PLEASE SCAN HERE: ANY QUESTIONS? Scan code contact us via our customer portal.
Page 3
ACCESSING VIDEO GUIDES... ACCESSING VIDEO GUIDES... 3. Scan QR code... Some steps within this set of instructions come with an added video guide for your convenience. These can be accessed via the QR code and used to aid you in constructing that step.
Page 4
End View Before assembly please make sure you have a Eaves Frame - 28x28x1786mm QTY 1 suitable base ready to erect your F2828-1786mm building End View Door Block - 28x28x140mm QTY 2 F2828-140mm End View Fascia - 12x95x1810mm QTY 2 MADE IN GREAT BRITAIN S1295-1810mm End View...
Page 5
Step 2 Pre Assembly PLEASE SCAN HERE: Parts Needed - No. 5 QTY 1 Before assembling remove the transportation blocks from the bottom of each panel. Place the Floor (No. 5) on a rm and level base, ensure base has suitable drainage free Take care removing the blocks as to not damage the panels.
Page 6
Step 6 Step 4 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 2 QTY 1 Once the roof is tted, x the No. 4 QTY 1 panels to the oor internally using Place the Front Panel (No. 2) and the Plain 50mm screws in line with the oor Gable Right (No.4) onto the Floor (No.5), bearers.
Page 7
Step 7 Step 8 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 17 QTY 1 Parts Needed - No. 9 QTY 2 No. 14 QTY 2 Cut the Felt (No. 17) into one sheet measuring 1890mm and lay onto the Attach the Door Blocks (No.9) to the roof as shown in the diagram.
Page 8
Step 10 IMPORTANT: Pre-drill before xing screws. Step 12 Parts Needed - No. 12 QTY 2 No. 13 QTY 2 Once constructed, apply a preserving treatment and a waterproo ng treatment Fix the Smaller Cover Trims (No. 13) to to your garden building as soon as the front of the building using possible.
Page 9
PLEASE SCAN HERE: ANY QUESTIONS? Scan code contact us via our customer portal.
Need help?
Do you have a question about the 05DTOVPN0306DD-V2 and is the answer not in the manual?
Questions and answers