Installing the Cisco uBR7225VXR Router
This chapter explains how to install and connect a Cisco uBR7225VXR universal broadband router and
contains the following sections:

Cisco uBR7225VXR Router Installation Checklist

A rack-mount and cable-management kit is included in the shipping container. The rack-mount brackets
in the kit are for mounting the Cisco uBR7225VXR in standard, 19-inch-wide, 4-post equipment racks
or telco-type equipment racks. The rack-mount brackets are not suitable for use with other racks, such
as 23-inch telco racks. The cable-management bracket is designed to relieve the strain on interface cables
that are installed on cable interface line cards in a Cisco uBR7225VXR router.
If you are installing an equipment shelf or using mounting hardware other than that supplied with the
chassis, review the guidelines in the
"Cisco uBR7225VXR Router Chassis Rack-Mounting Options" section on page
If you do not plan to install your Cisco uBR7225VXR router in an equipment rack, proceed to the
"Installing the Chassis in a Workbench or Tabletop Environment" section on page
To assist you with your installation and to provide a historical record of what was done, and by whom,
use
checklist and indicate when each procedure or verification is completed. When the checklist is
completed, place it in your site log (see
new router.
OL-17309-01
Cabling, page 3-13
Connecting Power, page 3-16
"Cisco uBR7225VXR Router Installation Checklist" section on page
Cisco uBR7225VXR Universal Broadband Router Hardware Installation Guide
C H A P T E R
"Equipment Racks" section on page
Appendix G, "Site
Log") along with the other records for your
3
2-15, then proceed to the
3-2.
3-12.
2. Make a copy of this
3-1

Advertisement

Table of Contents
loading

Table of Contents