Chapter 2 Preparing For Installation - Cisco EF4116 Hardware Installation And Maintenance Manual

4000 series
Table of Contents

Advertisement

C H A P T E R
2
Preparing for Installation
This chapter describes the equipment and site requirements for router installation. This chapter
includes the cabling requirements for the installation site, descriptions of additional equipment you
will need to complete the installation, and the environmental conditions the site must meet to
maintain normal operation. Instructions for inspecting the system are included in the section
"Inspecting the System." This chapter includes the following preinstallation requirements:
Safety recommendations to protect you and your equipment
— Safety with electricity
— Preventing electrostatic discharge (ESD) damage
General site requirements
— Plant wiring (interference considerations, signaling, and distance limitations)
— Site environment
— Site configuration precautions
Installation Checklist (a table that lists each installation step that you can check off after
completing and then save as a permanent record in your site log)
Site Log instructions and sample format
Tools and equipment required for installation
Preparations for making connections
— Slot numbering
— Unit numbering
Console and auxiliary port connection considerations
Network connection considerations
New system inspection guidelines
Preparing for Installation 2-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents