Boundaryline SmartWall Install Guide Introduction Thank you for choosing Boundaryline SmartWall The recommendations detailed in this guide Fencing. This product will provide you with many are formulated along the lines of good building years of trouble free protection if installed in practice.
Boundaryline SmartWall Install Guide Post Installation Step 1 | Mark out your post holes All holes should be straight (i.e. Sides parallel or wider at Start post the bo om than the may be top) Marker pegs existing or temporary Diameter of all holes is 200mm minimum.
Page 4
Screw fix the bo om rail at this stage. NOTE Bo om rail SmartWall Vertical fence system is supplied with a Rail Support and this between is to be inserted inside the bo om rail prior to it being installed.
Page 5
A common timber fence with individual palings will react by warping and twisting, and the overall appearance of will continually look worse as it degrades over time. However, the SmartWall paling is ‘laminated’ (several pieces glued together) which provides structural integrity and will ensures your fence remains straight and strong for many years.
Boundaryline SmartWall Install Guide Maintenance and Warranty of your fence To keep your fence looking its best, a so broom down every DO NOT use touch up paint. Minor scratches should be le few months should be su cient to remove any cobwebs.
Page 7
Technical Drawings Smartwall Horizontal SmartWall Fencing is designed to withstand most wind conditions. The wind on the fence at your site will depend on a number of factors, including the number of surrounding properties and how exposed the location is.
Need help?
Do you have a question about the SMARTWALL and is the answer not in the manual?