Integrated Installation
Installation Checklist
To ensure a safe and proper installation, the following
checklist should be completed by the installer to ensure
that no part of the installation has been overlooked.
INSTALLATION CHECKLIST
Has the anti-tip bracket been installed properly and is
it making contact with the unit?
Is the unit level? Are all leveling legs making contact
with the floor?
Is the power cord plugged into a properly grounded
3-prong outlet, which has been installed in accordance
with all applicable electrical codes?
Is the water supply connected for units with an
automatic ice maker? Have you checked for leaks?
Has the kickplate/grille been installed properly?
Are panels attached securely and properly aligned?
Has the door been aligned for proper appearance and
operation?
Does the customer understand the unit's operation?
Have you given the customer the warranty package?
Have any installation or service problems been noted
on the product registration card? Has the registration
card been mailed in?
Have stainless steel panels been inspected for any
imperfections? This is to be done by the dealer or
installer with the customer upon completion of the
installation. Stainless steel panels are covered by a
limited 60-day parts and labor warranty for cosmetic
defects.
21
subzero.com/specs
Need help?
Do you have a question about the IC27RLH and is the answer not in the manual?