Boundaryline ColourPanel Install Guide Introduction Thank you for choosing Boundaryline ColourPanel The recommendations detailed in this guide Fencing. This product will provide you with many are formulated along the lines of good building years of trouble free protection if installed in practice.
Boundaryline ColourPanel Install Guide Post Installation Step 1 | Mark out your post holes All holes should be straight (i.e. Sides parallel or wider at Start post the bottom than the may be Marker pegs existing or temporary Diameter of all holes is 200mm minimum.
Page 4
Boundaryline ColourPanel Install Guide Step 2 | Securing Posts a. Fastening posts together b. Fixing post in ground Align vertically with 2 Fasteners approx. spirit level in both 100mm max from Approx. directions top of post (below 40mm depth or rail)
Page 5
Boundaryline ColourPanel Install Guide Step 3 | Installing infill sheets – Insert bottom rail between posts to determine exact location of next post. – Adjust bottom rail to correct height - it is important to maintain Bottom rail a minimum gap of 50mm between bottom of rail and ground.
Page 6
“as new” look for longer. ColourPanel Fencing is designed to withstand most wind conditions. The wind on the fence at your site will depend on a number of factors, including the number of surrounding properties and how exposed the location is.