Download Print this page

Fröling SP Dual compact Installation Instructions Manual page 3

Dual fuel boiler
Hide thumbs Also See for SP Dual compact:

Advertisement

6.3 Assembly overview S1 Turbo F (ESP).................................................................................................. 34
6.4 Assembly overview pellet unit ............................................................................................................... 36
6.5 Before Installation ................................................................................................................................. 37
6.5.1
Changing door stops (as needed)............................................................................................ 37
6.5.2
Checking the seal on the doors ............................................................................................... 39
6.5.3
Adjusting the doors .................................................................................................................. 40
6.5.4
Preparing the hydraulic connection.......................................................................................... 41
6.5.5
Positioning the boiler on the boiler base frame (optional)........................................................ 42
6.5.6
Changing over the flue gas pipe connection to the top............................................................ 42
6.6 Retrofit accessories............................................................................................................................... 43
6.6.1
Automatic WOS ....................................................................................................................... 43
6.6.2
Electrostatic particle separator (ESP) ...................................................................................... 45
6.7 Install firewood boiler ............................................................................................................................ 48
6.7.1
Installing the cladding .............................................................................................................. 48
6.7.2
Fitting the air control ................................................................................................................ 53
6.7.3
Installing the WOS lever .......................................................................................................... 54
6.7.4
Installing the insulated door ..................................................................................................... 54
6.7.5
Fitting the controller box........................................................................................................... 56
6.7.6
Installing the Lambda probe, sensor and thermal discharge valve.......................................... 57
6.8 Fitting the pellet unit .............................................................................................................................. 59
6.8.1
Screw the pellet unit to the firewood boiler .............................................................................. 59
6.8.2
Fitting the air connection.......................................................................................................... 63
6.8.3
Fitting the cladding to the pellet unit ........................................................................................ 63
6.9 Connecting the discharge system ......................................................................................................... 65
6.9.1
Installing the external suction module...................................................................................... 65
6.9.2
Connecting the hose lines........................................................................................................ 67
6.9.3
Assembly information for hose lines ........................................................................................ 68
6.10 Electrical connection ............................................................................................................................. 70
6.10.1 Board overview ........................................................................................................................ 71
6.10.2 Connect the firewood boiler components................................................................................. 72
6.10.3 Connect the components of the pellet unit............................................................................... 73
6.10.4 Potential equalisation............................................................................................................... 76
6.10.5 Mains connection ..................................................................................................................... 77
6.11 Hydraulic connection............................................................................................................................. 77
6.12 Final installation steps........................................................................................................................... 79
6.12.1 Positioning the boiler stickers .................................................................................................. 81
6.12.2 Affixing the identification plate ................................................................................................. 81
6.12.3 Insulate the connection line ..................................................................................................... 82
6.12.4 Install the brackets for accessories.......................................................................................... 82
7 Start-up......................................................................................................................................................... 83
7.1 Before commissioning / configuring the boiler ...................................................................................... 83
7.2 Initial startup.......................................................................................................................................... 84
7.2.1
Permitted fuels ......................................................................................................................... 84
7.2.2
Fuels permitted under certain conditions ................................................................................. 85
7.2.3
Non-permitted fuels.................................................................................................................. 86
7.2.4
Heating up for the first time...................................................................................................... 86
8 Decommissioning ....................................................................................................................................... 87
8.1 Mothballing............................................................................................................................................ 87
8.2 Disassembly.......................................................................................................................................... 87
8.3 Disposal ................................................................................................................................................ 87
9 Appendix ...................................................................................................................................................... 88
9.1 Pressure equipment regulation ............................................................................................................. 88
M1821324_en | Installation instructions Dual fuel boiler SP Dual compact (ESP)
Contents
iii

Advertisement

loading
Need help?

Need help?

Do you have a question about the SP Dual compact and is the answer not in the manual?

This manual is also suitable for:

Sp dual compact 15Sp dual compact 20