Download Print this page

Mercia Garden Products 05DTOVPN0305DD-V1 Manual

3x5 overlap pent storage
Hide thumbs Also See for 05DTOVPN0305DD-V1:

Advertisement

Quick Links

x2
2mm Drill bit

Advertisement

loading
Need help?

Need help?

Do you have a question about the 05DTOVPN0305DD-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 05DTOVPN0305DD-V1

  • Page 1 2mm Drill bit...
  • Page 2: Any Questions

    PLEASE SCAN HERE: ANY QUESTIONS? Scan code contact us via our customer portal.
  • Page 3 ACCESSING VIDEO GUIDES... ACCESSING VIDEO GUIDES... 3. Scan QR code... Some steps within this set of instructions come with an added video guide for your convenience. These can be accessed via the QR code and used to aid you in constructing that step.
  • Page 4 Before assembly Door Strip - 7 x 45 x 1264mm QTY 2 please make sure you have a S745-1264MM suitable base ready to erect your building Large Fascia - 7 x 60 x 1429mm QTY 1 S760-1429MM Small Fascia - 7 x 60 x 945mm QTY 2 MADE IN GREAT BRITAIN S760-945MM Overall Dimensions:...
  • Page 5: Pre-Assembly

    IMPORTANT: Pre-drill before xing screws. Step 2 Pre Assembly PLEASE SCAN HERE: Parts Needed - No. 4 QTY 1 Before assembling remove the transportation blocks from the bottom of each panel. - No. 3 QTY 1 Take care removing the blocks as to not damage the panels. Tap with a at headed Place the plain panel (No.4) and the screwdriver and hammer.
  • Page 6 Step 6 Step 4 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed- No.12 QTY 4 Parts Needed - No. 1 QTY 1 No.7 QTY 2 Locate the front panel (No.1) in Locate two T Hinges (No.12) onto each Door between the gables.
  • Page 7 Step 8 Step 10 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 6 QTY 1 Parts Needed - No. 15 Qty 1 Place the roof sheet (No.6) on top of Cut the felt (No.15) into one sheet the building and x into place with measuring: 1530mm (L) x 1000mm (W) 10x30mm screws.
  • Page 8 Step 11 Step 13 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 10 QTY 2 Parts Needed - No. 13 QTY 2 - No. 9 QTY 1 - No. 14 QTY 1 Locate the turn button (No. 13) to Attach the large (No.9) and small the top of the left hand door, ensur- (No.10) Fascias to the front and sides...
  • Page 9 PLEASE SCAN HERE: ANY QUESTIONS? Scan code contact us via our customer portal.