Surefire Software -
http://www.surefiresoftware.co.uk/index.php
Fig. 6
1. A flat vertical area is required for the installation of the boiler.
2. These dimensions include the necessary clearances around the boiler for case removal, spanner access and air movement. Additional
clearances may be required for the passage of pipes around local obstructions such as joists running parallel to the front face of the boiler.
page 14
7.3 Ventilation of Compartments
1. Where the appliance is installed in a cupboard or compartment, no air vents are required. The appliance will run sufficiently cool without
ventilation.
7.4 Gas Supply
1. The gas installation should be in accordance with the relevant standards. In IE this is the current edition of I.S. 813 "Domestic Gas
Installations".
2. The connection to the appliance is a 3/4" copper tail located at the rear of the gas service cock
(Fig.
7).
Need help?
Do you have a question about the Megaflo System HE IE Series and is the answer not in the manual?