Check entire box and inside all packing materials for parts. Before beginning assembly, read the
instructions and identify parts using the figures and parts listed in this document. It is critical that all
parts be carefully inspected by the installer prior to installation to ensure that no damage occurred in
transit and that a damaged part is not used. If any damage occurred in transit, Aqua Creek Products,
LLC must be notified within three days of receipt of unit. Proper installation cannot be overstressed, as
an improper installation voids Aqua Creek's warranty and may affect the safety of the user.
9889 GARRYMORE LANE
MISSOULA, MT 59808
1-888-687-3552
FAX: 406-549-2602
1.
READ AND FOLLOW ALL INSTRUCTIONS. LIFT SAFETY CAN ONLY BE ENSURED IF THE LIFT
IS INSTALLED AND OPERATED PROPERLY – AS PER THESE INSTRUCTIONS.
2.
WARNING- TO REDUCE RISK OF INJURY, DO NOT PERMIT CHILDREN TO USE THIS
PRODUCT UNLESS THEY ARE CLOSELY SUPERVISED AT ALL TIMES.
3.
WARNING- DO NOT PERMIT CHILDREN TO PLAY ON THIS PRODUCT.
4.
WARNING- NEVER APPLY DIRECT WATER PRESSURE TO ELECTRONIC COMPONENTS.
5.
DO NOT USE THE PRO POOL LIFT FOR WATER-DRAFTS OVER 12" (DECK TO WATERLINE).
6.
NEVER OPERATE THIS LIFT UNDER LOAD WITH NO WATER (DRY POOL).
7.
WARNING – FOR SAFETY REASONS NEVER SWIM ALONE.
8.
SAVE A COPY OF THESE INSTRUCTIONS.
AQUA CREEK, LLC 2016
PART #: F-910SAJP-8
350 LB. [159 kg] MAXIMUM CAPACITY
- READ CAREFULLY-
WARNING
IMPORTANT SAFETY INSTRUCTIONS
12/13/16

Advertisement

loading
Need help?

Need help?

Do you have a question about the F-910SAJP-8 and is the answer not in the manual?

Questions and answers

Summary of Contents for Aqua Creek Products F-910SAJP-8

  • Page 1 If any damage occurred in transit, Aqua Creek Products, LLC must be notified within three days of receipt of unit. Proper installation cannot be overstressed, as an improper installation voids Aqua Creek’s warranty and may affect the safety of the user.
  • Page 2 AMBASSADOR 8” ANCHOR JIG ASSEMBLY The Ambassador 8” Anchor-Jig Assembly is shown below with all of the parts labeled. Before beginning installation familiarize yourself with the parts and their locations. Also review the information on page 3 “ADA GUIDELINES” before choosing the anchor location.
  • Page 3 INSTALLATION: ADA GUIDELINES ADA REQUIREMENTS: The AMBASSADOR is designed and manufactured to be 100% ADA compliant. But for the installed lift to be 100% compliant the installation must meet the requirement for CLEAR DECK SPACE as shown in the diagram to the left. To be compliant, install the lift at 22-1/2 inches [572mm] minimum from the pool edge, and make sure the deck has the required CLEAR DECK SPACE as shown.
  • Page 4: Anchor Installation: Core-Drill Retro-Fit

    ANCHOR INSTALLATION: CORE-DRILL RETRO-FIT Required Materials & Tools: Core drill and 1-1/2” core drill bit Tape Measure Marking Pen suitable for writing on concrete Hammer Cold Chisel Torpedo Level High Strength 2 part construction epoxy* Black electrical tape (Optional) Masking tape *Aqua Creek recommends Hilti™...
  • Page 5 Allow for a way to bond at least one of the anchor inserts according to your local code requirements. This is typically accomplished with 8-AWG solid-copper wire attached to the pool’s bonding grid. For more information see NEC Article 680.26. Before putting epoxy into the holes and setting the anchor inserts, you will want to test fit the anchor inserts in the pre-drilled holes first to make sure they line up properly.
  • Page 6: Anchor Installation: Saw-Cut Retro-Fit

    ANCHOR INSTALLATION: SAW-CUT RETRO-FIT Cold Chisel Required Materials & Tools: Torpedo Level Concrete saw with Diamond blade Sting line Tape Measure Concrete & Concrete tools 4’ long Straight edge or chalk line #5 Rebar Sledge Hammer 1) Locate the anchor plate, three (3) anchor inserts with nuts and mounting hardware.
  • Page 7: Anchor Installation: New Construction

    ANCHOR INSTALLATION: NEW CONSTRUCTION For installations where a new deck is being poured, or where a dedicated pad is being poured just for the pool lift, the concrete must satisfy the following requirements. YOUR POOL DECK MUST BE AT LEAST 4’-3” LONG BY 4’-3” WIDE BY 6-INCHES THICK.