Download Print this page

Advertisement

Quick Links

Kameleon K6 - Solid Back
ASSEMBLY INSTRUCTIONS
ACOUSTIC PODS

Advertisement

loading
Need help?

Need help?

Do you have a question about the Kameleon K6 Solid Back and is the answer not in the manual?

Questions and answers

Summary of Contents for Askia Kameleon K6 Solid Back

  • Page 1 Kameleon K6 - Solid Back ASSEMBLY INSTRUCTIONS ACOUSTIC PODS...
  • Page 2 Info. ASSEMBLY INSTRUCTIONS Steps. Ethernet Pay attention to. Bag with screws. Power Unlocked. Pay attention to. Lock. Ventilation Level check. Air Ionizer Allen key needed. Allen key and screws needed. Don’t. Lighting T-Handle hex key needed. Pay attention not Motion sensor T-Handle hex key and screws needed.
  • Page 3 Assembly in 225 min. with 3 people Included x1 Allen Key 2 x1 Allen Key 3 x1 T-Handle Hex Key 4 x1 T-Handle Hex Key 5 x1 T-Handle Hex Key 7 x1 Ceiling Panels Adjuster x2 Sucction cups...
  • Page 4 Elements x2 Back x2 Middle x2 Back Structure Panels x1 Middle Structure Panel x2 Exterior Back x1 Exterior Middle Panels Back Panels Panels Panel x1 Left Back & 2 Left & x3 Right Structure Panels x6 Exterior Panels x1 Door Frame x1 Left &...
  • Page 5 Elements x2 Ceiling Coupling connection x1 Back Ceiling x1 Middle Ceiling x1 Front Ceiling x2 Left & x2 Right Coupling connections x9 Acoustic Felt Ceiling Panels x9 Carpet, x6 Dividers x2 Media adjuster Back Floor Middle Floor x1 Door Handle Front Floor x2 Floor Coupling connection...
  • Page 6 T-Handle Hex Key 4...
  • Page 7 x16 with T-Handle Hex Key 4...
  • Page 8 Bottom x8 with T-Handle Hex Key 4 Bottom...
  • Page 9 Bottom T-Handle Hex Key 7 Bottom Inside Outside...
  • Page 10 T-Handle Hex Key 4 T-Handle Hex Key 7 Inside *Ensure the power cables are matched according to the labels (color, symbol and letter)
  • Page 11 x16 with T-Handle Hex Key 4 T-Handle Hex Key 7 Inside Outside *Ensure the power cables are matched according to the labels (color, symbol and letter)
  • Page 12 Bottom x8 with T-Handle Hex Key 4 Bottom...
  • Page 13 Bottom T-Handle Hex Key 7 Bottom Inside Outside...
  • Page 14 T-Handle Hex Key 4 T-Handle Hex Key 7 Inside *Ensure the power cables are matched according to the labels (color, symbol and letter)
  • Page 15 x16 with T-Handle Hex Key 4 T-Handle Hex Key 7 Inside Outside *Ensure the power cables are matched according to the labels (color, symbol and letter)
  • Page 16 Recommendation It is recommended to start with the Center Back Glass Wall. T-Handle Hex Key 7 Sucction cup handles Inside *Ensure the power cables are matched according to the labels (color, symbol and letter)
  • Page 17 T-Handle Hex Key 7 Sucction cup handles Inside Outside...
  • Page 18 x8 with T-Handle Hex Key 4...
  • Page 19 Recommendation It is recommended to start with the Door Frame. Sucction cup handles The door opening can be oriented Left or Right just by rotating the frame.
  • Page 20 x6 with T-Handle Hex Key 4 x2 with Allen Key 3 Exterior Interior Exterior Interior...
  • Page 21 Pay attention not to break the glass door. Adjust the glass door if Check if the glass door necessary. hits the frame edge before closing it. Allen Key 3 Allen Key 2 Bottom To adjust the glass door the height must be calibrated.
  • Page 22 T-Handle Hex Key 7 Sucction cup handles Inside Outside...
  • Page 23 The Main Power and Ethernet supply are located at the front of the pod.
  • Page 24 How to remove the Interior Panel.
  • Page 25 How to rem ove the I n terior Panel.
  • Page 26 How to place the Acoustic Felt Ceiling Panels. How to remove or adjust the Acoustic Felt Ceiling Panels. If you are satisfied with the pod’s position, you can place the carpets. If you want to reposition the pod, you have to remove the carpet, if needed, and unlock the legs.
  • Page 28 Eliade Tower, Mircea Eliade No.18 RO-Bucharest, 012015 T +40 212 121 381 contact@askiafurniture.ro www.askiafurniture.ro Last update: 10.12.2024...