Download Print this page

Connection Line To The Chimney - Fröling SP Dual compact Installation Instructions Manual

Dual fuel boiler
Hide thumbs Also See for SP Dual compact:

Advertisement

3.4.1 Connection line to the chimney

M1821324_en | Installation instructions Dual fuel boiler SP Dual compact (ESP)
Requirements for the connection line:
▪ this should be as short as possible and follow an upward incline to the chimney (30 -
45° recommended)
▪ thermally insulated
1)
MFeuV
(Germany)
400
2
[mm]
1. Observe the fire regulations of the respective federal state
2. Component made of flammable material
3. Nonflammable insulating material
4. Radiation shield with rear ventilation
Minimum distance from flammable substances as per MFeuV
▪ 400 mm excluding thermal insulation
▪ 100 mm if at least 20 mm thermal insulation is installed
Minimum distance from flammable materials as per EN 15287-1 and EN 15287-2:
▪ 3 x nominal diameter of connection line, but at least 375 mm (NM)
▪ 1.5 x nominal diameter of connection line for radiation shield with rear ventilation, but
at least 200 mm (NM)
NOTICE! The minimum distances must be observed in accordance with the
standards and guidelines applicable in the region
D
100
3
20
[mm]
Design Information | 3
EN 15287-1 and EN 15287-2
3 x D
(min. 375)
4
1,5 x D
2
(min. 200)
1)
(Germany):
D
11

Advertisement

loading
Need help?

Need help?

Do you have a question about the SP Dual compact and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Sp dual compact 15Sp dual compact 20