Setup Safety
This machine presents
serious injury hazards
to untrained users. Read
through this entire manu-
al to become familiar with
the controls and opera-
tions before starting the
machine!
Wear safety glasses dur-
ing the entire setup pro-
cess!
Your milling machine is
very heavy. Serious per-
sonal injury may occur
if safe moving methods
are not used. To be safe,
get assistance and use a
forklift to move the ship-
ping crate and remove
the machine from the
crate.
-20-
SECTION 3: SETUP
Items Needed for
Setup
The following items are needed to complete the
setup process, but are not included with your
machine:
Description
•
Level (3' or longer) ..................................... 1
•
Wrench 22mm ............................................ 1
•
Wrench 24mm ............................................ 1
•
Assistants ................................................... 2
•
Safety Glasses (for each person) .............. 1
•
Forklift (3000 lb. rating) .............................. 1
•
Safety Lifting Hook (3000 lb. rating) ........... 1
•
Lifting Webbing (3000 lb. rating) ................ 1
•
Solvent & Rags (for cleaning) .... As Needed
•
Mounting Hardware .................... As Needed
•
Lubricant ..................................... As Needed
Unpacking
Read and understand all of the instructions con-
tained in this SETUP section before moving the
mill from the crate.
Your machine was carefully packaged for safe
transportation. Remove the packaging materials
from around your machine and inspect it. If you
discover the machine is damaged, please imme-
diately call Customer Service at (570) 546-9663
for advice.
Save the containers and all packing materials for
possible inspection by the carrier or its agent.
Otherwise, filing a freight claim can be difficult.
When you are completely satisfied with the condi-
tion of your shipment, inventory the contents.
Model G9901/G9902/G9903 Milling Machine
Qty