Download Print this page

Advertisement

Quick Links

CoolPhase CDU
Installer/User Guide
Refrigerant to Chilled Fluid Cooling Distribution Unit XDM300

Advertisement

loading
Need help?

Need help?

Do you have a question about the CoolPhase CDU and is the answer not in the manual?

Questions and answers

Summary of Contents for Vertiv CoolPhase CDU

  • Page 1 CoolPhase CDU Installer/User Guide Refrigerant to Chilled Fluid Cooling Distribution Unit XDM300...
  • Page 2 The information contained in this document is subject to change without notice and may not be suitable for all applications. While every precaution has been taken to ensure the accuracy and completeness of this document, Vertiv assumes no responsibility and disclaims all liability for damages resulting from use of this information or for any errors or omissions.
  • Page 3 4.2 Storing Before Installation 4.3 Handling Units While Packaged 4.3.1 Recommended Unit Handling Equipment 4.4 Unpacking the Vertiv™ CoolPhase CDU Domestic Units 4.4.1 Shipping Bracket Removal, Lower Module 4.4.2 Unpacking/Removal of the Upper Module 4.4.3 Unpacking/Removal of the Lower Module 4.4.4 Removal...
  • Page 4 7.3.4 Fluid Volume for Unit and Connection Piping 7.3.5 Field Piping Connection Volumes 7.3.6 Wetted Materials List Vertiv™ CoolPhase CDU 7.3.7 Secondary Fluid Flow Considerations for Rear Door Heat Exchangers 7.3.8 Secondary Fluid Flow Considerations for Direct to Chip Cold Plates 7.3.9 Fluid Quality Requirements for Rear Door Heat Exchanger and Direct to Chip Applications...
  • Page 5 Vertiv™ CoolPhase CDU Installer/User Guide 9.5 Vertiv™ Liebert® Secondary Circuit Piping Installation Checks 10 Troubleshooting 11 Initial Start-up Checks and Commissioning Procedure for Warranty Inspection 12 Maintenance 12.1 Safety Instructions 12.2 Maintenance Schedule 12.3 Fluid and Piping Maintenance 12.4 Spare Parts 12.5 Electronic Expansion Valve (EEV) Maintenance...
  • Page 6 Vertiv™ CoolPhase CDU Installer/User Guide This page intentionally left blank Proprietary and Confidential ©2024 Vertiv Group Corp.
  • Page 7 This manual contains important safety instructions that should be followed during the installation and maintenance of the Vertiv™ CoolPhase CDU. Read this manual thoroughly before attempting to install or operate this unit. Only qualified personnel should move, install or service this equipment.
  • Page 8 Before proceeding with installation, read all instructions, verify that all the parts are included, and check the nameplate to be sure the voltage matches available utility power. The Vertiv™ Liebert® iCOM™ controller does not isolate power from the unit, even in the Unit Off mode. Some internal components require and receive power even during the Unit Off mode of the Liebert®...
  • Page 9 Building and equipment damage may also result. Installation and service of this equipment should be done only by qualified personnel who have been specialized training for liquid cooling equipment and who are wearing appropriate, OSHA-approved PPE. 1 Important Safety Instructions Proprietary and Confidential ©2024 Vertiv Group Corp.
  • Page 10 Upon arrival verify that labeled equipment matches Bill of Lading. Carefully inspect all items for either visible or concealed damage. Damage should be immediately reported to carrier and a damage claim filed with a copy sent to Vertiv or to your sales representative.
  • Page 11 Proper inhibitor maintenance must be performed in order to prevent corrosion of the system. Consult glycol manufacturer for testing and maintenance of inhibitors. 1 Important Safety Instructions Proprietary and Confidential ©2024 Vertiv Group Corp.
  • Page 12 Water leakage can result in severe property damage and loss of critical data center equipment. Do not locate unit directly above any equipment that could sustain water damage. Vertiv recommends installing monitored leak detection equipment for the unit and supply and return lines. NOTICE Risk of a catastrophic water circuit rupture.
  • Page 13 Risk of improper component re-installation. Can cause equipment damage. Identify and mark location of suction pressure transducer and discharge pressure switch. These devices look similar and they must be reinstalled in their original location. 1 Important Safety Instructions Proprietary and Confidential ©2024 Vertiv Group Corp.
  • Page 14 Vertiv™ CoolPhase CDU Installer/User Guide This page intentionally left blank Proprietary and Confidential ©2024 Vertiv Group Corp. 1 Important Safety Instructions...
  • Page 15 Vertiv™ CoolPhase CDU Installer/User Guide 2 Nomenclature and Components This section describes the model number for Vertiv™ CoolPhase CDU units and components. 2.1 Model Number Nomenclature Table 2.3 on page 12 describes each digit of the 36 digit configuration number. The 14 digit model number consists of the first 10 digits and last four digits of the configuration number.
  • Page 16 Vertiv™ CoolPhase CDU Installer/User Guide Table 2.3 Model Number Digit Definitions for CoolPhase CDU (continued) Digit and Description Digit 10 = Cooling Configuration Options T = Tandem with digital, R-410A Digit 11 = Condenser Match-up 4 = Liebert® MCV440 5 = Liebert® MCV430 Digit 12 = Display 2 = Liebert®...
  • Page 17 Vertiv™ CoolPhase CDU Installer/User Guide Table 2.3 Model Number Digit Definitions for CoolPhase CDU (continued) Digit and Description Digit 23 = Secondary Circuit Filtration 0 = None 2 = Fitted (50µ) 3 = Fitted (100µ) 4 = Fitted (500µ) Digit 24 = None...
  • Page 18 2.2.1 Vertiv™ CoolPhase CDU The Vertiv™ CoolPhase CDU is an indoor chiller that connects directly to the Vertiv™ Liebert® DCD cooling modules and is designed to circulate and control coolant to single-phase liquid cooled IT equipment. The CoolPhase CDU keeps the coolant temperature above the room dew point by using sensors.
  • Page 19 Vertiv™ CoolPhase CDU Installer/User Guide Figure 2.1 Vertiv™ CoolPhase CDU System - Rear Door Heat Exchangers Figure 2.2 CoolPhase CDU System - Chip Cooling Applications Figure 2.3 CoolPhase CDU System - Direct to Chip Cooling Applications 2 Nomenclature and Components Proprietary and Confidential ©2024 Vertiv Group Corp.
  • Page 20 4. What is the server load in each cabinet going to be? 5. What is the maximum distance between the Vertiv™ CoolPhase CDU unit and the farthest heat load (rear door or direct chip server cabinet) in the proposed layout? Look at the pump chart drawing.
  • Page 21 8. If the operating point changes, the secondary fluid coolant volume may need to be adjusted according to the new operating point. 9. The return secondary fluid temperature to the CoolPhase CDU must be stable before loading IT equipment into fluid circuit.
  • Page 22 Vertiv™ CoolPhase CDU Installer/User Guide Figure 2.5 Interlaced Separate Loops Proprietary and Confidential ©2024 Vertiv Group Corp. 2 Nomenclature and Components...
  • Page 23 Vertiv™ CoolPhase CDU Installer/User Guide Figure 2.6 Dual Single Common Loop Reversed Return 2 Nomenclature and Components Proprietary and Confidential ©2024 Vertiv Group Corp.
  • Page 24 Vertiv™ CoolPhase CDU Installer/User Guide Figure 2.7 Vertiv™ CoolPhase CDU with DCD in Hot/Cold Aisle Application Item Description Aisle pitch, 7 tiles, 14 ft. (4.3 m) Cold aisle Hot aisle Cold aisle, 4 ft. (1.2 m) Rack, 42 in. (1,067 mm) Hot aisle, 3 ft.
  • Page 25 Rack, 42 in. (1,067 mm) Hot aisle, 3 ft. (0.91 m) 2.3.1 Vertiv™ CoolPhase CDU Minimum Load The CoolPhase CDU minimum recommended operating load is 10% of system nominal capacity. • The minimum load for a CoolPhase CDU 60Hz system is 30kW.
  • Page 26 Vertiv™ CoolPhase CDU Installer/User Guide This page intentionally left blank Proprietary and Confidential ©2024 Vertiv Group Corp. 2 Nomenclature and Components...
  • Page 27 This requirement may be driven by an equipment supplier (e.g., liquid cooled servers or rack mounted CDUs) or it may be best practices for the CW loop (to maintain water quality). 2. Field provided This Y-strainer is required near the Vertiv™ CoolPhase CDU at the CW return line to prevent Always required 30-40 mesh debris or particulates from entering the CoolPhase CDU heat exchanger.
  • Page 28 Allow at least the minimum recommended clearances for maintenance and service. See the appropriate submittal drawings for dimensions. • We recommend installing an under floor leak detection system. Contact your Vertiv representative for information. 3.1 Site Preparation Prepare the site for installation prior to arrival and unloading of the unit.
  • Page 29 The unit and floor stand dimensions are described in the submittal documents included in Submittal Drawings on page 107 . The following table lists the relevant documents by number and title. Table 3.2 Vertiv™ CoolPhase CDU Dimension Planning Drawings Document Number Title 20000058...
  • Page 30 Vertiv™ CoolPhase CDU Installer/User Guide 3.4 Unit Weights Table 3.3 Vertiv™ CoolPhase CDU Shipping Dimensions and Unit Weights, Domestic Domestic Packaging Dry Shipping Weight, lb Unit Weight With Fluid, lb Packaging Weight, lb Total Weight, lb (kg) (kg) (kg) (kg) Shipping Dimensions, in.
  • Page 31 • Carefully inspect all items for visible or concealed damage. • Report damage immediately to the carrier and file a damage claim with a copy sent to Vertiv or to your sales representative. 4.1 Packaging Material All material used to package this unit is recyclable. Please save for future use or dispose of the material appropriately.
  • Page 32 4.3.1 Recommended Unit Handling Equipment • Fork lift • Dolly carts • Spreader bars and slings • Chain hoists • Beam trolleys • Gantries Figure 4.1 Recommended Unit Handling Equipment 4 Equipment Inspection and Proprietary and Confidential ©2024 Vertiv Group Corp. Handling...
  • Page 33 Vertiv™ CoolPhase CDU Installer/User Guide 4.4 Unpacking the Vertiv™ CoolPhase CDU Domestic Units Remove the stretch wrap and exterior packaging material from the units. Figure 4.2 Packaged CoolPhase CDU 4.4.1 Shipping Bracket Removal, Lower Module • Remove plywood panels from each end of the packaged unit. See Figure 4.3 on the next page .
  • Page 34 Vertiv™ CoolPhase CDU Installer/User Guide Figure 4.3 Vertiv™ CoolPhase CDU Shipping Bracket Removal 4.4.2 Unpacking/Removal of the Upper Module • Move packaged unit to area for installation or to staging preparation area. • Remove exterior package material from the upper module of the unit.
  • Page 35 Vertiv™ CoolPhase CDU Installer/User Guide Figure 4.4 Packaged Vertiv™ CoolPhase CDU, Upper Module 4 Equipment Inspection and Proprietary and Confidential ©2024 Vertiv Group Corp. Handling...
  • Page 36 Vertiv™ CoolPhase CDU Installer/User Guide Figure 4.5 Vertiv™ CoolPhase CDU Shipping Bracket Removal 4.4.3 Unpacking/Removal of the Lower Module • Remove exterior package material from the lower module of the unit. • Remove fasteners securing five shipping brackets to the shipping skid. Refer to Figure 4.6 on the facing page , Detail C.
  • Page 37 Vertiv™ CoolPhase CDU Installer/User Guide Figure 4.6 Vertiv™ CoolPhase CDU Shipping Bracket Removal Detail C Enlargement 4.4.4 Removal • Attach the recommended lifting device or site appropriate lifting device to all lift lugs on top of the lower module. •...
  • Page 38 Upon arrival verify that labeled equipment matches Bill of Lading. Carefully inspect all items for either visible or concealed damage. Damage should be immediately reported to carrier and a damage claim filed with a copy sent to Vertiv or to your sales representative.
  • Page 39 4.8 below (detail figure 2). 4. Floorstand must be level and all feet must be in contact with floor before proceeding. Figure 4.8 Vertiv™ CoolPhase CDU Floorstand Details 4.5.3 Floorstand Anchorage Mounting requirement details such as anchor brand, type, embedment depth, edge spacing, anchor-to-anchor spacing, concrete strength, special inspection, and attachment to non-building structures must be outlined and approved by engineer of record for project or building.
  • Page 40 • Make sure to align edges of unit frame with edges of floorstand. Figure 4.9 Vertiv™ CoolPhase CDU Floorstand Details 4.5.5 Securing Unit to Floorstand Insert provided attachment brackets into eight indicated slots (four on both sides) of unit frame base. Refer to Figure 4.10 on the facing page , Figure 3.
  • Page 41 Vertiv™ CoolPhase CDU Installer/User Guide Figure 4.10 Vertiv™ CoolPhase CDU Floorstand Details 4.6 Installing the Unit without a Floorstand WARNING! Risk of improper wiring, piping, moving, lifting, and handling. Can cause equipment damage, serious injury or death. Installation and service of this equipment should be done only by qualified personnel who have been specially-trained in the installation of air-conditioning equipment and who are wearing appropriate, OSHA-approved PPE.
  • Page 42 2. Remove the end panels from the upper module, set aside in a safe location for later re-attachment. See Figure 4.12 on the facing page . Figure 4.11 Vertiv™ CoolPhase CDU Hardware Removal 3. Disengage 1/4-turn fasteners on the front doors of the upper module. Open the front doors to access fasteners holding the center panel in place.
  • Page 43 Vertiv™ CoolPhase CDU Installer/User Guide Figure 4.12 Vertiv™ CoolPhase CDU End Panel Removal NOTE: : Uninstall caps and gasket supply and return connections in upper and bottom section 4 Equipment Inspection and Proprietary and Confidential ©2024 Vertiv Group Corp. Handling...
  • Page 44 Vertiv™ CoolPhase CDU Installer/User Guide Figure 4.13 Vertiv™ CoolPhase CDU Assembled 4.6.2 Securing Unit to Concrete Slab Floor Mounting requirement details such as anchor brand, type, embedment depth, edge spacing, anchor-to-anchor spacing, concrete strength, special inspection, and attachment to non-building structures must be outlined and approved by engineer of record for project or building.
  • Page 45 Figure 4.14 Vertiv™ CoolPhase CDU Main Unit Anchorage Detail 4.6.3 Upper Module Placement onto Lower Module Attach site appropriate lifting device to lift lugs on the top of the upper module.
  • Page 46 Vertiv™ CoolPhase CDU Installer/User Guide Figure 4.15 Vertiv™ CoolPhase CDU Module Placement 4 Equipment Inspection and Proprietary and Confidential ©2024 Vertiv Group Corp. Handling...
  • Page 47 Vertiv™ CoolPhase CDU Installer/User Guide Figure 4.16 Vertiv™ CoolPhase CDU Module Placement 4.6.4 Upper Module Attachment Place M10 oversized washer and M10-1.5 nylon insert hex nut onto threaded stud, two at each end. Tighten and torque to 7.74 ft lb. (10.5 Nm). Refer to Figure 4.17 on the next page , Detail E.
  • Page 48 5. Disengage 1/4-turn fasteners on front doors of the upper module. Open front doors. Locate removed upper module center panel. Re-attach panel and tighten fasteners. Close front doors and re-engage 1/4-turn fasteners. 4 Equipment Inspection and Proprietary and Confidential ©2024 Vertiv Group Corp. Handling...
  • Page 49 Vertiv™ CoolPhase CDU Installer/User Guide Figure 4.18 Attachment Completion 4 Equipment Inspection and Proprietary and Confidential ©2024 Vertiv Group Corp. Handling...
  • Page 50 Vertiv™ CoolPhase CDU Installer/User Guide This page intentionally left blank 4 Equipment Inspection and Proprietary and Confidential ©2024 Vertiv Group Corp. Handling...
  • Page 51 CoolPhase CDU Primary Connections Top (Fluid and Refrigerant) 300kW Refrigeration Piping Layout and Condenser Positioning Drawings 20000101, p1 CoolPhase CDU Air Cooled Piping Schematic Liebert® MCV Mounted above Liebert® XDM 20000101, p2 CoolPhase CDU Piping Schematic Liebert® MCV and Liebert® XDM at Similar Level 5 Refrigerant Piping Requirements Proprietary and Confidential ©2024 Vertiv Group Corp.
  • Page 52 Table 5.1 on the previous page lists the refrigerant copper pipe connections at the Vertiv™ CoolPhase CDU. 5.2 Refrigerant Connection Locations All refrigerant and secondary circuit fluid connections are located on the top of the Vertiv™ CoolPhase CDU. See Figure 5.1 below .
  • Page 53 L1 and L2 Supply refrigerant connections (outdoor air-cooled condensers) G1 and G2 Return refrigerant connections (outdoor air-cooled condensers) NOTE: For installation clearance and access information, refer to Vertiv drawings 20000058 in Submittal Drawings page 107 5.3 Refrigerant Piping and Charging WARNING! Risk of over pressurization of the refrigeration system. Can cause explosive discharge of high pressure refrigerant, loss of refrigerant, environmental pollution, equipment damage, injury, or death.
  • Page 54 Risk of oil contamination with water. Can cause equipment damage. Vertiv™ CoolPhase CDU systems require the use of POE (polyolester) oil. POE oil absorbs water at a much faster rate when exposed to air than previous used oils. Because water is the enemy of a reliable refrigeration system, extreme care must be used when opening systems during installation or service.
  • Page 55 Vertiv™ CoolPhase CDU Installer/User Guide • The Vertiv™ CoolPhase CDU is used with a Vertiv™ Liebert® MCV heat rejection skid without receiver tanks. For these systems, the bottom of the condenser coil cannot be more than 15 ft. (4.6 m) below the elevation of the EEV inside the indoor units.
  • Page 56 450 ft (137 m) Consult the Factory Consult the Factory *Consult factory for Vertiv™ CoolPhase CDU unit can be extended to max 200ft (61m) linear or 300ft. (91m) equivalent. Source: DPN000788. NOTE: See the piping schematics for your system in Submittal Drawings on page 107...
  • Page 57 Vertiv™ CoolPhase CDU Installer/User Guide Table 5.6 Approximate R-410A Refrigerant Required per Circuit for Vertiv™ Liebert® MCV Heat Rejection Skid Heat Rejection Skid System No Circuit No. Charge per Circuit lb (kg) Liebert® MCV430 and MCV440 Single skid with (1) PRE unit 62 (28.1)
  • Page 58 The amount of oil added by field service must be recorded on the tag marked "Oil Added Field Service Record" that is attached to each compressor. The date of oil addition must be included as well. Proprietary and Confidential ©2024 Vertiv Group Corp. 5 Refrigerant Piping Requirements...
  • Page 59 NOTE: Use Copeland POE Oil ULTRA 32-3MAF or other Copeland-approved oils. Table 5.10 Volume of Oil in Standard Form Trap by Pipe Diameter Pipe Diameter, in. Oil Volume, oz (ml) 0.2 (5.9) 0.4 (11.8) 0.6 (17.7) 5 Refrigerant Piping Requirements Proprietary and Confidential ©2024 Vertiv Group Corp.
  • Page 60 Charging the Refrigerant Circuit to an Outdoor Air Cooled Condenser with Receivers ( MCV440) the facing page or Charging the Refrigerant Circuit to an Outdoor Air Cooled Condenser without Receivers ( MCV430) on page 1. Proprietary and Confidential ©2024 Vertiv Group Corp. 5 Refrigerant Piping Requirements...
  • Page 61 5. Accurately weigh in about 80% of the calculated system charge before starting the unit. Do not exceed the calculated charge by more than 0.5 lb (0.37 kg). 6. Close the Vertiv™ Liebert® MCV heat rejection skid disconnect switch. 5 Refrigerant Piping Requirements...
  • Page 62 8. If the operating point changes, the charge may need to be adjusted according to the new operating point. 9. The return secondary fluid temperature to the CoolPhase CDU is being charged it must be stable. If this is not possible due to the lack of heat load, then additional load banks must be used to offset the cooling load during start-up.
  • Page 63 Subcooling should be within ± 3°F (1.7°C) Adjust load during charging to get customer's desired supply fluid temperature. Adjust flow rate to get customer's desired dT at the Vertiv™ CoolPhase CDU. 13. Repeat steps 10 through 12 for Compressor Circuit 2.
  • Page 64 Vertiv™ CoolPhase CDU Installer/User Guide This page intentionally left blank Proprietary and Confidential ©2024 Vertiv Group Corp. 5 Refrigerant Piping Requirements...
  • Page 65 For the most reliable operation of the system, the indoor unit and the Liebert® MCV condenser should be on the same power source. The Vertiv™ Liebert® DSE system offers an option for a power feed from the active source on the indoor unit to the outdoor condenser.
  • Page 66 28.4 29.3 B = 575V/60Hz 19.0 19.7 FLA = Full Load Amps; WSA = Wire Size Amps; OPD = Maximum Overcurrent Protection Device. Table 6.3 Vertiv™ Liebert® MCV Condenser Only Electrical Data, Three-Phase Model Voltage 2 = 380V/60Hz 28.0 28.9 A = 460V/60Hz 22.4...
  • Page 67 7.1 Interconnection with Cooling Modules ASTM type ACR copper piping or stainless piping must be used in the secondary fluid circuit. The Vertiv™ CoolPhase CDU may be connected to Vertiv™ Liebert® DCD cooling modules or IT server equipment with prefabricated piping assembly or rigid, off-the-shelf piping.
  • Page 68 Water leakage can result in severe property damage and loss of critical data center equipment. Do not locate unit directly above any equipment that could sustain water damage. Vertiv recommends installing monitored leak detection equipment for the unit and supply and return lines. NOTICE Risk of a catastrophic water circuit rupture.
  • Page 69 • A field provided wye strainer is required in the chilled water return line to the CoolPhase CDU. The wye strainer protects the pump, brazed plate heat exchanger and system components from debris. Refer to specific text and detailed diagrams in this manual for other unit specific piping requirements.
  • Page 70 4. Tighten Wingnut to 25 in. lb. 5. Review joint due to thermal cycling testing of pipes and their hygienic clamp connections, then a re-torque may be needed. Figure 7.1 Hygienic Sanitary Flange Assembly 7 Secondary Fluid Circuit Proprietary and Confidential ©2024 Vertiv Group Corp. Requirements...
  • Page 71 7.3.2 Secondary Fluid Top Circuit Recommended Secondary Fluid Pipe Sizes Connect the main pipes between the Vertiv™ CoolPhase CDU and the Vertiv™ Liebert® DCD or IT equipment according to site specific documentation and the configuration guide. Minimize elbows and restrictions to get good fluid flow.
  • Page 72 * Max equivalent length applies to full loop from XDM supply to return connections . Max equivalent length calculations based on copper piping. NOTE: For systems with multiple CoolPhase CDU modules, larger pipe sizes may be required, per total design flow. 7 Secondary Fluid Circuit Proprietary and Confidential ©2024 Vertiv Group Corp.
  • Page 73 Vertiv™ CoolPhase CDU Installer/User Guide Figure 7.2 Vertiv™ CoolPhase CDU Fluid System (Top Connections) Item Description Heat Load CoolPhase CDU Ball Valve 7 Secondary Fluid Circuit Proprietary and Confidential ©2024 Vertiv Group Corp. Requirements...
  • Page 74 NOTE: If total fluid system volume per Vertiv™ CoolPhase CDU is over 95 gallons for glycol (40% or less), or 175 gallons for water, a system thermal expansion tank is required. Size per expansion tank manufacturer recommendation.
  • Page 75 Vertiv™ CoolPhase CDU Installer/User Guide 7.3.6 Wetted Materials List Vertiv™ CoolPhase CDU Primary Circuit (Refrigerant Side) Component Materials Plate heat exchanger Plates-Alloy 316L, Ports-Alloy 304L Pipe Work Copper ( ACR) 2-way shut off valve Brass body with copper extended fitting , stainless steel stop, Teflon seal...
  • Page 76 (field provided) as necessary to maintain a flow above 25 gpm (5.8 m3/h) through the CoolPhase CDU. For example, the maximum allowable water flow rate for a Vertiv™ Liebert® DCD unit is 22.7 gpm (5.2 m3/h). If four of these units are connected in parallel to the CoolPhase CDU, you can have a total flow over 90 gpm (20.4 m3/h).
  • Page 77 Vertiv recommends installing a monitored fluid-detection system that is wired to activate the automatic-closure of field- installed coolant-fluid supply and return shut-off valves to reduce the amount of coolant-fluid leakage and consequential equipment and building damage.
  • Page 78 When filling, bleed air from all vent locations until a steady stream of fluid is observed. Vent locations are provided as 1/4" SAE flare connections at various points in the factory piping of the Vertiv™ CoolPhase CDU. Vent locations should be provided at high points and long horizontal runs of the field piping as well.
  • Page 79 Failure to properly purge the air will result in pump cavitation and premature pump failure. NOTE: CoolPhase CDU controls will cause the unit to stop operation if enough air remains in the piping. This will show up as a "Loss of Flow" warning.
  • Page 80 Vertiv™ CoolPhase CDU Installer/User Guide Figure 7.4 Secondary Circuit Vent Port Location in the Vertiv™ CoolPhase CDU Item Description Connection Size SV1, SV2 , SV3 , SV4, and SV5 CoolPhase CDU vent port location 5/8" (16mm) NOTE: Do not leave final stagnant pressure over 30 psig to avoid potential damage to bladder tank. System pressure can be checked using tire gauge on air port of expansion tank, located on the bottom side of the tank, if needed.
  • Page 81 7. Check the return fluid pressure data point. Pump must be able to run at 100% speed with inlet pressure no lower than 4 psi. Return fluid pressure can be checked from the Liebert® iCOM™ screen. Refer to the Vertiv™...
  • Page 82 14. If no leaks are present, drain secondary fluid circuit and clean filters at the CoolPhase CDU. 15. Run the system loop at max design flow and periodically visually check the filters in the CoolPhase CDU for contamination. Clean the filters before reintroducing them into the loop or system and continue cleaning the loop until no contamination is present.
  • Page 83 Locate the fill connection shown in Figure 7.3 on page 73 in the Vertiv™ CoolPhase CDU module. Note that each CoolPhase CDU module has its own bladder tank, so on multiple CoolPhase CDU systems you may fill at one or more points, according to the CW piping system design.
  • Page 84 Vertiv™ CoolPhase CDU Installer/User Guide This page intentionally left blank 7 Secondary Fluid Circuit Proprietary and Confidential ©2024 Vertiv Group Corp. Requirements...
  • Page 85 Before proceeding with installation, read all instructions, verify that all the parts are included, and check the nameplate to be sure the voltage matches available utility power. The Vertiv™ Liebert® iCOM™ controller does not isolate power from the unit, even in the Unit Off mode. Some internal components require and receive power even during the Unit Off mode of the Liebert®...
  • Page 86 Remote On/Off connections must be provided by the installer. • The General Alarm terminals allow remote alarm signaling. In case of short circuit, check the affected switch for sticking and replace it, if necessary. Proprietary and Confidential ©2024 Vertiv Group Corp. 8 Electrical Connections...
  • Page 87 Table 8.1 Electrical Field Connection Drawings Document Number Title 20000062 Vertiv™ Liebert® XDM Electrical Field Connections Liebert® XDM Models Liebert® CoolPhase CDU CANbus and Interlock Connections Vertiv™ Liebert® MCV + Vertiv™ Liebert® EconoPhase + Base DPN005140 Assembly DPN005241 CoolPhase CDU and Liebert® XDM Electrical Data 8.4 Wiring the Upper Section to the Bottom Module...
  • Page 88 4. Connect the uncoiled cables for pump 1 and pump 2 to their matching connectors located in the lower module. See Figure 8.3 below . Figure 8.3 Pump Cable Connections Item Description Pump cable connections Proprietary and Confidential ©2024 Vertiv Group Corp. 8 Electrical Connections...
  • Page 89 Vertiv™ CoolPhase CDU Installer/User Guide 5. Make sure to connect any transducer wire harness from the bottom module to the top module, reference the main unit electrical schematic for details. 8 Electrical Connections Proprietary and Confidential ©2024 Vertiv Group Corp.
  • Page 90 Vertiv™ CoolPhase CDU Installer/User Guide This page intentionally left blank Proprietary and Confidential ©2024 Vertiv Group Corp. 8 Electrical Connections...
  • Page 91 2. Close the main switch to apply power to the unit. NOTE: The default setting for the Vertiv™ Liebert® iCOM™ control is for standalone operation. The standalone mode lets you turn on the unit by rotating the main switch on the electrical panel. The yellow LED on the Liebert® iCOM™...
  • Page 92 For under floor piping, the CoolPhase CDU supply pipe has the highest point and can be used to help bleed air. Also install air bleeders in the under floor piping circuit to vent trapped air from long horizontal runs.
  • Page 93 Customer must provide earth ground to unit, per NEC, CEC and local codes, as applicable. Verify with a voltmeter that power is Off. The Vertiv™ Liebert® iCOM™ controller does not isolate power from the unit, even in the “Unit Off” mode. Some internal components still require and receive power even during the “Unit Off”...
  • Page 94 Worn motor bearings Replace pump. Pump is rotating in Check wiring phase. reverse. When power is restored, the Vertiv™ CoolPhase CDU Liquid to Air Cooled Chiller Loss of power automatically restarts. Pump suddenly stops Clogged strainer or Clean out the debris.
  • Page 95 Check if the dew point in the room is lower than the desired water temperature. setpoint. Supply water temperature high. Check alarm history for related alarms. Cooling system not Compressors off due to cycling at low pressure. running. Compressors off due to high discharge pressure. 10 Troubleshooting Proprietary and Confidential ©2024 Vertiv Group Corp.
  • Page 96 Vertiv™ CoolPhase CDU Installer/User Guide This page intentionally left blank Proprietary and Confidential ©2024 Vertiv Group Corp. 10 Troubleshooting...
  • Page 97 Before proceeding with installation, read all instructions, verify that all the parts are included, and check the nameplate to be sure the voltage matches available utility power. The Vertiv™ Liebert® iCOM™ controller does not isolate power from the unit, even in the Unit Off mode. Some internal components require and receive power even during the Unit Off mode of the Liebert®...
  • Page 98 Vertiv™ CoolPhase CDU Installer/User Guide • Forward the completed Vertiv™ CoolPhase CDU Warranty Inspection Check Sheet to your local sales office. This information must be completed and forwarded to validate warranty. • Contact your local sales representative or technical support if you have any questions or problems during unit start-up and commissioning.
  • Page 99 Before proceeding with installation, read all instructions, verify that all the parts are included, and check the nameplate to be sure the voltage matches available utility power. The Vertiv™ Liebert® iCOM™ controller does not isolate power from the unit, even in the Unit Off mode. Some internal components require and receive power even during the Unit Off mode of the Liebert®...
  • Page 100 Perform periodic inspections of the heat exchanger and coolant fluid piping system for leaks and visible damage. Proprietary and Confidential ©2024 Vertiv Group Corp. 12 Maintenance...
  • Page 101 12.4 Spare Parts Only original spare parts made by Vertiv must be used. Using third-party material will invalidate the warranty. When seeking technical assistance, always refer to the component list supplied with the equipment, and specify the model number, serial number and, if available, the part number.
  • Page 102 12.6.2 Replacement Compressors Compressor Electrical Failure (Motor Burnout) Replacement compressors are available through your Vertiv sales office. Do not attempt to remove the compressor without first contacting Vertiv support at 1-800-543-2778. Compressors are shipped in reusable packaging, and the original compressor should be returned in the same packaging.
  • Page 103 Before proceeding with installation, read all instructions, verify that all the parts are included, and check the nameplate to be sure the voltage matches available utility power. The Vertiv™ Liebert® iCOM™ controller does not isolate power from the unit, even in the Unit Off mode. Some internal components require and receive power even during the Unit Off mode of the Liebert®...
  • Page 104 13. Restore power to the unit and close the display door. Table 12.3 Parameter Settings Parameter Setting Value Analog output lower limit (A-LOF) 0 gpm Analog output upper limit (A-HIF) 202 gpm Table 12.4 Initial Parameter Settings CH.2 ANLG PIPE Proprietary and Confidential ©2024 Vertiv Group Corp. 12 Maintenance...
  • Page 105 Vertiv™ CoolPhase CDU Installer/User Guide Figure 12.1 Flow Sensor Item Description Flow sensor Cable connection Mounting screws Mounting bracket 12 Maintenance Proprietary and Confidential ©2024 Vertiv Group Corp.
  • Page 106 6. Be sure to gently scrub it with soft nylon brushes, while it is submerged to remove more stubborn contaminants. 7. Rinse thoroughly with clean water, then you may wish to blot, or gently blow dry. Proprietary and Confidential ©2024 Vertiv Group Corp. 12 Maintenance...
  • Page 107 4. Verify that the cap tubes are not rubbing. 5. Check/re-torque the wire connections (inside the compressor box). 6. Check the compressor operation (vibration/noise). 7. Check the crank case heater fuses (operation). 8. Check for refrigerant leaks. 13 Preventive Maintenance Checklist Proprietary and Confidential ©2024 Vertiv Group Corp.
  • Page 108 2. Check strainer to determine if it needs to be cleaned. 3. Check for leaks at all connections. Vertiv™ Liebert® MC or Vertiv™ Liebert® MCV Condenser Make sure that the coil is clean of debris (clean coil if required). 2. Verify that the fans are free of debris.
  • Page 109 Check for refrigerant leaks. 2. Check/re-torque the wire connections. 3. Check the contactors for pitting (replace if pitted). 4. Verify the pump speed control operation. 5. Check the pump mounting. 13 Preventive Maintenance Checklist Proprietary and Confidential ©2024 Vertiv Group Corp.
  • Page 110 Vertiv™ CoolPhase CDU Installer/User Guide MAINTENANCE NOTES Make photocopies for your records. Compare readings/information to previous maintenance worksheet. To locate your local Vertiv representative for Vertiv-engineered parts, check https://www.Vertiv.com/en-us/support/ or Call 1- 800-543-2778. Proprietary and Confidential ©2024 Vertiv Group Corp. 13 Preventive Maintenance Checklist...
  • Page 111 505 N. Cleveland Ave. Westerville, OH, 43082, USA Europe Via Leonardo Da Vinci 8 Zona Industriale Tognana 35028 Piove Di Sacco (PD) Italy Asia 7/F, Dah Sing Financial Centre 3108 Gloucester Road Wanchai, Hong Kong Appendices Proprietary and Confidential ©2024 Vertiv Group Corp.
  • Page 112 Vertiv™ CoolPhase CDU Installer/User Guide This page intentionally left blank Proprietary and Confidential ©2024 Vertiv Group Corp. Appendices...
  • Page 113 DPN000788 Recommended Refrigerant Line Sizes CU, OD Air Cooled Systems Using R-410A Electrical Field Connections 20000182 CoolPhase CDU CANbus and Interlock Connections Liebert® MCV + Liebert® EconoPhase + Base Assembly DPN005241 CoolPhase CDU and Liebert® XDM Electrical Data 20000062 CoolPhase CDU Electrical Field Connections Liebert®...
  • Page 114 Vertiv™ CoolPhase CDU Installer/User Guide This page intentionally left blank Proprietary and Confidential ©2024 Vertiv Group Corp.
  • Page 115 COOLPHASE CDU COMPONENT LOCATION DIAGRAM XDM300 1. Compressors (Typical 4) 2. Electric Panel 3. Pump (Typical 2) 4. Heat Exchanger 5. Flowmeter 6. Leak Detection 7. Electronic Expansion Valves (Typical 2) 8. Variable Frequency Drive 9. Fluid Fill Connection 10. Liebert® iCOM™...
  • Page 116 COOLPHASE CDU CABINET & ANCHOR DIMENSIONAL DATA XDM300 XDM300 FULLY ASSEMBLED SERVICE CLEARANCE SERVICE CLEARANCE [1067] [914] 37.5 82.3 [2089] [953] [610] 125.3 125.3 [3182] [3182] Notes: 1. All dimensions are in inches [mm]. 20000058 REV: B PAGE: 1 OF 4...
  • Page 117 COOLPHASE CDU CABINET & ANCHOR DIMENSIONAL DATA XDM300 LOWER MODULE 17.2 17.2 23.1 [436] [436] [587] TOP VIEW [123] 88.0 88.0 [2235] [2235] RIGHT SIDE FRONT VIEW VIEW Notes: 1. All dimensions are in inches [mm]. 20000058 REV: B PAGE: 2 OF 4...
  • Page 118 COOLPHASE CDU CABINET & ANCHOR DIMENSIONAL DATA XDM300 UPPER MODULE 79.4 [2017.9] (LIFT POINT) 14.5 [368] (Lift point) SERVICE CLEARANCE 81.2 [2063] TOP VIEW 36.8 [934] FRONT VIEW SIDE VIEW Panels removed for clarity to show Secondary Circuit shut off valves 11.0...
  • Page 119 COOLPHASE CDU CABINET & ANCHOR DIMENSIONAL DATA XDM300 FRONT OF UNIT BRACKET Notes: 1. Orient the bracket as shown 2. Drill a qty 2 (7/32 inch (0.218 mm)) holes into the XDM Frame 3. Install two (2) 1/4-20 self drilling screws into the XDM Frame. (Typical 8 Places) 4.
  • Page 120 LIEBERT® HEAT REJECTION SKID CABINET & ANCHOR DIMENSIONAL DATA LIEBERT® MCV430 + LIEBERT® ECONOPHASE + BASE ASSEMBLY Shaded are indicates recommended 36" (914mm) clearance for component access. Main Electrical 101 1/4" 2572mm 132" 3353mm 123 1/2" 3138mm Domestic Shipping Weight Export Shipping Weight lb.
  • Page 121 LIEBERT® HEAT REJECTION SKID CABINET & ANCHOR DIMENSIONAL DATA LIEBERT® MCV430 + LIEBERT® ECONOPHASE + BASE ASSEMBLY 20" 508mm 3/4" 19mm (8) Weep Holes 1 5/8" 13" Ref. 42mm 330mm 13" 330mm 1" 20" 25mm 508mm (8) Mounting Holes (Contact Points) 1 5/8"...
  • Page 122 LIEBERT® HEAT REJECTION SKID CABINET & ANCHOR DIMENSIONAL DATA LIEBERT® MCV430 (2) + LIEBERT® ECONOPHASE (2) + BASE ASSEMBLY Shaded area indicates recommended clearance of 36" (914mm) for component access. System 1 System 2 Main Electrical 101 1/4" 2572mm Shaded area indicates recommended clearance of 36"...
  • Page 123 LIEBERT® HEAT REJECTION SKID CABINET & ANCHOR DIMENSIONAL DATA LIEBERT® MCV430 (2) + LIEBERT® ECONOPHASE (2) + BASE ASSEMBLY 20" 508mm 13" 3/4" 331mm 19mm 1 5/8" (4) Weep Holes 42mm Ref. 13" 330mm 20" 7/8" 508mm 22mm (8) Mounting Holes (Contact Points) 1 5/8"...
  • Page 124 LIEBERT HEAT REJECTION SKID ® CABINET LIFTING POINTS LIEBERT® MCV430 + LIEBERT® ECONOPHASE + BASE ASSEMBLY Front of Unit 101" 131 3/8" 2565mm 3335mm 13 7/8" 351mm TYP. 4" X 7" (102mm X 178mm) Lifting Points TYP. (4) Places Notes: 1.
  • Page 125 LIEBERT HEAT REJECTION SKID ® CABINET LIFTING POINTS LIEBERT® MCV430 (2) + LIEBERT® ECONOPHASE (2) + BASE ASSEMBLY 27 3/4" 705mm TYP. 106 1/4" 2699mm Front of Unit TYP. 101" 2565mm 4" X 7" 13 7/8" (102mm X 178mm) 351mm Lifting Points TYP.
  • Page 126 COOLPHASE CDU FLOORSTAND & ANCHOR DIMENSIONAL DATA XDM300 15-3/16 118-3/4 [386] [3016] 21-3/16 [538] 42-7/8 35-7/8 [966] [1089] [911] 119-3/4 22-3/16 [3042] [564] [16] 3 Sq [76.20] 17-11/16 11-7/16 [449] [290] 1-3/4 [44] 38-1/2 43-7/8 32-7/8 [978] [1114] [835] Notes: Height in (mm) 1.
  • Page 127 COOLPHASE CDU FLOORSTAND & ANCHOR DIMENSIONAL DATA XDM300 FRONT OF UNIT BRACKET Note 1. Orient the bracket as shown. 2. Drill a qty 6 (7/32 inch (0.219 mm)) holes into the Floorstand and XDM Frame. 3. Install six (6) 1/4-20 self drilling screws into the Floorstand and XDM Frame.
  • Page 128 For applications when the outdoor winter design temperature is below -18°F (-27°C), use a percentage of glycol per the appropriate table below or contact your Vertiv Sales Representative and Application Engineer. The percent glycol solution values listed below in Tables 1 and 2 are for reference and are based on burst protection of the Brazed Plate Heat Exchanger (BPHE) at various outdoor winter design temperatures.
  • Page 129 Any residual contaminants could adversely affect the heat-transfer stability and performance of your system. In most cases, special cleaners are needed to remove scale, rust, and hydrocarbon foulants form pipes, manifolds, and passages. For more information on cleaners and degreasers, contact your Vertiv representative. Follow the manufacturer’s instructions when using these products.
  • Page 130 1/2" per 10 feet (42mm per 10m) so that gravity will aid in moving oil in the direction of the refrigeration flow. 8. Vertiv requires the installation of external refrigerant isolation valves on both the liquid line entering and the hot gas line leaving the indoor unit. These external isolation valves are necessary to facilitate safe recovery of the refrigerant charge from the indoor unit before servicing the compressors, filter driers, or other refrigeration components.
  • Page 131 Notes: 1. Field to install strainer in field secondary (XDM ) return line to Cooling Modules . Vertiv recommends a bypass piping arrangement to allow for cleaning the strainer without disrupting unit operation. Also pressure taps across the strainer to check pressure drop. Four full port ball valves , pressure taps and and piping are supplied by the field.
  • Page 132 COOLPHASE CDU AIR COOLED PIPING SCHEMATIC LIEBERT® MCV WITHOUT RECEIVER MOUNTED ABOVE XDM300 CIRCUIT 1 CIRCUIT 2 Notes: 1. Single refrigerant circuit shown for clarity, for XDM300 units refrigerant connections are typical. 2. The bottom of the condenser coil must be less than 60' (18.3m) above the elevation of the EEVs inside the indoor unit.
  • Page 133 COOLPHASE CDU AIR COOLED PIPING SCHEMATIC LIEBERT® MCV WITHOUT RECEIVER MOUNTED BELOW XDM300 Hot Gas Discharge Liquid Return Hot Gas Discharge XDM300 CIRCUIT 1 CIRCUIT 2 15' (4.6m) Internal EEV Maximum Vertical Height Rise XDM300 Liebert® MCV Condenser Unit Liquid Return Liebert®...
  • Page 134 COOLPHASE CDU PRIMARY CONNECTION LOCATIONS XDM300 XDM300 FULLY ASSEMBLED HR HV HR LV XDM300 TOP VIEW POINT DESCRIPTION X in. (mm) Y in. (mm) Connection Size Opening Liquid Line System1 Refrigerant Connection 5.9 (149) 1-3/8" (35mm) O.D. Cu Liquid Line System2 Refrigerant Connection 9.1 (232)
  • Page 135 COOLPHASE CDU PRIMARY CONNECTION LOCATIONS XDM300 CWD1 CWD2 BOTTOM VIEW POINT DESCRIPTION X in. (mm) Y in. (mm) Z in. (mm) Connection Size CWD1 Suction Chilled Water Drain 20.4 (518) 8.8 (223) 4.2 (106) 5/8" (16mm) CWD2 Discharge Chilled Water Drain 21.1 (535)
  • Page 136 COOLPHASE CDU PRIMARY CONNECTION LOCATIONS XDM300 26.8 [681] 15.7 [400] [237] 19.5 16.6 13.7 [495] [422] [347] 76.6 12.9 [1945] [328] 15.1 [384] 38.1 20.3 [516] [968] BOTTOM VIEW 22.7 [577] FRONT VIEW POINT DESCRIPTION X in. (mm) Y in. (mm) Z in.
  • Page 137 LIEBERT HEAT REJECTION SKID ® PRIMARY CONNECTION LOCATIONS LIEBERT® MCV MCV430 + LIEBERT® ECONOPHASE + BASE ASSEMBLY Circuit 1 Circuit 2 123 1/2" 3138mm 64 1/4" 1632mm 34" 864mm 25 3/4" 655mm Bottom of Box Bottom of Box 54 3/4" 1390mm Center of Box 87 1/2"...
  • Page 138 LIEBERT HEAT REJECTION SKID ® PRIMARY CONNECTION LOCATIONS LIEBERT® MCV MCV430 + LIEBERT® ECONOPHASE + BASE ASSEMBLY Left side of Unit 72 3/4" 1847mm Front Rear of Unit of Unit 19 1/2" 497mm 15 5/8" 45 3/8" 398mm 1153mm Right side of Unit Top View Multiple customer connection locations Circuit 2...
  • Page 139 LIEBERT HEAT REJECTION SKID ® PRIMARY CONNECTION LOCATIONS LIEBERT® MCV430 (2) + LIEBERT® ECONOPHASE (2) + BASE ASSEMBLY SYSTEM 1 CIRCUIT 2 SYSTEM 1 CIRCUIT 1 123 1/2" 3138mm 64 1/4" 1632mm 34" 864mm Bottom of Box 27 3/8" 25 3/4" 696mm 655mm Bottom of Box...
  • Page 140 LIEBERT HEAT REJECTION SKID ® PRIMARY CONNECTION LOCATIONS LIEBERT® MCV430 (2) + LIEBERT® ECONOPHASE (2) + BASE ASSEMBLY Left side of Unit Main Electrical System 1 Panel Circuit 1 72 3/4" 1847mm Rear Front of Unit of Unit Main System 2 Electrical Panel Circuit 2...
  • Page 141 COOLPHASE CDU AIR COOLED PIPING SCHEMATIC LIEBERT® MCV WITHOUT RECEIVER MOUNTED ABOVE XDM300 CIRCUIT 1 CIRCUIT 2 Notes: 1. Single refrigerant circuit shown for clarity, for XDM300 units refrigerant connections are typical. 2. The bottom of the condenser coil must be less than 60' (18.3m) above the elevation of the EEVs inside the indoor unit.
  • Page 142 COOLPHASE CDU AIR COOLED PIPING SCHEMATIC LIEBERT® MCV WITHOUT RECEIVER MOUNTED BELOW XDM300 Hot Gas Discharge Liquid Return Hot Gas Discharge XDM300 CIRCUIT 1 CIRCUIT 2 15' (4.6m) Internal EEV Maximum Vertical Height Rise XDM300 Liebert® MCV Condenser Unit Liquid Return Liebert®...
  • Page 143 3. Consult factory when actual pipe length between Liebert® MC/Liebert® EconoPhase and Liebert® DSE unit will exceed 300 ft (91 m). 4. Liebert® DSE DA250-265 and Vertiv® CoolPhase CDU XDM300 units can be extended to max 200ft (61m) linear or 300ft. (91m) equivalent.
  • Page 144 LINE SIZE & PRESSURE RATINGS RECOMMENDED REFRIGERANT LINE SIZES CU, OD AIR-COOLED SYSTEMS USING R-407C 4-Step Semi-Hermetic System Fluid : R-407C Standard Scroll Models (Non-Digital Scroll) Product or Digital Scroll Models Indoor Model Equivalent Length 50 ft (15m) 100 ft (30m) 150 ft (45m) 200 ft (60m) 50 ft (15m) 100 ft (30m) 150 ft (45 m) Hot Gas Line, in.
  • Page 145 LINE SIZE & PRESSURE RATINGS RECOMMENDED REFRIGERANT LINE SIZES CU, OD AIR-COOLED SYSTEMS USING R-454B System Fluid : R-454B Any Compressor Type PRODUCT Indoor Model Equivalent Length 50 ft (15m) 100 ft (30m) 150 ft (45m) 300 ft (91m) 450ft (137m) Hot Gas Line, in.
  • Page 146 High Pressure Cutout Design Pressure 530 (3655) 235 (1620) Liebert® DSE (DP060, DP400, DP500) High Pressure Cutout 580 (3999) Vertiv ™ CoolPhase CDU & Liebert® Design Pressure 530 (3655) 235 (1620) High Pressure Cutout 580 (3999) Design Pressure 364 (2510) 163 (1124) Liebert®...
  • Page 147 COOLPHASE CDU CANbus & INTERLOCK CONNECTIONS LIEBERT® MCV + LIEBERT® ECONOPHASE + BASE ASSEMBLY ECONOPHASE CONTROL BOARDS (FACTORY SET) CIRCUIT 1 CIRCUIT 2 CANBUS ADDRESSING DIPSWITCH LIEBERT® ECONOPHASE UNIT CONDENSER CONTROL BOARDS (FACTORY SET) CANBUS COMMUNICATION CABLE CIRCUIT 1 LIEBERT® MCV CONDENSER...
  • Page 148 COOLPHASE CDU CANbus & INTERLOCK CONNECTIONS LIEBERT® MCV + LIEBERT® ECONOPHASE + BASE ASSEMBLY COMPONENT NOTES: 1. COMPONENT APPEARANCE, ORIENTATION, AND POSITION MAY VARY BETWEEN PRODUCT LINES. TERMINAL NAMES REMAIN CONSTANT. 2. ALL CIRCUITS TO THESE CONNECTION POINTS REMAIN CONSTANT.
  • Page 149 COOLPHASE CDU & LIEBERT® XDM ELECTRICAL DATA Single Disconnect Single Disconnect Unit Voltage Rating XDM200 Unit Voltage Rating XDM300 91.8 130.2 460V/60Hz 460V/60Hz 97.0 136.9 7.5HP 10 HP 88.7 141.6 460V/60Hz 460V/60Hz 93.9 148.3 5.0HP 15 HP FLA = Full Load Amps; WSA = Wire Size Amps; OPD = Maximum Overcurrent Protection Device Note: The XDM400 consists of two separate XDM200 electrical feeds.
  • Page 150 COOLPHASE CDU ELECTRICAL FIELD CONNECTIONS XDM300 STANDARD ELECTRICAL CONNECTIONS 1) High voltage entrance - Located in bottom and top of box (quantity 3) 2) Low voltage entrance - Located in bottom and top of box (quantity 4) 3) Three phase electrical service - Terminals are on top of disconnect switch. Three phase service not provided by Liebert®.
  • Page 151 COOLPHASE CDU ELECTRICAL FIELD CONNECTIONS XDM300 OPTIONAL ELECTRICAL CONNECTIONS 12) Reverse Starter contacts - Normally open dry contact is closed across terminals 102 & 103 for power supply 1 and 106 & 107 for power supply 2 to indicate the active power feed. 1 AMP, 24VAC max load.
  • Page 152 COOLPHASE CDU ELECTRICAL FIELD CONNECTIONS XDM300 DETAIL A 20000062 REV: B PAGE: 3 OF 3 REV DATE: 08/2024...
  • Page 153 LIEBERT® iCOM™ PRODUCT INFORMATION UNIT MOUNTED DISPLAY The Liebert® iCOM™ display is a 7-inch capacitive, color-touchscreen display in an ergonomic, aesthetically pleasing housing. The display and housing will be viewable while the unit accent panels are open or closed. The display can be easily detached to view while the panel is open. Menu Layout- The menus will be broken out into two main menu screens: User screen and Service screen.
  • Page 154 LIEBERT® iCOM™ PRODUCT INFORMATION UNIT MOUNTED DISPLAY Context Sensitive Help- The display will have an onboard help database. The database will provide context sensitive help to assist with setup and navigation of the menus. Display Setup- The user has the ability to configure the display information based on the specific user’s preference. Language, units of measure, screen contrast, home screen layout, back light timer and the hide/show of certain readouts will be configurable through the display.
  • Page 155 LIEBERT® iCOM™ PRODUCT INFORMATION UNIT MOUNTED DISPLAY Options Setup- The menus shall provide operation settings for the installed components. Auto Restart- The unit will return to its previous operating status after loss of power. Units can be stagger started to minimize system current draw.
  • Page 156 Vertiv™ CoolPhase CDU Installer/User Guide...
  • Page 157 Vertiv.com | Vertiv Headquarters, 505 N. Cleveland Ave., Westerville, OH 43082, USA © 2024 Vertiv Group Corp. All rights reserved. Vertiv™ and the Vertiv logo are trademarks or registered trademarks of Vertiv Group Corp. All other names and logos referred to are trade names, trademarks or registered trademarks of their respective owners. While every precaution has been taken to ensure accuracy and completeness here, Vertiv Group Corp.
Save PDF