Download Print this page
Alienware AW2723DFB Service Manual
Alienware AW2723DFB Service Manual

Alienware AW2723DFB Service Manual

Hide thumbs Also See for AW2723DFB:

Advertisement

Quick Links

Service Manual–AW2723DFB
Version: 01
Date:2022/07/05
- 1 -

Advertisement

loading
Need help?

Need help?

Do you have a question about the AW2723DFB and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Alienware AW2723DFB

  • Page 1 Service Manual–AW2723DFB Version: 01 Date:2022/07/05 - 1 -...
  • Page 2: Table Of Contents

    Content Index 1. General Safety Instructions ..................3 1.1 SAFETY: General Safety ..................3 1.2 SAFETY: General Power Safety ................5 2. Exploded view diagram with list of items ..............6 3. Wiring connectivity diagram ..................8 4. How to connect and disconnect power cable/ connectivity cable......9 5.
  • Page 3: General Safety Instructions

    1. General Safety Instructions Use the following safety guidelines to help ensure your own personal safety and to help protect your equipment and working environment from potential damage. NOTE: In this section, equipment refers to monitors. IMPORTANT NOTICE FOR USE IN HEALTHCARE ENVIRONMENTS: Dell products are not medical devices and are not listed under UL or IEC 60601 (or equivalent).
  • Page 4 When operating your equipment:  Do not use your equipment in a wet environment, for example, near a bath tub, sink, or swimming pool or in a wet basement.  Do not use AC powered equipment during an electrical storm. Battery powered devices may be used if all cables have been disconnected.
  • Page 5: Safety: General Power Safety

    1.2 SAFETY: General Power Safety Observe the following guidelines when connecting your equipment to a power source: Check the voltage rating before you connect the equipment to an electrical outlet to ensure  that the required voltage and frequency match the available power source. Do not plug the equipment power cables into an electrical outlet if the power cable is ...
  • Page 6: Exploded View Diagram With List Of Items

    2. Exploded view diagram with list of items - 6 -...
  • Page 7 Item Description Q'ty Remark Panel ASSY MF KEY PWR PCBA LENS BD MYLAR PWR KEY HOLDER L PLASTIC PCBA CTRL+KEY BD PCBA USB BD ASSY RC ASSY LIGHTING MYLAR LENS27 PCBA TRANSFER BD MYLAR LOGO ASSY SHD WIRE AC+3/3P For EMEA PCBA I/F BD Only, not for PCBA SPS BD...
  • Page 8: Wiring Connectivity Diagram

    3. Wiring connectivity diagram Wire3 Wire 1 Wire 2 FFC 2 FFC 1 FFC 3 FFC 4 FFC 5 - 8 -...
  • Page 9: How To Connect And Disconnect Power Cable/ Connectivity Cable

    4. How to connect and disconnect power cable/ connectivity cable WARNING: To change power cable/ connectivity cable, switch off power before unplugging the cable and replugging in required cable. Connect/ disconnecting the mDP cable, DP cable, HDMI cable, USB cable and Power cable HDMI HDMI Display...
  • Page 10: Disassembly And Assembly Procedures

    5. Disassembly and Assembly Procedures NOTE: This “Disassembly and Assembly Procedures” is for EMEA only, not for other regions. Please note that Dell will deem warranty void if any disassembly is done on the monitors. 5.1 Disassembly SOP Preparation before disassembly 1.
  • Page 11 Item Picture Operation Tool Notes Lift the stand assembly up and away from the monitor. 1. Unlock 4 screws on Philips-head Rear Cover screwdriver (Screw 2. Use hands or scraper Torque: bar to disassemble 8-10 Kgf ) “Rear Cover” from monitor Scraper bar Notice the disassembly...
  • Page 12 Item Picture Operation Tool Notes 1. Unplug “USB BD to I/F BD FFC” from “I/F USB BD to I/F BD FFC BD” USB Hub BD to USB BD FFC 2. Unplug “USB Hub BD to USB BD FFC” from “USB BD” 1.
  • Page 13 Item Picture Operation Tool Notes 1. Disassemble “MYLAR Philips-head Do not touch PWR-BD” from Main screwdriver component without (Screw wearing 2. Tear off all tapes from Torque: insulating “FFC EDP” on I/F BD 8.5±1 Kgf) gloves when disassembli assembling 3. Unlock 12 PCBA Power BD screws 4.
  • Page 14: Assembly Sop

    5.2 Assembly SOP Preparation before assembly 1. Clean the room for work 2. Identify the area for material 3. Prepare the implement, equipment, materials as bellow: 1) Working table 2) Philips-head screwdriver 3) Gloves 4) Cleaning cloth 5) ESD protection Item Picture Operation...
  • Page 15 Item Picture Operation Tool Notes 6. Insert “USB Hub BD Philips- to USB BD FFC” to head USB Hub BD screwdriver (Screw Torque: 8.5±1 Kgf) 7. Insert “USB Hub BD to I/F BD wire” to USB Hub BD 8. Assemble USB Hub BD to Main SHD 9.
  • Page 16 Item Picture Operation Tool Notes 1. Insert “FFC EDP 60P/60P” to panel 2. Paste an acetate tape and a yellow tape to fix “FFC EDP 60P/60P” on panel 3. Position Main SHD on positioning post of Middle Frame, then, place Main SHD on Panel 1.
  • Page 17 Item Picture Operation Tool Notes 1. Inset “USB Hub BD to USB BD FFC” to USB BD to I/F BD FFC “USB BD” USB Hub BD to USB BD FFC 2. Insert “USB BD to I/F BD FFC” to “I/F BD” 1.
  • Page 18 Item Picture Operation Tool Notes To assemble stand: 1. Align and place the stand riser on the stand base. 2. Open the screw handle at the bottom of the stand base and turn it clockwise to secure the stand assembly. Close the screw handle.
  • Page 19: Trouble Shooting Instructions

    6. Trouble shooting instructions - 19 -...
  • Page 20 - 20 -...
  • Page 21 - 21 -...
  • Page 22 - 22 -...
  • Page 23 - 23 -...
  • Page 24 - 24 -...