout
Floor covering
Impact and vibration
Lighting
Physical access
Maintenance access
Environmental evaluation:
Ambient temperature
Humidity
Altitude
Atmospheric contamination
Airflow
Site Preparation Checklist, on page 73
Contact and Site Information, on page 74
Chassis and Module Information, on page 75
Verification Time and Date
A P P E N D I X
Cisco Nexus 9336C-FX2 ACI-Mode Switch Hardware Installation Guide
E
73