Page 1
This is a safety procedure recommended for all electrical appliances. The shower head and hose supplied with this product are safety critical parts of your shower. Failure to use genuine Triton parts may cause injury and invalidate your guarantee.
IMPORTANT SAFETY INFORMATION Products manufactured by Triton are safe and without risk, provided they are installed, used and maintained in good working order in accordance with our instructions and recommendations. WARNING: DO NOT operate the shower if there is a possibility of frozen water within the heater or pipes feeding the shower.
Page 3
IMPORTANT SAFETY INFORMATION GENERAL ▪ Isolate the electrical and water supplies before removing the cover. ▪ Read all of these instructions and retain them for later use. ▪ DO NOT take risks with plumbing or electrical equipment. ▪ Isolate electrical and water supplies before proceeding with the installation. ▪...
INTRODUCTION Please read this book thoroughly and familiarise yourself with all instructions before commencing installation. Please keep it for future reference. The shower installation MUST be carried out by a suitably qualified person, in the sequence of these instructions. ADVICE TO USERS IMPORTANT: When first installed, the shower unit will be empty of water.
KM 52019 WEEE Directive – Policy Statement As a producer and a supplier of electric showers, Triton Showers is committed to the protection of the environment via our own environmental policy and the compliance with the WEEE directive. Triton Showers is fully registered with the Environment Agency under the following schemes:...
INSTALLATION REQUIREMENTS PLUMBING REQUIREMENTS Please read IMPORTANT SAFETY INFORMATION and SPECIFICATION sections before undertaking the plumbing installation. NOTE: If the recommended dynamic pressure and flow is not available, there could be a noticeable reduction in performance from the shower head. If it is intended to operate the shower at pressures above the maximum or below the minimum stated, contact Customer Experience for advice.
INSTALLATION REQUIREMENTS WARNING The Shower unit MUST NOT be positioned where it will be subjected to freezing Fig.1 Diagrammatic view (not to scale) conditions. Isolating 230-240V ac electricity supply Mains cold Valve (via double pole switch) Water supply Double pole isolating switch Switch may...
Contact a professional electrician/local electricity company for advisement. 8. For close circuit protection DO NOT use a rewireable fuse. Instead use a suitably rated Miniature Circuit Breaker (MCB) or cartridge fuse. Triton recommend the following circuit protection: 8.5KW variant - 40Amp 9.5kW variant - 40/45Amp 9.
Page 12
INSTALLATION REQUIREMENTS 10. A 45 amp double pole isolating switch with a minimum contact gap of 3mm in both poles must be incorporated in the circuit. It must have a mechanical indicator showing when the switch is in the OFF position, and the wiring must be connected to the switch without the use of a plug or socket outlet.
INSTALLATION POSITIONING THE SHOWER For ease of servicing, the unit must always be mounted on the surface of tiled walls. Never tile up to the unit. Position the unit where it will not be in direct contact with water from the shower head. Mount the shower unit vertically.
Page 14
INSTALLATION Determine the Plumbing and Electrical routing into the shower unit. Step Step Rotate the Inlet Fitting to suit the required water supply pipe entry position. Bottom Entry Rear Entry Top Entry Step Step Complete all the plumbing pipe work. Ensure that any soldering of pipe work is done away from the shower as heat can travel along pipe work and damage components.
Page 15
INSTALLATION Step Step Temporarily connect the shower to plumbing pipe work. Ensure that the unit is level and mark the fixing holes. Use the hole at the top and the 2 holes at the bottom. Remove the shower from the wall. Drill the fixing holes.
Page 16
INSTALLATION Step Step Earth cable (Green/Yellow) to Route the electrical supply cable into the shower unit. Neutral cable (Blue or Black) to Live cable (Brown or Red) to NOTE: The supply cable must be secured either by routing through conduit, trunking or by Terminal block embedding in the wall, in accordance with IEE regulations.
INSTALLATION Step Step SHOWER SETTINGS The ENlight shower has some functionality settings that can be customised to ® individual user’s preference. A DIP switch mounted on the Control PCB allows these settings to be adjusted. Factory Settings ECO Run Time This function provides the adjustment in the length of time the shower runs when ECO mode is activated, before it automatically enters phased shutdown.
INSTALLATION Step Step COMMISSIONING Attach the appropriate end of the Shower Hose to the shower outlet, using the supplied hose washer seal. DO NOT overtighten. Position the other end of the Shower Hose to the bath or tray waste. DO NOT fit the shower head. Step Step During the commissioning process, the...
Page 19
INSTALLATION Turn on the water supply to the shower at the isolating stop valve. Step Step Switch on the electricity supply to the shower at the isolating switch. Water will start to flow from the shower hose. Allow water to flow for approximately 60 seconds, this will allow the air to bleed from the installation.
MAINTENANCE Instructions for Installers and Service Engineers Only Inlet Filter Maintenance It is recommended that the filter is periodically cleaned in order to maintain the performance of the shower. It is essential that this operation is carried out by a competent person. Switch off the electricity and water supply at the mains.
FAULT DIAGNOSTICS IMPORTANT: Isolate the electricity supply and remove the circuit fuse before attempting any fault finding inside the unit. Problem Cause Action Blown fuse or circuit breaker. Check supply. Renew or reset fuse or circuit breaker. If it fails Interrupted power again, consult a qualified electrician.
Page 22
When fitting a new PRD, follow the Commissioning procedure. It is advised all electrical maintenance/repairs to the shower should be carried out by a suitably qualified person. In the unlikely event of a fault occurring please contact Triton Customer Experience. DO NOT remove the shower from the installation.
Page 23
To purchase a genuine Triton spare part for your product, please visit www.tritonshowers.co.uk/spares for product codes and prices. Alternatively please call our Customer Experience team on 024 7637 2222 to order direct. Please have your model name available.
Need help?
Do you have a question about the ENlight 9.5kW and is the answer not in the manual?
Questions and answers