Download Print this page

Gree MULTIPRO GMV-V WL/C-T Series Quick Start Manual page 6

Advertisement

CENTRAL CONTROL / COOLAUTOMATION
WIRING AND ADDRESS SET UP
NOTE
This only applies if there is more than one Condenser that will have a Central Controller or has
CoolAutomation.
Before Applying power to the Condenser
Make sure G1 and G2 are wired in daisy chain between outdoor units.
Set dip switches on outdoor units
This should done before start up even if Central Control or Automation is not being connected until a later date.
1 = OFF
0 = On
Dip switches are located on the
main board of the condenser
Address one is default, all dip switches on.
GR EE M ULTIPRO QUICK STA RT GUID E
| 6

Advertisement

loading
Need help?

Need help?

Do you have a question about the MULTIPRO GMV-V WL/C-T Series and is the answer not in the manual?

Subscribe to Our Youtube Channel