About This Manual Change History The manual primarily encompasses product information, along with installation, operation, Changes between document issues are cumulative, meaning that each subsequent document and maintenance guidelines. issue includes all the changes made in earlier issues. It will refer to the device as the "ESS" unless otherwise specified. V1.0 2024-05-11 Target Group...
User Manual User Manual flyfine flyfine 1 Safety Instructions 1.2 Installation Safety Before using please read all instructions and cautionary markings on the unit and this manual. DANGER Store the manual where it can be accessed easily. Before installation, ensure that there is no electrical connection present.
User Manual User Manual flyfine flyfine WARNING CAUTION Damage to the product resulting from incorrect wiring is not covered by the warranty. To prevent misuse or accidents caused by unauthorized personnel, prominently display Electrical connections should be performed by professionals.
User Manual User Manual flyfine flyfine 2 Product Description NOTICE In a TT utility grid, ensure that the N line voltage to ground is 30V or below. 2.1 System Introduction For off-grid applications, the utility grid must be a TN system.
User Manual User Manual flyfine flyfine 2.2.3 Dimensions FHAB17280 The following table shows the dimensions of the ESS Model FHAB8640 1355 FHAB17280 1878 FHAB8640 (Unit:mm) (Unit:mm)
User Manual User Manual flyfine flyfine 2.2.4 Function interface description Description Silk screen Remark 2.3 SymbolsontheProduct Symbol Explanation Parameters on the PV side. Parameters on the Battery side. AC-Grid Parameters on the ACon-grid side. AC-EPS Parameters on the ACEPS side.
User Manual User Manual flyfine flyfine 2.4 HybridInverter Danger to life due to high voltages! 2.4.1 Inverter Comm. Interface Do not touch live parts for 10 minutes after If there is any change in the pin position of the communication line, the customer shall be notified disconnection from the power sources.
User Manual User Manual flyfine flyfine 2.5.2 The LED panel is on the front of the inverter. The following chart description of the LED LED indicator State Description EPS load off Steady on EPS load on Frequency: 500ms Fast flashing...
Scenario 1: PV power generation > Load power consumption: All in one ESS FHAB8640 / FHAB17280 - First,PV power is prioritized for the EPS loads first, followed by normal loads and then the battery. Metering device Inside the battery inverter, it is visible when the cover is opened - If the battery is fully charged, any excess power will be fed back to the grid.
User Manual User Manual flyfine flyfine 3.2.1 Power Derating By combining the discharge capability of the battery and the EPS power from the grid, the system ensures reliable and continuous power supply during nighttime operations. Power derating is implemented as a protective measure to safeguard the ESS against potential overload or faults.
User Manual User Manual flyfine flyfine 3.3 Communication and Configuration 3.4.1 Charge Management The ESS offers RS485, Ethernet, WLAN, and CAN ports for device and system monitoring. These ports EPS Charge Management allow configuration of parameters for optimal operation. ESS information is accessible through the SOLARMAN Smart App.
Quantity Iterm Name When unpacking the product, exercise caution to avoid causing any damage, especially if using tools. (FHAB8640) (FHAB17280) Take care to handle the product with care and ensure that no unintentional harm is inflicted upon it. Hybrid Inverter...
User Manual User Manual flyfine flyfine 5 Mechanical Mounting 4.3 Product Storage To ensure the proper storage of the ESS Product when it is not immediately installed, please adhere to the following guidelines: WARNING Store the ESS Product in its original packing case, ensuring the desiccant is kept inside.
User Manual User Manual flyfine flyfine 5.3 Installation Tools 5.2.1 Environment Requirements Ensure an installation environment free from flammable or explosive materials. Installation tools include but are not limited to the following recommended ones. If necessary, use Choose a location that is not accessible to children to ensure their safety.
User Manual User Manual flyfine flyfine 5.5 Installing the ESS Step 4: Mark with a pen, use a hand drill to drill holes, and install M6 expansion screws. Note: This ESS should be installed battery modules first on the bottom and then inverter module on the top.
Page 18
User Manual User Manual flyfine flyfine Step 7: Use 4 M4 screws to install the top wall mount bracket and mark it. Remove or protect the Step 8: Clean up the dust and secure the upper battery pack with expansion screws and nuts upper battery pack.
User Manual User Manual flyfine flyfine 5.6 Battery parallel operation Step 10: Connecting the positive and negative poles and communication between the battery and inverter. The P+link between the main battery pack Parallel+and the parallel battery pack. Main battery pack Parallel - p-link to parallel battery pack.
User Manual User Manual flyfine flyfine 6 Electrical Connection 6.2 The battery module connects to the inverter 6.2.1 Terminal Description 6.1 Safety Instructions All electrical terminals are located on the side of the inverter. DANGER The PV string produces extremely high voltage when exposed to sunlight, which can be lethal.
User Manual User Manual flyfine flyfine 6.2.2 Connecting the AC Cable step 3: Follow Step 1\2\3 to tighten the GRID\EPS terminal nut back, And press al1 wires onto the tubular terminals. GRID step 4: Connect L1\L2\L3\N\PE to the corresponding position of the GRID\EPS terminal and tighten it with the corresponding tool.
User Manual User Manual flyfine flyfine 6.3 DC Cable Connection For 10kW-3P, each pair of PV terminals is corresponding to an independent PV string. PV input PV1 connect to MPPTl and PV2, PV3 connect to MPPT2. For the best use of PV power, PV2 and PV3 should be the same in PV string structure, including the type, number, tilt, and orientation of the PV modules.
User Manual User Manual flyfine flyfine 6.3.2 Assembling the PV Connectors step 4: Check for polarity correctness. NOTICE DANGER If the PV polarity is reversed, the inverter will be in a fault or alarm state and will not High voltage may be present in the inverter! operate normally.
User Manual User Manual flyfine flyfine 7 Commissioning 6.4 WLAN-RS485 Connection The WLAN-RS485 module can upload the running information of the inverter to the corresponding 7.1 Inspection before Commissioning APP, so that users can check the running status of the inverter at any time. The following figure shows the connection mode.
User Manual User Manual flyfine flyfine 7.6 Add a Logger 7.4 Registration Go to SOLARMAN Smart and sign up. step 1: Manually enter the serial number of the logger. Click on "Sign up" and create your account here. Please note that use an email address to step 2: Click on the icon located on the right side and scan the barcode to enter the logger serial register for an account.
User Manual User Manual flyfine flyfine 7.8 Stick Logger Installation Assemble the logger to the ESS communication interface according to the diagram provided. step 2: Please wait for a few minutes. Afterward, click on "Done" to complete the setup and view the plant data.
User Manual User Manual flyfine flyfine 8 System Decommissioning 7.10 Abnormal State Processing If you encounter abnormal data on the platform while the stick logger is running, please refer to 8.1 Disconnecting the ESS the following table and use the status of the indicator lights to perform basic troubleshooting. If the issue persists or if the indicator lights' status is not listed in the table, please contact Customer 8.1.1 Disconnecting the ESS...
Certain components of the ESS may pose a risk of environmental pollution. Please adhere to the disposal regulations for electronic waste that are applicable at your installation site when disposing of these components. MODEL FHAB8640 FHAB17280 PV Specifications Max. PV input power 8.2 Decommissioning the Battery...
User Manual User Manual flyfine flyfine 10 Troubleshooting and Maintenance 10.1 Troubleshooting Note: Please consult the inverter user manual for information regarding the fault codes of the inverter. The manual will provide detailed explanations of the fault codes and their corresponding troubleshooting steps.
User Manual User Manual flyfine flyfine 10.2 Maintenance Wait for the inverter to recover normal operation. If the fault repeatedly occurs: 10.2.1 Maintenance Notices 1. Check if the ISO resistance protection value is set too high and ensure The DC switch can be locked in the OFF position or a position beyond OFF to ensure safety compliance with local regulations, with approval from the local power applicable to "AU"...