Suggested Tool Requirements - Friedrich CP10E10 Installating And Operation Manual

Cp line 115 volts
Hide thumbs Also See for CP10E10:
Table of Contents

Advertisement

Available languages

Available languages

Suggested Tool Requirements

SCREWDRIVER(+, -), RULER, KNIFE, HAMMER, PENCIL, LEVEL
PREPARATION OF CHASSIS
1. Remove the screws which fasten the cabinet
at both sides and at the back.
2. Slide the unit out from the cabinet by gripping
the base pan handle and pulling forward while
bracing the cabinet.
(Fig .2)
3. Cut the window sash seal to the proper length.
Peel off the backing and attach the Foam-PE to
the underside of the window sash.
4.
Insert the Frame guides into the bottom of the
cabinet.
(Fig .4)
Insert the Frame Curtain into the
5.
and Frame Guides.
(Fig .4)
Fasten the curtains to the unit with 8 Type
6.
A screws.
(Fig .4)
(Fig .1)
(Fig .3)
Upper Guide
Upper guide
Screw
(Type A)
1
Foam-PE
Frame guide
12
Shipping screws
Fig. 1
Fig. 2
Fig. 3
Screw(Type A)
1
Fig. 4
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cp12e10Cp10Cp12

Table of Contents