Installing The Dc Power Supply In The Switch - Cisco Catalyst 3560X-24T Hardware Installation Manual

Cisco catalyst 3560x-24t: specifications
Hide thumbs Also See for Catalyst 3560X-24T:
Table of Contents

Advertisement

Installing a DC Power Supply
Use the ground screw to attach the single-ground lug to the switch rear panel. Use two ground screws to
Step 5
attach the dual-hole lug to the switch rear panel
Step 6
Using a ratcheting torque screwdriver, torque the ground-lug screws to 60 lbf-in. (960 ozf-in.).
Connect the other end of the grounding wire to an appropriate grounding point at your site or to the rack.
Step 7
Figure 3-10
1

Installing the DC Power Supply in the Switch

See the
Step 1
Turn off DC power. To ensure that power is off, change the circuit breakers to the OFF position, and tape
the circuit-breaker switches in the OFF position.
Remove the plastic safety cover from the power supply terminal blocks
Step 2
If you are not replacing a DC power supply, go to
Use a number-2 Phillips screwdriver to remove the DC-input power wires from the power terminals.
Step 3
Press the release latch at the right side of the power supply module inward, and pull the power supply out.
Step 4
Step 5
Insert the power supply in the power-supply slot, and gently push it into the slot
correctly installed, the DC power supply (excluding the extraction handle) is flush with the switch rear
panel.
Catalyst 3750-X and 3560-X Switch Hardware Installation Guide
3-10
Attaching the Ground Lug and Wire Assembly
Single-ground screw and lug ring
Installation Guidelines, page
Chapter 3
(Figure
3-10).
1
C O N S O
L E
A U X
S T A C K
R E S E T
1
S T A C K
2
2
C O N S O
L E
A U X
S T A C K
R E S E T
1
S T A C K
2
2
Dual-ground adaptor and dual-hole lug
3-5.
Step
5.
Power Supply and Fan Module Installation
(Figure
3-4).
(Figure
3-11). When
OL-19593-01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents