In accordance with the European safety standard EN 62485-2, metal battery
frames must be insulated against the battery and the installation site.
Compliance with the applicable safety standard must be observed not only in
relation to the stacking device, but also to the entire battery system.
Any other use of the battery rack is not permitted. Installation and
maintenance work on the battery system may only be carried out by trained
specialist personnel. Modifications to the stacking device may result in a
change in the load capacity. Modifications must be carried out in accordance
with the supplier's instructions.
Our stacking device has a protective insulated coating and is also insulated
from the floor with plastic plates. Once the battery system has been installed,
a "protective insulation" notice must be affixed in the visible area. Metal
components with a damaged coating must be repaired or replaced with
undamaged components in order to guarantee the protective insulation.
4 Requirements for the installation site
When determining the installation location and space requirements, as well
as when carrying out the installation work, please refer to the valid installation
drawing, if available. It should also be noted that the 1-row stacking devices
must be positioned at the planned installation site before installation. The
stacking device is a plug-in system that must also be bolted together with the
supplied fastening screws for increased safety. The stacking devices must be
fastened to the wall using the wall fasteners supplied before they are loaded.
The floor must be suitable for the installation of the subsequent battery
system.
The following points must be taken into account:
➢
Level floor
➢
Suitable load-bearing capacity of the floor (load-bearing capacity
must be checked before installation)
➢
Sufficient conductivity
➢
Shock/vibration-free
➢
Minimum distances in accordance with EN 62485-2 must be
ensured
➢
Sufficient room ventilation must be ensured
➢
The air in the battery room must be free of impurities