Download Print this page

KYOWA BS-25AT Instruction Manual

Strain transducer

Advertisement

Quick Links

BS-25AT/25BT Strain Transducer INSTRUCTION MANUAL
Thank you for purchasing the KYOWA product. Before using it,
please read this instruction manual carefully. Also, keep the manual
within easy reach so that you can refer to it whenever necessary.
1. Installation
1.1 Embedment in concrete
 Determine the position of installation of the strain transducer by
measuring the distance from the reference point.
 As sketched in the above illustration, place steel wires or joint
bars across the assembled reinforcing steel bars, and tentatively
fix the strain transducer in positon.
(Tie a rubber plate, etc. around the steel wires or joint bars at the
connection with the strain transducer to avoid direct contact of the
strain transducer.)
 Connect the strain transducer to the indicator and so adjust that
the indicator approximately (±50µm/m or less) reads the initial
unbalance value stated in the calibration sheet. After this, fix the
steel wires or the joint bars.
 Connect the extension cable, already distributed, with the strain
transducer's input/output cable, using the cable connection kit.
 Connect the strain transducer to the indicator and measure the
initial unbalance value. Also, connect the strain transducer to the
tester and measure the insulation resistance value.
 Place concrete little by little, talking care to avoid damage to the
strain transducer and cable.
 After placing concrete has been completed, connect the strain
transducer to the indicator and measure the insulation resistance
value.
IM-T-210D    September, 2016
1.2 Embedment using a strain transducer spider
 Fix the spider to the bottom of embedment hole, using reinforcing
steel bar or bolt. At this time, check the installing direction of the
strain transducer.
 Set the strain transducer to the spider. (Preliminarily twist the
cable in the opposite direction so that the cable will be free from
twisting after setting.)
 Dig a hole whose diameter (or side) is from 1 to 1.5m and depth
is about 70cm.
 Using a level, correctly align the stress transducer, which was
installed to the spider, with the prescribed direction.
 Cover the group of strain transducers with concrete, from witch
large aggregates were removed, in a manner to from a
hemispherical concrete pile. When doing this, always check to be
sure that the strain transducer keeps the correct direction.
 Over this pile, place concrete of the same composition as mass
concrete in a gentle manner. When applying a vibrator, carefully
keep the strain transducer from moving.
 Put up a flag to mark the position of the strain transducer for later
convenience.
2. Handling Precautions
2.1 Check that the transducer's manufacturing number agrees with
the test data sheet.
2.2 Check that the transducer's insulation resistance value. (It
should be 100M  /50VDC or higher). Be sure to use a bridge
voltage below 50VDC.
2.3 Using the tester, check that the transducer's input / output
resistance are as follows.
Input resistance (between red and black wires): approx. 350
Output resistance (between white and green wires):
approx.450
2.4 Avoid hitting or the other shocks on the transducer, or
disconnection or damage may occur. If shocks should be given
to the transducer, its performance stability may be adversely
affected in long-term continuous operation.
2.5 For transit, keep the transducer's in its case. If it is carried by
holding the cable only, the cable may be damaged to cause
disconnection and / or deterioration of the insulation resistance.
Measurement may thus become impossible.
2.6 Do not disassemble the transducer.
2.7 Be sure to put the accessory cable cap on the end of the cable,
and to avoid water on the conductors.
2.8 Avoid twisting and bending on the transducer, or it may damage.

Advertisement

loading
Need help?

Need help?

Do you have a question about the BS-25AT and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for KYOWA BS-25AT

  • Page 1 IM-T-210D    September, 2016 BS-25AT/25BT Strain Transducer INSTRUCTION MANUAL Thank you for purchasing the KYOWA product. Before using it, 1.2 Embedment using a strain transducer spider please read this instruction manual carefully. Also, keep the manual within easy reach so that you can refer to it whenever necessary.
  • Page 2 Δt. found, the cause may be failure of the sensing element. In this Strain value( m/m) = [(Strain amplifier’s output :ε( m/m)] case, contact your KYOWA representative for necessary ×(Calibration constant: ×10 /1 m/m)-(b×Δt ) inspection and repair.
  • Page 3 IM-T-210D  2016.9  BS−25AT/25BT型  ひずみ計  取扱説明書 このたびは本製品をお買い上げいただきまして、ありがとう 1.2  スパイダを用いて埋設する場合  ございます。ご使用の前には、本書を必ずお読みください。  また、お読みになったあとはいつでも見られるところに必ず 保管してください。  1. 取り付け  1.1 コンクリート内に埋設する場合  なまし鉄線(#21) ひずみ計 ●  スパイダを埋設孔底部に、鉄筋あるいはボルトで固定しま す。この時、ひずみ計取付け方向を確認してください。  ●  ひずみ計にスパイダをセットします。 (予め、ケーブルを逆 なまし鉄線 方向にねじっておけば、セットの後にケーブルのねじれが (#10)  残りません。 )  ●  埋設位置に直径(または一辺)1〜1.5m、深さ 70cm 位の穴 さし筋 約 350 を作ってください。  (D10) 平面図  ●  スパイダに取り付けたひずみ計は、所定の方向に水準器を 用い、正しく設置してください。  ● ...
  • Page 4                           コードキャップ      1個  4.4 コンクリート埋設の場合に、 ひずみ計とコンクリートの線 7. 保管上の注意および点検 膨張係数が一致していないと温度変化によるひずみの発 生がひずみ計測に生ずるので、補正が必要となります。  7.1 ケーブル端末には水、ゴミ、油などがつかないようにして 温度の補正式は、温度補正係数をb、変化温度をΔtと ください。  すれば、  7.2 初期値、指示値が異常と思われる場合は、入力抵抗、出力 求めるひずみ=[ひずみ測定器の出力ε(×10 )]  抵抗、絶縁抵抗(100MΩ以上)を測定してください。測定値 -6  -6  ×[校正係数 (×10 /1×10 )]-(b×Δt)  に異常があれば本器の故障と考えられますので、 弊社の営 で表わされます。  業までご連絡ください。  ここに  b=βc−βs  βc:コンクリートの線膨張係数  注意:絶縁抵抗を測定する場合には、絶縁抵抗計の印加電圧 βs:ひずみ計の線膨張係数  は 50V 以下で行ってください。  (検査成績書  表示値)  ホームページアドレス  http://www.kyowa-ei.com/...

This manual is also suitable for:

Bs-25bt