Page 2
Info. ASSEMBLY INSTRUCTIONS Steps. Ethernet Pay attention to. Bag with screws. Power Unlocked. Pay attention to. Lock. Ventilation Level check. Air Ionizer Allen key needed. Allen key and screws needed. Don’t. Lighting T-Handle hex key needed. Pay attention not Motion sensor T-Handle hex key and screws needed.
Page 3
Assembly in 225 min. with 3 people Included x2 Sucction cups x1 Allen Key 2 x1 Allen Key 3 x1 T-Handle Hex Key 4 x1 T-Handle Hex Key 5 x1 T-Handle Hex Key 7 x1 Ceiling Panels Adjuster...
Page 4
Elements x6 Interior Panels x1 Left Back x2 Left & x3 Right Structure Panels x1 Left & x1 Right Back Glass Walls x1 Left & x1 Right Front Glass Walls x1 Center Back Glass Wall x1 Left & x1 Right Front Glass Walls x1 Door Frame x4 Exterior Panels...
Page 5
Elements x2 Ceiling Coupling connections x1 Back Ceiling x2 Ceiling x9 Acoustic Felt Ceiling Panels x2 Left Coupling connection, & x2 Right Coupling connections x9 Carpet, x6 Dividers x1 Back Floor x2 Media adjuster x1 Middle Floor x1 Door Handle x1 Front Floor x2 Floor Coupling connections...
Page 10
Middle floor T-Handle Hex Key 4 T-Handle Hex Key 7 Inside *Ensure the power cables are matched according to the labels (color, symbol and letter)
Page 11
Middle ceiling x16 with T-Handle Hex Key 4 T-Handle Hex Key 7 Inside Outside *Ensure the power cables are matched according to the labels (color, symbol and letter)
Page 12
Left Bottom x8 with T-Handle Hex Key 4 Bottom...
Page 14
Front floor T-Handle Hex Key 4 T-Handle Hex Key 7 Inside *Ensure the power cables are matched according to the labels (color, symbol and letter)
Page 15
Front ceiling x20 with T-Handle Hex Key 4 T-Handle Hex Key 7 Sucction cup handles Inside *Ensure the power cables are matched according to the labels (color, symbol and letter)
Page 16
Recommendation It is recommended to start with the Center Back Glass Wall. T-Handle Hex Key 7 Sucction cup handles Inside *Ensure the power cables are matched according to the labels (color, symbol and letter)
Page 18
Recomandation It is recomended to start with the Door Frame. Sucction cup handles The door opening can be oriented Left or Right just by rotating the frame.
Page 19
x6 with T-Handle Hex Key 4 x2 with Allen Key 3 Exterior Interior Exterior Interior...
Page 20
Pay attention not to break the glass door. Adjust the glass door Do not close until you accordingly if needed. check the glass door not to hit the door frame edge. Allen Key 3 Allen Key 2 Bottom To adjust the glass door the height must be calibrated.
Page 21
T-Handle Hex Key 7 Sucction cup handles Inside...
Page 22
The Main Power and Ethernet supply are located at the front of the pod.
Page 24
How to place the Acoustic Felt Ceiling Panels. How to remove or adjust the Acoustic Felt Ceiling Panels. If you are satisfied with the pod’s position, you can place the carpets. If you want to reposition the pod, you have to remove the carpet, if needed, and unlock the legs.
Page 26
Eliade Tower, Mircea Eliade No.18 RO-Bucharest, 012015 T +40 212 121 381 contact@askiafurniture.ro www.askiafurniture.ro Last update: 11.12.2024...
Need help?
Do you have a question about the Kameleon K6 Glass and is the answer not in the manual?
Questions and answers