Download Print this page

Assembly Or Installation Instructions - Project Source EVALIN TL-7650E-WL-PS Manual

Advertisement

Available languages

Available languages

ASSEMBLY INSTRUCTIONS
1. Install new floor bolts into floor flange. You can pre-cut
the floor bolts to the desired length to put on the bolt cap
by doing the following: Temporarily install floor bolts and
set the toilet and place the washers and nuts onto the
bolts. Then mark the length needed. Take toilet out of the
place and remove the floor bolts. Cut the floor bolts to the
length and then turn the toilet upside down onto a soft
surface to avoid scratches on the finish.
Hardware Used
JJ
Floor Bolts Kit
2. Place a new wax ring around the waste flange of toilet
bowl.
Hardware Used
LL
Sealing Ring/Wax Ring
3. Lower the toilet onto the floor bolts, so the bolts project
through mounting holes in base of toilet. Using a rocking
motion, press the bowl down to position the toilet onto the
flange.
x 2
FIG 2
FIG 2
x 1
FIG 3
FIG 3
FIG 4
FIG 4
6
1
2
3

Advertisement

loading
Need help?

Need help?

Do you have a question about the EVALIN TL-7650E-WL-PS and is the answer not in the manual?

Questions and answers

Related Products for Project Source EVALIN TL-7650E-WL-PS

This manual is also suitable for:

090102278195088