Download Print this page

Mercia Garden Products 05DTMBAX0307DD-V2 Instruction Manual

3x7 apex double door storage

Advertisement

Quick Links

x2
MADE IN GREAT BRITAIN
2mm Drill bit
Water proof
Preservative

Advertisement

loading
Need help?

Need help?

Do you have a question about the 05DTMBAX0307DD-V2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 05DTMBAX0307DD-V2

  • Page 1 MADE IN GREAT BRITAIN 2mm Drill bit Water proof Preservative...
  • Page 2 ANY QUESTIONS? Scan the QR code to contact us via our customer portal.
  • Page 3 ACCESSING VIDEO GUIDES... ACCESSING VIDEO GUIDES... 3. Scan QR code... Some steps within this set of instructions come with an added video guide for your convenience. These can be accessed via the QR code and used to aid you in constructing that step.
  • Page 4 End View 05DTMBAX0307DD-V2 Overall Dimensions: Bolt Block 28x28x132mm QTY 4 Width = 2096mm FS2828-132mm Depth = 873mm End View Height = 1798mm Base Dimensions: Fascia 12x56x1095mm QTY 4 Width = 1976mm S1256-1095mm Depth = 795mm End View Ridge Bar 28x28x744mm QTY 1...
  • Page 5 Pre Assembly Before assembly, please make sure you have a suitable Before assembling remove the transportation blocks from the bottom of each base ready to install your building onto. panel. Take care removing the blocks as to not damage the panels. Tap with a at Step 1 headed screwdriver and hammer.
  • Page 6 Step 2 Step 4 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 4 QTY 2 Parts Needed - No. 1 QTY 1 No. 6 QTY 1 Place the Floors (No. 4) on a rm and level base, ensure the base has Locate the Door Gable (No.
  • Page 7 Step 6 Step 8 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 3 QTY 2 Parts Needed - No. 14 QTY 1 Locate the Roof (No. 3) onto the Cut the Felt (No. 14) to one sheet measuring: building, ensuring they sit square. 2320mm (L) x 1000mm (W).
  • Page 8 Step 9 Step 11 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 8 QTY 4 Parts Needed - No. 7 QTY 4 No. 16 QTY 2 On the inside framing of the Doors and Locate the Fascias (No.
  • Page 9 Step 13 Step 15 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 11 QTY 2 Once constructed, apply a preserving Locate the Door Trims (No. 11) onto the treatment and a waterproo ng treatment inside of the Door Gable opening and x to your garden building as soon as into place using 3x30mm screws per possible.
  • Page 10 ANY QUESTIONS? Scan code contact us via our customer portal.

This manual is also suitable for:

05dtovax0307dd-v2