Download Print this page

Power smart HB5046C Instruction Manual page 17

4800w inverter generator

Advertisement

AC application
1. Start the engine, make sure the AC output light (green) is on.
2. Turn off the power supply switch and plug the device into the generator's output socket.
NOTE: In order to obtain the best operation effect and the maximum service life of the generator, the new
generator should run for at least 20 hours under 50% load, so that the engine performance can be optimized.
Stop The Generator
WARNING:Never stop the engine with electrical devices connected and with the connected devices in
"ON" position.
1. Switch off the connected electrical appliances, and remove the connectors of all electric equipment from
the generator panel.
2. Make sure the ECO switch is in "OFF" position.
Rotate the Fuel Tap to place the start button on "OFF" position.
3.
NOTICE: To stop the engine in an emergency, turn the Engine Switch to the "OFF" position.
17

Advertisement

loading
Need help?

Need help?

Do you have a question about the HB5046C and is the answer not in the manual?