Download Print this page
Keysight Streamline B Series Installation Manual
Keysight Streamline B Series Installation Manual

Keysight Streamline B Series Installation Manual

Vna for ae69x0t

Advertisement

Quick Links

Keysight Automotive Channel Test Software Installation Guide
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the Streamline B Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Keysight Streamline B Series

  • Page 1 Keysight Automotive Channel Test Software Installation Guide...
  • Page 2 227.7103-5 (c), as applicable in any Do not proceed beyond a WARNING technical data. notice until the indicated conditions are fully understood and met. Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide...
  • Page 3: Table Of Contents

    Content Introduction Overview of the Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Tx Compliance Test Suite ......8 System Requirements .
  • Page 4 THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK. Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide...
  • Page 5: List Of Figures

    Figure 3-15 Manual Calibration Test Result from application ..31 Figure 3-16 Manual Calibration Test Result from VNA ..32 Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide...
  • Page 6 THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK. Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide...
  • Page 7: Introduction

    Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide Introduction Overview of the Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Tx Compliance Test Suite System Requirements...
  • Page 8: Overview Of The Keysight Streamline B Series P50Xxb/P93Xxb Vna For Ae69X0T Tx Compliance Test Suite

    Compliance Test Suite Installation Guide describes the system requirements, detailed installation steps and test execution steps to incorporate the Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Tx Compliance Test Suite. The Streamline B Series Vector Network Analyzers (VNAs) from Keysight are compact, high-performance instruments designed for a variety of network analysis tasks.
  • Page 9: System Requirements

    Introduction System Requirements This section explains the detailed system requirements to operate the Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Tx Compliance Test Suite, namely, hardware requirement and software requirement. Hardware Requirement Before running the Streamline B Series P50xxB/P93xxB VNA for AE69x0T Tx Compliance Test Suite, set up the hardware components according to the required application.
  • Page 10: Figure 1-1 Hardware Setup And Connection

    3 Connect the Streamline B VNA to DUT Fixture by using a SMA cable. User should connect the Streamline B VNA to power source by using a power NOTE cable. Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide...
  • Page 11: Software Requirement

    Software Requirement Required Software Besides hardware requirements, the software that is required for Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Tx Compliance Test Suite is: – USB VNA Fireware Software (No License Required) Refer to Chapter 2, "Getting Started"...
  • Page 12 Introduction THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK. Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide...
  • Page 13: Getting Started

    Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide Getting Started Setup Configure...
  • Page 14: Setup

    Getting Started Setup Download and install the USB VNA Fireware revision software from the link below. – USB VNA Fireware Software Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide...
  • Page 15: Configure

    1 Upon connecting the instrument (VNA) to PC using Thunderbolt 3.0 or 4.0 cable, launch the "Network Analyzer" application. 2 The device will be visible in the VNA software as shown in Figure 2-1. Figure 2-1 Keysight VNA Instrument Connection Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide...
  • Page 16: Figure 2-2 Select Device And Click Run

    Getting Started 3 Select the device and click Run. The Network Analyzer window will be launched successfully. Figure 2-2 Select device and click run Figure 2-3 Network Analyzer window is launched Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide...
  • Page 17: Vna Software

    3 Set the address to a desired number. For example, “0”. 4 Enable remote accessibility of drive by clicking on the checkbox of Enable Remote Drive Access. 5 Click OK. Figure 2-4 Remote Interface Configuration Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide...
  • Page 18: Keysight Connection Expert (On Pc)

    HiSlip number is the same as the Address numbering you entered above in step 3 on the VNA software, for instance "hislip0". 6 Under Verify Connection, click Test this VISA Address. 7 Click OK. Figure 2-5 Test this VISA Address Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide...
  • Page 19: Keysight Connection Expert (On Oscilloscope)

    4 Enter the Hostname or IP Address of PC, which is connected to VNA. 5 Under Set Protocol, select HiSlip. 6 Under Verify Connection, click Test this VISA Address. 7 Click OK. Figure 2-6 Test this VISA Address Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide...
  • Page 20 Getting Started THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK. Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide...
  • Page 21: Operation

    Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide Operation Operating the test...
  • Page 22: Operating The Test

    2 Click on the + (Add) button on the Action column. Select the VNA and click Ok button to connect the instrument. Figure 3-1 Connecting the instrument 3 Upon connection, a message prompts up as Connected to P5024B. Figure 3-2 Connected to P5024B Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide...
  • Page 23: Run Vna Test In Automated Mode

    2 Set the channels and click the Calibrate button on the VNA Calibration Setup windows to start calibrating. Figure 3-5 shows the calibration is in progress. Figure 3-4 Click Calibrate button Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide...
  • Page 24: Figure 3-5 Calibration In Progress

    Operation Figure 3-5 Calibration in progress Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide...
  • Page 25: Figure 3-6 Select Vna Test

    3 Once the calibration is done, select the VNA Test (MDI Return Loss or mode Conversion) from the select test tab and click the Run Tests on the Connect tab. Figure 3-6 Select VNA Test Figure 3-7 Click Run Test in Connect Tab Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide...
  • Page 26: Figure 3-8 Automated Calibration Test Results From Application

    Operation 4 Result for automated calibration test. Test ran successfully. – From application Figure 3-8 Automated calibration test results from application Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide...
  • Page 27: Figure 3-9 Vna Calibration Test Results From Vna

    Operation – From VNA Figure 3-9 VNA Calibration Test Results from VNA Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide...
  • Page 28: Run Vna Test In Manual Mode

    1 Firstly, switch VNA to emulator mode (5071). Select Utility > System > System Setup > Code Emulation > 5071 and click Start button. Figure 3-10 Switch VNA to emulator mode Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide...
  • Page 29: Figure 3-11 Click Start

    Operation Figure 3-11 Click Start 2 Choose the Manual Calibration option in Application. Figure 3-12 Manual Calibration Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide...
  • Page 30: Figure 3-13 Select Test

    Operation 3 Select the return loss test from the Select Test tab and click the Run test on the connect tab. Figure 3-13 Select Test Figure 3-14 Click Run Tests Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide...
  • Page 31: Figure 3-15 Manual Calibration Test Result From Application

    Operation 4 Result for Manual Calibration test. Test ran successfully. – From application Figure 3-15 Manual Calibration Test Result from application Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide...
  • Page 32: Figure 3-16 Manual Calibration Test Result From Vna

    Operation – From VNA Figure 3-16 Manual Calibration Test Result from VNA Keysight Streamline B Series P50xxB/P93xxB VNA for AE69x0T Installation Guide...
  • Page 33 THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK.
  • Page 34 This information is subject to change without notice. © Keysight Technologies 2024 September 2024 Printed in Malaysia 9924-01802 www.keysight.com...

This manual is also suitable for:

Streamline p50 b seriesStreamline p93 b series