Download Print this page

Mercia Garden Products 05DTOVAX0307DD-V2 Quick Start Manual

3x7 overlap apex double doors storage unit
Hide thumbs Also See for 05DTOVAX0307DD-V2:

Advertisement

Quick Links

x2
MADE IN GREAT BRITAIN
2mm Drill bit
Water proof
Preservative

Advertisement

loading
Need help?

Need help?

Do you have a question about the 05DTOVAX0307DD-V2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 05DTOVAX0307DD-V2

  • Page 1 MADE IN GREAT BRITAIN 2mm Drill bit Water proof Preservative...
  • Page 2: Any Questions

    ANY QUESTIONS? Scan the QR code to contact us via our customer portal.
  • Page 3 ACCESSING VIDEO GUIDES... ACCESSING VIDEO GUIDES... 3. Scan QR code... Some steps within this set of instructions come with an added video guide for your convenience. These can be accessed via the QR code and used to aid you in constructing that step.
  • Page 4 End View 05DTOVAX0307DD-V2 Overall Dimensions: Base Dimensions: Width = 2101mm Width = 1980mm Fascia - 7x60x1095mm QTY 4 Depth = 839mm Depth = 795mm S760-1095mm Height = 1719mm End View Cover Trim - 7x45x1324mm QTY 4 S745-1324mm End View Door Trim - 12x27x1261mm QTY 2...
  • Page 5: Missing Parts

    Before assembly, please make sure you have a suitable Missing parts? base ready to install your building onto. Scan the QR code to visit our customer portal where you can Step 1 IMPORTANT: Pre-drill before xing screws. quickly raise any missing or Parts Needed - No.
  • Page 6 Step 2 Step 4 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 6 QTY 2 Parts Needed - No. 1 QTY 1 No. 2 QTY 1 Place the oors (No. 6) on a rm and level base, ensure the base has suitable Locate the Assembled Door Gable (No.
  • Page 7 Step 6 Step 8 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 5 QTY 2 Parts Needed - No. 18 QTY 1 No. 10 QTY 2 Cut the Felt (No. 18) into one sheet Attach one Eaves Frame (No. 10) measuring: 2350mm (L) X 1000mm (W).
  • Page 8 Step 9 Step 11 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 7 QTY 4 Parts Needed - No. 12 QTY 2 No. 13 QTY 2 On the left-hand Door, locate Locate the Fascias (No. 7) to the front the bolt blocks (No.
  • Page 9 Step 13 Step 15 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 9 QTY 2 Once constructed, apply a preserving Locate the Door Strips (No. 9) onto the treatment and a waterproo ng treatment inside of the door gable framing, as to your garden building as soon as shown.
  • Page 10 ANY QUESTIONS? Scan code contact us via our customer portal.