FAR 27.401 or DFAR could result in personal injury or death. 227.7103-5 (c), as applicable in any Do not proceed beyond a WARNING technical data. notice until the indicated conditions are fully understood and met. Keysight TS-8989 Site Preparation & Installation Guide...
To completely disconnect the unit from terminal at earth potential. the AC mains, either disconnect the power cord, or have a qualified electrician install an external switch. Keysight TS-8989 Site Preparation & Installation Guide...
80% relative humidity (non-condensing) Maximum Altitude 2000 m Table 0-1 General environmental requirements This product is designed for use in Installation Category II and Pollution CAUTION Degree 2, per IEC 61010-1 and 664 respectively. Keysight TS-8989 Site Preparation & Installation Guide...
Industrial Scientific and Medical ISM -1A signifies compliance with the Group 1 Class A product (CISPER 11, Australian EMC Framework regulations Clause 4). under the terms of the Radio Communications Act of 1992. Keysight TS-8989 Site Preparation & Installation Guide...
“Monitoring and Control Instrument” product. The affixed product label is as shown below. Do not dispose in domestic household waste. To return this unwanted instrument, contact your nearest Keysight Service Center, or visit http://about.keysight.com/en/companyinfo/environment/takeback.shtml for more information. Keysight TS-8989 Site Preparation & Installation Guide...
Double- click the link to Test & Measurement. Select your country from the drop- down menus. The web page that appears next has contact information specific for your country. Keysight TS-8989 Site Preparation & Installation Guide...
Failure to comply with these precautions or with specific warnings elsewhere in this manual violates safety standards of design, manufacture, and intended use of the instrument. Keysight Technologies assumes no liability for the customer's failure to comply with these requirements.
ON. Figure 0-1 Examples of exposed connectors Do not use the DMM for measurement on mains circuits. The system is WARNING intended for measurement up to 60Vdc max working voltage. Keysight TS-8989 Site Preparation & Installation Guide...
Keysight website. You can search the DoC by its product model or description at the web address below. http://www.keysight.com/go/conformity If you are unable to search for the respective DoC, contact your local Keysight NOTE representative. Keysight TS-8989 Site Preparation & Installation Guide...
Plan to use an anti-static floor covering or mats. Plan for foot straps in conjunction with anti-static flooring and wrist straps for Grounding straps system operators. Table 0-2 Suggested anti-static solutions for site planning Keysight TS-8989 Site Preparation & Installation Guide...
Electrostatic Discharge (ESD) Precautions ..... .12 TS-8989 PXIe Functional Test System - U8989B Site Preparation and Power Requirements ..... .20 Preparing Your Site for the System .
Page 14
TS-8989 PXIe Functional Test Rack System - U8989BS Site Preparation and Power Requirements ..... . 66 Preparing Your Site for the System .
Keysight TS-8989 PXIe Functional Test System Site Preparation and Installation Guide TS-8989 PXIe Functional Test System - U8989B Site Preparation and Power Requirements Installation...
No operator-serviceable parts inside. Refer servicing to qualified personnel. WARNING To prevent electrical shock, do not remove instrument covers. The protection provided by the TS-8989 system may be impaired if the system is used in a manner not specified by Keysight. Keysight TS-8989 Site Preparation and Installation Guide...
TS-8989 PXIe Functional Test System - U8989B Typical test system configuration (Standalone) Figure 1-1, Figure 1-2, and Figure 1-3 shows a typical hardware configuration of the PXIe functional test system. Figure 1-1 TS-8989 PXIe Functional Test System (instrument interface view)
TS-8989 PXIe Functional Test System - U8989B Figure 1-2 TS-8989 PXIe Functional Test System (DUT interface view) Keysight TS-8989 Site Preparation and Installation Guide...
TS-8989 PXIe Functional Test System - U8989B Figure 1-3 TS-8989 PXIe Functional Test System (side view) Keysight TS-8989 Site Preparation and Installation Guide...
50 kg (600 lbs) Table 1-2 System mechanical specifications details System Dimensions The TS-8989 PXIe functional test system can be mounted in a 19- inch EIA rack cabinet. It fits in eight rack units (8U) of space. Figure 1-4, Figure 1-5...
TS-8989 PXIe Functional Test System - U8989B Figure 1-4 TS-8989 PXIe Functional Test System dimensions (front view without strain relief brackets) Keysight TS-8989 Site Preparation and Installation Guide...
TS-8989 PXIe Functional Test System - U8989B Figure 1-5 TS-8989 PXIe Functional Test System dimensions (side view without strain relief brackets) Keysight TS-8989 Site Preparation and Installation Guide...
TS-8989 PXIe Functional Test System - U8989B Figure 1-6 TS-8989 PXIe Functional Test System dimensions (top view without strain relief brackets) Keysight TS-8989 Site Preparation and Installation Guide...
TS-8989 PXIe Functional Test System - U8989B Figure 1-7 TS-8989 PXIe Functional Test System dimensions (front view with strain relief brackets) Keysight TS-8989 Site Preparation and Installation Guide...
TS-8989 PXIe Functional Test System - U8989B Figure 1-8 TS-8989 PXIe Functional Test System dimensions (side view with strain relief brackets) Keysight TS-8989 Site Preparation and Installation Guide...
TS-8989 PXIe Functional Test System - U8989B Figure 1-9 TS-8989 PXIe Functional Test System dimensions (top view with strain relief brackets) Keysight TS-8989 Site Preparation and Installation Guide...
TS-8989 PXIe Functional Test System - U8989B System Power Requirements The TS-8989 PXIe functional test system has been designed for use with a single phase AC voltage of 100 - 240 VAC. Power inlet Figure 1-10 Power inlet location on the instrument interface of the TS-8989 test system The TS-8989 power inlet requirements are listed below.
TS-8989 PXIe Functional Test System - U8989B SLU to PXIe power supply cable Figure 1-11 Cable connection from the SLU to the PXIe on the TS-8989 test system Keysight TS-8989 Site Preparation and Installation Guide...
TS-8989 PXIe Functional Test System - U8989B System Transportation Requirements The TS-8989 system is shipped from the factory in a big box on one pallet (i.e. a palletized box). When transporting the system on its pallet, take note that the system must CAUTION be transported in an upright position.
Page 34
TS-8989 PXIe Functional Test System - U8989B Chassis exceeds 48 kg. Use a mechanical lift to lift the chassis. The chassis WARNING should be transported by using a rolling cart. Do not lift the chassis by the handles on the front and rear of the chassis. If you plan to mount the chassis at the top of a rack, the mechanical lift must be able to raise the chassis to approximately 60”...
– One #2 Phillips screwdriver Six screws and nuts are included in the accessory box, These screws and nuts NOTE are used to install the cable routing strain relief brackets on to the TS-8989 system. Installation Procedure (Standalone) Inspect for damage Before unpacking the system, carefully inspect the shipping container for any shipping damage.
TS-8989 PXIe Functional Test System - U8989B Unpack the system The TS-8989 PXIe functional test system and its accessories are packed in a cardboard carton with foam padding for protection during shipment. Carefully unpack the system by referring to the figures below.
Page 37
TS-8989 PXIe Functional Test System - U8989B 2 Gently lift the outer carton box straight up. Avoid using any sharp objects to cut or tear the outer carton box. Keysight TS-8989 Site Preparation and Installation Guide...
Page 38
TS-8989 PXIe Functional Test System - U8989B 3 The figure below shows the contents of the package. Remove and unpack each item carefully. Monitor Dummy carton box Industrial PC Packing foam TS-8989 System and accessories – •If you did not opt to order the monitor and/or the industrial PC, the item(s) will NOTE be replaced by a dummy carton box in your shipment.
Page 39
TS-8989 PXIe Functional Test System - U8989B 4 The figure below shows the contents of the carton box containing the TS-8989 system and its accessories. Remove the TS-8989 system and place on a flat surface. Top box cover Accessories box...
TS-8989 PXIe Functional Test System - U8989B 5 The figure below shows the contents of the TS-8989 accessories box. Verify that the standard accessories and your ordered options are included in the shipment according to the list of accessories found in the TS-8989 Wiring Guide and Hardware Reference.
Page 41
TS-8989 PXIe Functional Test System - U8989B – Some sections of the accessories box will be left empty if the corresponding NOTE accessory is not ordered (e.g. mouse, keyboard, and strain relief brackets). • – For any questions or problems with the shipment, refer to the Keysight contact numbers on the back of this manual.
Page 42
TS-8989 PXIe Functional Test System - U8989B 1 Locate the cable routing strain relief side brackets (P/N: U8989-01206), top bracket (P/N: U8989-01205), and bracket nuts (P/N: 2580-0211) and screws (P/N: E9900-06001). Keysight TS-8989 Site Preparation and Installation Guide...
Page 43
TS-8989 PXIe Functional Test System - U8989B 2 Place the left cable routing strain relief side bracket behind the TS-8989 system’s side rail. Align the mounting holes. Keysight TS-8989 Site Preparation and Installation Guide...
Page 44
TS-8989 PXIe Functional Test System - U8989B 3 Using a #2 Phillips screwdriver, insert and tighten the nuts and screws securely. Keysight TS-8989 Site Preparation and Installation Guide...
Page 45
TS-8989 PXIe Functional Test System - U8989B 4 Repeat step 2 and step 3 for the right cable routing strain relief side bracket. Keysight TS-8989 Site Preparation and Installation Guide...
Page 46
TS-8989 PXIe Functional Test System - U8989B 5 Finally, place the cable routing strain relief top bracket in front of the installed cable routing strain relief side brackets. Align the mounting holes. Using the #2 Phillips screwdriver, insert and tighten the nuts and screws securely.
Page 47
TS-8989 PXIe Functional Test System - U8989B Install the SLU card strain relief bracket The SLU card strain relief bracket is designed to help hold and secure the interface cables connected to the SLU cards. Using cable ties, tie the interface cables to the holes on the SLU card strain relief bracket to reduce the strain on the SLU card and to avoid accidentally disconnecting the interface cables.
Page 48
TS-8989 PXIe Functional Test System - U8989B 2 Using a #2 Phillips screwdriver, loosen the top and bottom screws on an SLU card slightly. Insert the SLU card strain relief bracket’s grooves behind the screws. Keysight TS-8989 Site Preparation and Installation Guide...
Page 49
TS-8989 PXIe Functional Test System - U8989B 3 Tighten the top and bottom screws securely. Keysight TS-8989 Site Preparation and Installation Guide...
Page 50
TS-8989 PXIe Functional Test System - U8989B 4 The SLU card with the strain relief bracket installed is shown below. Keysight TS-8989 Site Preparation and Installation Guide...
Page 51
TS-8989 PXIe Functional Test System - U8989B 5 Using cable ties, tie the interface cables to the holes on the SLU card strain relief bracket. Keysight TS-8989 Site Preparation and Installation Guide...
Figure 1-13 Plug the male end into a three- prong grounded electrical outlet. DO NOT turn on the TS-8989 system until the interface cables are CAUTION connected. Turn off the power to the TS-8989 system when changing the connections between the cards or instrument.
Page 53
TS-8989 PXIe Functional Test System - U8989B Install the power bus This section provides a step-by-step guide on the powerbus installation in the TS-8989. 1 Unscrew the screws in the powerbus connector according to your connection requirements. Keysight TS-8989 Site Preparation and Installation Guide...
Page 54
TS-8989 PXIe Functional Test System - U8989B 2 Next, insert the custom made powerbus cables or the optional N6700 Power Supply to SLU cable (E2233-61602) into the powerbus block. Then, proceed to tighten the powerbus screw accordingly to fasten the cable.
Page 55
TS-8989 PXIe Functional Test System - U8989B Under these circumstance, please proceed with the following steps instead: 1 Unscrew the screws that fastens the PXIe module on the front panel. Keysight TS-8989 Site Preparation and Installation Guide...
Page 56
TS-8989 PXIe Functional Test System - U8989B 2 Next, proceed to remove the PXIe instrument from the slot by pressing the PXIe ejector button. Then, proceed to perform step 1 step 3 in this guide. Keysight TS-8989 Site Preparation and Installation Guide...
Page 57
TS-8989 PXIe Functional Test System - U8989B 3 Finally, proceed to install back the PXIe module in its respective slot. Connect the interface cables For ease of use, each individual interface cable is labeled at both ends to help you ascertain its proper connections.
Page 58
The pins on some interface cables are also labeled (e.g. PIN 0 or PIN 1). On the NOTE TS-8989 system, take note that for cables connected to the instrument routing card, J3 connector, the lowest pin (i.e. PIN 1) to the highest pin (i.e. PIN 6) is always counted from the bottom up.
TS-8989 PXIe Functional Test System - U8989B Examples Figure 1-15 Interface cable label example (*SLU_12_J3*) The label on this end of the cable reads *SLU_12_J3*. You should connect the end of that cable to the J3 connector, in Slot 12 of the SLU subsystem.
TS-8989 PXIe Functional Test System - U8989B Figure 1-16 Interface cable label example (*PXI_5_AUXOUT*) The label on this end of the cable reads *PXI_5_AUXOUT*. You should connect the end of that cable to the AUXOUT connector, in Slot 5 of the PXIe subsystem.
TS-8989 PXIe Functional Test System - U8989B Figure 1-17 Interface cable label example (*SLU_Chassis*) The label on this end of the cable reads *SLU_Chassis*. You should connect the end of that cable to the Chassis connector of the SLU subsystem.
TS-8989 PXIe Functional Test System - U8989B Figure 1-18 Interface cable label example (PIN 1) Keysight TS-8989 Site Preparation and Installation Guide...
Turn on the power Turn on the power to the TS-8989 system. The power switch is on the right of the power connector. The STATUS LEDs light up when the TS- 8989 system is powered on.
Keysight TS-8989 PXIe Functional Test System Preparation and Installation Guide TS-8989 PXIe Functional Test Rack System - U8989BS TS-8989 PXIe Functional Test Rack System - U8989BS Keyboard, Mouse, and Printer Installation...
No operator-serviceable parts inside. Refer servicing to qualified personnel. WARNING To prevent electrical shock, do not remove instrument covers. The protection provided by the TS-8989 system may be impaired if the system is used in a manner not specified by Keysight. Typical Test System Configuration...
Page 67
It can also service to verify physical access. Figure 2-2 shows the recommended layout for a typical TS-8989 rack integrated functional test system. Allow 1m (3.3ft if space) behind the system for service. The Remote ON/Standby switch at the upper right corner of the system rack WARNING turns off all equipment.
Recommended TS-8989 rack integrated system layout (overhead view) System Power Requirements The TS-8989 rack integrated system has been designed for use with a 208V 3-Phase Wye with Neutral or a 415V 3-Phase Wye with Neutral. Figure 2-3 shows the location of the Keysight Power Distribution Unit (PDU) in your system.
Figure 2-3 Rear view of TS-8989 rack integrated system. The TS-8989 rack integrated system must have the following requirements. – The AC mains power must be supplied to the E1135C PDU of the system. – The system is powered by a 415V 3-Phase Wye with Neutral or a 208V 3-Phase Wye with Neutral.
TS-8989 PXIe Functional Test Rack System - U8989BS System electrical specifications Input Voltage No. of Phase Frequency Current 208 VAC 50/60 35A max 415 VAC 50/60 35A max Table 2-2 System electrical specifications Main supply voltage fluctuations must not exceed 10% of the nominal supply NOTE voltage.
TS-8989 PXIe Functional Test Rack System - U8989BS 120/208V 3-Phase Wye with Neutral Mains disconnect MAM55, V1=0 I4-2 L2 L3 I4-1 Connect mains here Control Board Figure 2-5 120/208V 3-Phase Wye with Neutral Connection If loads of 120V to 127V are required, the neutral must be connected.
TS-8989 PXIe Functional Test Rack System - U8989BS – On the E1135C PDU is a 25.4mm (1 in) hole to install a cable clamp and a power cord. Use a power cord with a locking plug (one that cannot be easily pulled from its outlet) or hard-wire the system to the AC power.
TS-8989 PXIe Functional Test Rack System - U8989BS Additional Power Information – Conventional 50/60Hz current probes cannot make accurate input current measurements of the system’s power supplies due to the harmonics on the currents. A current measuring instrument needs a bandwidth that is above 10Khz.
TS-8989 PXIe Functional Test Rack System - U8989BS – installed within 3 meters of the system, where it can be easily reached by system operator without requiring the system the system to be moved to access the disconnect, – open for all line conductors and neutral conductor where your local code applies, but not the protective earth conductor.
– It is extremely important that the neutral and ground be connected only at the transformer using an X-O bond. Safety Ground Connection As the TS-8989 is connected to the AC mains by means of a plug/socket connection, a permanent earth ground must be supplied to reduce the risk of electrical shock.
TS-8989 PXIe Functional Test Rack System - U8989BS Protective earth connection at the AC source where the system AC power cord is connected Earth (ground) terminal System Toothed rack Toothed washers washers Wire lug Wire lug Bare wire or green...
TS-8989 PXIe Functional Test Rack System - U8989BS System Transportation Requirements (Rack Integrated) The system is shipped from the factory on one pallet with a few smaller boxes. Ramp requirements The cabinet will negotiate ramps with inclines up to 8 degrees before the leveling feet drag on the floor when moved on its casters.
TS-8989 PXIe Functional Test Rack System - U8989BS Keyboard, Mouse, and Printer Installation Tools Required – One #2 Phillips screwdriver Four captive nuts are installed on the front of the test rack to receive the NOTE keyboard shelf screws. These nuts are located immediately below the flat panel display.
TS-8989 PXIe Functional Test Rack System - U8989BS Attach the mouse tray Attach the mouse tray to the keyboard shelf. Make sure that the two hooks engage the shelf and the bottom of the tray is inserted into the tab under the keyboard shelf.
TS-8989 PXIe Functional Test Rack System - U8989BS Install the palm rest Install the plastic palm rest by slipping it into the slots in the keyboard shelf. Palm Rest Slot Figure 2-11 Installing the palm rest Keysight TS-8989 Preparation and Installation Guide...
TS-8989 PXIe Functional Test Rack System - U8989BS Connect the keyboard and mouse Connect the keyboard and mouse connectors to the extension cables (extension cables are labelled “Keyboard” and “Mouse”). Slide the excess cabling into the slot in the keyboard shelf.